Tag 15 - Modalverben I
Tag 15 von 60 - können und müssen, der Infinitiv am Ende, das unpersönliche man. Zwei Stunden.
Yesterday a prefix went to the end of the sentence. Today a whole verb does, and it is the same bracket doing the same job - which means week three starts by cashing in work you already did.
Modal verbs are the six verbs that modify another verb: can, must, want, may, should, would like. They are the most used verbs in spoken German after sein and haben, and you have been producing three of them since week two without being told:
**Können** Sie das wiederholen?- Tag 08**Darf** ich Sie etwas fragen?- Tag 09Ich **möchte** bezahlen- Tag 10
Each of those is a modal verb in position two with an infinitive at the end. Today the rule behind them, with the two most useful members of the family: können and müssen.
1. Aufwärmen - zehn Stück aus Tag 14
Section titled “1. Aufwärmen - zehn Stück aus Tag 14”The bracket, cold.
2. Shadowing - zehn Minuten
Section titled “2. Shadowing - zehn Minuten”Und dann Hören, fünf Minuten. Same clip, different job, and this is the half that self-study usually skips.
Play the whole forty seconds three times, without stopping and without reading anything on this page.
- First pass - words. Write down every German word you catch. Three is a result. Nine is a good day.
- Second pass - one sentence. Write down one complete sentence, even if half of it is a guess.
- Third pass - check yourself. Listen again and correct what you wrote.
There is no answer key, deliberately. No transcript is printed here and you are not meant to go hunting for one. A transcript would spare you the exact thing being trained: holding unfamiliar German in your head long enough to make sense of it. The clip never changes, so the only thing that can improve between today and the last day is you.
3. Neue Bausteine - zwölf Stück
Section titled “3. Neue Bausteine - zwölf Stück”können und müssen
Section titled “können und müssen”| Person | können | müssen |
|---|---|---|
| ich | kann | muss |
| du | kannst | musst |
| er / sie / es | kann | muss |
| wir | können | müssen |
| ihr | könnt | müsst |
| sie / Sie | können | müssen |
Two things to notice, and both are patterns rather than exceptions:
ichander/sie/esare identical, and both take no ending at all. Notich kanne. Justkann. This is true of every modal verb in German, and it is the same oddity you met inich möchte / er möchteon Tag 10.- The vowel changes in the singular.
können → kann,müssen → muss. The plural keeps the dictionary vowel.
Die Klammer, zweite Runde
Section titled “Die Klammer, zweite Runde”The rule is yesterday’s rule with an infinitive instead of a prefix:
The modal verb goes in position two. The other verb goes to the very end, in its dictionary form.
| Position 2 | …alles andere… | Ende |
|---|---|---|
| Ich kann | heute nicht | kommen. |
| Ich muss | jetzt | gehen. |
| Können Sie | mir | helfen? |
| Muss ich | hier | warten? |
| Ich kann | gut | kochen. |
| Was muss ich | machen? |
The infinitive is the form you find in a dictionary - kommen, gehen, helfen - with no ending changed for the person. The modal verb carries all the grammar; the second verb carries all the meaning and does nothing else.
Das unpersönliche man
Section titled “Das unpersönliche man”One extra word today, and it does a lot of work. man means one, you, people in general - it is how German states a rule or a general possibility.
| Deutsch | English |
|---|---|
| Hier kann man parken. | You can park here. |
| Hier kann man nicht rauchen. | You cannot smoke here. |
| Kann man hier bezahlen? | Can one pay here? |
| Wie sagt man das auf Deutsch? | How do you say that in German? |
man always takes the er/sie/es form of the verb. And it is not der Mann - one n, no capital letter, and nothing to do with men.
Wie sagt man das auf Deutsch? is the single most useful question in this entire course. Learn it today and use it every day for the rest of your life.
Die zwölf Bausteine
Section titled “Die zwölf Bausteine”| Deutsch | English | Wann |
|---|---|---|
| Ich kann heute nicht kommen | I cannot come today | infinitive last |
| Ich muss jetzt gehen | I have to go now | the polite exit |
| Können Sie mir helfen? | can you help me | now you know why |
| Können Sie das wiederholen? | can you repeat that | same shape, from Tag 08 |
| Ich muss noch lernen | I still have to study | noch means still |
| Was muss ich machen? | what do I have to do | |
| Muss ich hier warten? | do I have to wait here | |
| Ich kann das nicht lesen | I cannot read that | |
| Ich kann Sie nicht hören | I cannot hear you | for a bad phone line |
| Wie sagt man das auf Deutsch? | how do you say that in German | the best question here |
| Hier kann man nicht rauchen | you cannot smoke here | man plus a rule |
| Kann ich bitte bezahlen? | can I pay, please | more natural than möchte |
4. Drills
Section titled “4. Drills”Substitutionsdrill
Section titled “Substitutionsdrill”Replace the infinitive at the end. Everything before it stays.
