Tag 02 - sein und Fragen
Tag 02 von 60 - die Umlaute, das Verb sein, die Fragewörter. Zwei Stunden.
Yesterday you could say who you are. Today you get the verb that carries half of all beginner German - sein - in all six of its forms, and the three question words that open almost every real conversation: wie, wo, was.
The sounds today are the three umlauts. Two of them, ö and ü, do not exist in English at all. That is not a problem to postpone; it is the single thing that makes a beginner sound foreign for years if it is skipped in week one.
Everything from yesterday comes back first, before anything new is added.
1. Aufwärmen - gestern
Section titled “1. Aufwärmen - gestern”Ten items from Tag 01, cold, before you look at anything. If more than three go wrong, reread yesterday’s section 2 before you carry on.
2. Aussprache - die Umlaute ä, ö, ü
Section titled “2. Aussprache - die Umlaute ä, ö, ü”Three letters, three sounds. One is easy, two are not.
ä is the easy one: it is simply an e. Long ä sounds like the ay in say held flat; short ä sounds like the e in bed. For a beginner, treating ä and e as the same sound is accurate enough. Käse and Bäcker give you both lengths.
ö and ü are built the same way, and there is a mechanical trick for each. Say a vowel, freeze your tongue, then move only your lips:
| Umlaut | Start from | Then | Beispiel |
|---|---|---|---|
| ö | say e as in say | keep the tongue exactly there, round the lips as if for o | schön, hören, Köln |
| ü | say ee as in see | keep the tongue exactly there, round the lips as if for oo | müde, über, Tschüss |
That is the whole secret: tongue forward, lips rounded. English never combines those two things, which is why there is no English equivalent to point at. If you round the lips and let the tongue slide back as well, ö collapses into oh and ü collapses into oo - that is the mistake to listen for.
The contrast that matters most in week one is ä against e, because they are close, and ü against u, because they are not:
| Paar | Unterschied |
|---|---|
| Bäcker / Becker | almost none - both are the e sound |
| müde / Mude | ü is lips rounded, tongue forward |
| über / Uber | same |
| schön / schon | ö versus plain o, and the meaning changes |
| Köln / Kohlen | ö versus long o |
3. Neue Bausteine - zwölf Stück
Section titled “3. Neue Bausteine - zwölf Stück”Das Verb sein
Section titled “Das Verb sein”German has one verb you cannot avoid, and it is irregular in every person. Learn it as a block, out loud, six forms in one breath, the way you would learn a phone number:
| Person | Form | Beispiel |
|---|---|---|
| ich | bin | Ich bin müde |
| du | bist | Du bist Student |
| er / sie / es | ist | Das ist ein Café |
| wir | sind | Wir sind aus Indien |
| ihr | seid | Ihr seid in Hamburg |
| sie / Sie | sind | Sind Sie aus Deutschland |
Two things to notice now and stop being surprised by later. Sie with a capital is the polite you, and it takes the same form as they: sind. And German does not use an article before a job: Ich bin Student, never ich bin ein Student.
Die Fragewörter wie, wo, was
Section titled “Die Fragewörter wie, wo, was”| Wort | English | Frage |
|---|---|---|
| wie | how / what (in a name) | Wie geht es Ihnen? |
| wo | where | Wo ist der Bahnhof? |
| was | what | Was ist das? |
The pattern is fixed and worth saying aloud five times: question word, then the verb, then the rest. Wo ist der Bahnhof? Never wo der Bahnhof ist.
Die zwölf Bausteine
Section titled “Die zwölf Bausteine”Read each aloud twice before the drill.
| Deutsch | English | Wann |
|---|---|---|
| Wie geht es Ihnen? | how are you | formal, the standard opener |
| Danke, gut | fine, thanks | the standard answer |
| Und Ihnen? | and you | hand the question back |
| Ich bin müde | I am tired | sein, ich form |
| Ich bin Student | I am a student | no article before a job |
| Sind Sie aus Deutschland? | are you from Germany | verb first in a yes-no question |
| Wo ist der Bahnhof? | where is the station | the most useful sentence in Germany |
| Was ist das? | what is that | point at the thing |
| Das ist ein Café | that is a cafe | the answer to the one above |
| Entschuldigung | excuse me | to open, or to apologise |
| Sprechen Sie Englisch? | do you speak English | use it late, not first |
| Ich verstehe nicht | I do not understand | say this instead of going silent |
4. Drills
Section titled “4. Drills”Mechanical on purpose. Speed first, thought second.
Substitutionsdrill
Section titled “Substitutionsdrill”Keep the sentence, change the person, fix the form of sein.
Konversionsdrill
Section titled “Konversionsdrill”Turn the statement into the question that would produce it, or swap the question word.
Antwortdrill
Section titled “Antwortdrill”Answer as yourself, in a full sentence.
Übersetzungsdrill
Section titled “Übersetzungsdrill”5. Wiederholung
Section titled “5. Wiederholung”Today’s twelve mixed back in with yesterday’s twelve, on the clock. Run it once now, then once more at the end of your two hours.
6. Text und Hören
Section titled “6. Text und Hören”Every line uses only Tag 01 and Tag 02.
A: Guten Tag! Wie geht es Ihnen? B: Danke, gut. Und Ihnen? A: Ich bin müde. Entschuldigung, wo ist der Bahnhof? B: Was ist das? Ich verstehe nicht. A: Der Bahnhof. Sprechen Sie Englisch? B: Nein. Ich bin Student. Ich bin aus Indien. A: Ja, genau. Auf Wiedersehen! B: Tschüss!
Read it aloud twice, both parts. Then cover the text and say A’s lines from memory - A is the one asking the questions, which is the harder half.
Und dann Hören, fünf Minuten. Same clip, different job, and this is the half that self-study usually skips.
Play the whole forty seconds three times, without stopping and without reading anything on this page.
- First pass - words. Write down every German word you catch. Three is a result. Nine is a good day.
- Second pass - one sentence. Write down one complete sentence, even if half of it is a guess.
- Third pass - check yourself. Listen again and correct what you wrote.
There is no answer key, deliberately. No transcript is printed here and you are not meant to go hunting for one. A transcript would spare you the exact thing being trained: holding unfamiliar German in your head long enough to make sense of it. The clip never changes, so the only thing that can improve between today and the last day is you.
7. Bidirektional
Section titled “7. Bidirektional”Translate into German, then reveal and read the difference between your line and the model out loud. The comparison is the lesson, not the score. On Tag 05 you will translate these back the other way, so do them properly now.
8. Sprechen - zehn Minuten
Section titled “8. Sprechen - zehn Minuten”Paste this into a voice AI and actually speak. Ten minutes, out loud, standing up.
Du bist eine freundliche Person an einem Bahnhof in Hamburg. Ich binAnfänger (Tag 2, A1). Sprich sehr langsam und nur mit diesen Wörtern:Guten Tag, Hallo, Tschüss, Auf Wiedersehen, Entschuldigung, Wie geht esIhnen, Danke gut, Und Ihnen, Ich bin müde, Ich bin Student, Sind Sie ausDeutschland, Wo ist der Bahnhof, Was ist das, Das ist ein Café, SprechenSie Englisch, Ich verstehe nicht, Ich heiße, Ich wohne in, Ich bin aus,Ja genau, Nein danke.Stelle mir drei Fragen: wie es mir geht, woher ich komme, und ob ichStudent bin. Benutze nur die Formen von sein: bin, bist, ist, sind, seid.Maximal sechs Wörter pro Satz. Wenn ich einen Fehler mache, wiederhole denSatz einfach richtig, ohne Erklärung. Fang jetzt an und begrüße mich.9. Auf Papier
Section titled “9. Auf Papier”Diktat. Play the shadowing audio again. Write down any five German words you hear, by hand, without pausing. Then mark every umlaut you wrote, and any you think you heard but could not place.
Satz des Tages. Write the six forms of sein by hand, in order, without looking: ich, du, er, wir, ihr, Sie. Then write three sentences by hand, from memory:
- That you are tired.
- That you are a student and you are from India.
- A question asking a stranger where the station is.
Check them against section 3 only after all three are on paper.
Fehlerliste. Add today’s wrong answers to the Fehler page in your notebook, in German, correctly, no English. If a mistake was an umlaut, circle the umlaut.
Genus-Farben. Still nothing to do - the first nouns arrive tomorrow. Get three coloured pens ready today: blue for der, red for die, green for das.
Goldlist. Starts tomorrow. Today, just put a dated heading on a fresh double page of your notebook and leave it empty.
Weiter: Tag 03 - der, die, das - die Diphthonge ei, ie, eu, au, die Laute ch und sch, und die drei Geschlechter.