Konversionsdrill - ein Modalverb einsetzen
Section titled “Konversionsdrill - ein Modalverb einsetzen”Take the plain sentence and rebuild it with the modal verb given. The old verb goes to the end as an infinitive.
Antwortdrill
Section titled “Antwortdrill”Übersetzungsdrill
Section titled “Übersetzungsdrill”5. Wiederholung
Section titled “5. Wiederholung”Yesterday, two days back, five days back, twelve days back. Tag 03 is the twelve-day-old one - the genders, which everything since has been built on.
6. Text und Hören
Section titled “6. Text und Hören”Cancelling a plan, which is almost pure modal verb.
Anna: Hallo Ravi! Kommen Sie heute Abend mit? Ravi: Es tut mir leid, ich kann heute nicht kommen. Anna: Oh. Warum nicht? Ravi: Ich muss noch lernen. Der Kurs fängt morgen um neun an. Anna: Verstehe. Können Sie am Freitag? Ravi: Ja, am Freitag kann ich. Was müssen wir machen? Anna: Nichts! Wir gehen ins Café. Ravi: Gut. Kann man dort auch essen? Anna: Ja, man kann dort sehr gut essen. Ravi: Wie sagt man “cake” auf Deutsch? Anna: Kuchen. Der Kuchen dort schmeckt sehr gut. Ravi: Dann muss ich den Kuchen probieren. Ich rufe Sie am Freitag an. Anna: Alles klar. Bis Freitag!
warum is why, nichts is nothing, dort is there, probieren is to try. All free.
Notice am Freitag **kann** ich - the modal verb has moved to position two because am Freitag took position one, exactly as the Tag 05 rule predicts. The word order rule from week one is still running underneath everything.
Read it aloud twice, both parts. Then cover Ravi’s lines and produce them from Anna’s cues.
7. Bidirektional
Section titled “7. Bidirektional”Into German today. On Tag 17 you will translate these back the other way, so do them properly now, out loud, before you type.
8. Sprechen - zehn Minuten
Section titled “8. Sprechen - zehn Minuten”Being asked for things you have to refuse, which forces kann nicht and muss repeatedly. Stand up.
Du bist Anna, eine Bekannte aus Hamburg. Ich bin Anfänger (Tag 15, A1).Heute übe ich können und müssen mit dem Infinitiv am Satzende.
Lade mich zu fünf verschiedenen Dingen ein - heute Abend, morgen, amFreitag, am Montag, am Samstag. Frag jedes Mal: Können Sie kommen?Kommen Sie mit? Haben Sie Zeit?
Ich werde meistens ablehnen und einen Grund nennen. Frag dann immer:Warum nicht? Und: Was müssen Sie machen?
Sprich langsam, maximal acht Wörter pro Satz. Wenn ich den Infinitiv nichtans Ende stelle - "Ich kann kommen nicht heute" - wiederhole meinen Satzeinfach richtig, ohne Erklärung, und mach weiter. Fang jetzt an.9. Auf Papier - Goldlist
Section titled “9. Auf Papier - Goldlist”Diktat. Ten-second loop on the shadowing audio. Write six German words by hand without pausing, then correct in a second colour.
Satz des Tages. Write out by hand, from memory, six refusals with reasons: you cannot come today, you have to study, you cannot come tomorrow either, you have to work, you can come on Friday, you will call on Friday. Six lines, every one ending in a verb. Check against section 3 and section 6.
Die Klammer, Runde zwei. Take the four sentences from yesterday where you drew the bracket, and write four new ones underneath with a modal verb instead of a prefix. Draw the bracket on these too. You are proving to yourself that Ich stehe ... auf and Ich muss ... aufstehen are the same shape - and in that second one, both parts go to the end: Ich muss um sieben Uhr aufstehen.
Fehlerliste. Week-three page. Every item the drills marked wrong today, in German only. Any sentence where the infinitive was not last gets written twice.
Genus-Farben. Two new nouns: blue der Freitag, der Samstag. Both days, both masculine, consistent with yesterday’s rule in capitals at the top of the page.
Goldlist 5.
Fifth Goldlist page. The schedule so far: Goldlist 1 (Tag 03) distils on Tag 17, which is in two days. Goldlist 2 (Tag 06) on Tag 20, Goldlist 3 (Tag 09) on Tag 23, Goldlist 4 (Tag 12) on Tag 26. You open none of them today.
-
Fresh double page, today’s date, plus Goldlist and the number 5.
-
Twenty-five items by hand, German left, English right, numbered. Take them from Tag 13 and Tag 14 - the dative verbs and the separable verbs. Nothing already on Goldlists 1 to 4.
-
Say each item aloud once as you write it. Once.
-
Read the whole list aloud once when finished, slowly, without stopping.
-
Close the notebook and walk away. No testing, no rereading tonight.
-
Write in your calendar, 14 days from today: Goldlist 5 distillieren - that is Tag 29.
Weiter: Tag 16 - Modalverben II - wollen, dürfen und sollen, der Unterschied zwischen muss nicht und darf nicht, und alle sechs Modalverben auf einer Seite.