Tag 52 - Konjunktiv II
Tag 52 von 60 - würde, könnte, hätte, wäre. Höflichkeit und Hypothesen. Zwei Stunden.
The hardest page in the course, and not because the forms are difficult. They are easy - four verbs and one pattern. It is hard because it changes the register of everything you already say, and that means today’s two hours are spent re-saying fifty-one days of German one notch more politely.
It also explains something that has been sitting unexplained since Tag 10. möchte is a Konjunktiv II. It is the subjunctive of mögen, and the reason Ich möchte einen Kaffee sounds polite while Ich will einen Kaffee sounds blunt is precisely the thing you are learning today. You have been using this form, correctly, for six weeks.
1. Aufwärmen - zehn Stück aus Tag 51
Section titled “1. Aufwärmen - zehn Stück aus Tag 51”The relative clauses, cold.
2. Shadowing - zehn Minuten
Section titled “2. Shadowing - zehn Minuten”Und dann Hören, fünf Minuten. Same clip, different job, and this is the half that self-study usually skips.
Play the whole forty seconds three times, without stopping and without reading anything on this page.
- First pass - words. Write down every German word you catch. Three is a result. Nine is a good day.
- Second pass - one sentence. Write down one complete sentence, even if half of it is a guess.
- Third pass - check yourself. Listen again and correct what you wrote.
There is no answer key, deliberately. No transcript is printed here and you are not meant to go hunting for one. A transcript would spare you the exact thing being trained: holding unfamiliar German in your head long enough to make sense of it. The clip never changes, so the only thing that can improve between today and the last day is you.
3. Neue Bausteine - der Konjunktiv II
Section titled “3. Neue Bausteine - der Konjunktiv II”Die vier Formen, die alles tragen
Section titled “Die vier Formen, die alles tragen”| haben | sein | können | werden | |
|---|---|---|---|---|
| ich | hätte | wäre | könnte | würde |
| du | hättest | wärst | könntest | würdest |
| er / sie / es | hätte | wäre | könnte | würde |
| wir | hätten | wären | könnten | würden |
| ihr | hättet | wärt | könntet | würdet |
| sie / Sie | hätten | wären | könnten | würden |
Note the shape: these are the Präteritum forms from Tag 29 with an umlaut - hatte becomes hätte, war becomes wäre, konnte becomes könnte, wurde becomes würde. Which means today costs you almost no new memorisation.
And three more that come up constantly:
| müssen | müsste - I would have to |
| sollen | sollte - I ought to, you should |
| dürfen | dürfte - I might be allowed to |
| mögen | möchte - I would like, from Tag 10 |
Die Regel: würde plus Infinitiv - außer bei diesen
Section titled “Die Regel: würde plus Infinitiv - außer bei diesen”For almost every verb, the Konjunktiv II is built like the future: würde plus the infinitive at the end.
| Deutsch | English |
|---|---|
| Ich würde gern einen Termin machen. | I would like to make an appointment. |
| Ich würde mich freuen. | I would be glad. |
| An Ihrer Stelle würde ich anrufen. | In your position I would call. |
But not with haben, sein, können, müssen and sollen. Those have their own forms, and using würde with them is a learner’s error:
| Richtig | Falsch |
|---|---|
| Ich hätte eine Frage. | |
| Das wäre sehr nett. | |
| Könnten Sie mir helfen? | |
| Ich müsste erst fragen. |
So the working rule is short: hätte, wäre, könnte, müsste, sollte on their own; würde plus infinitive for everything else.
Hypothesen - wenn plus Konjunktiv, zweimal
Section titled “Hypothesen - wenn plus Konjunktiv, zweimal”For something unreal or unlikely, both halves go into the Konjunktiv:
| Deutsch | English |
|---|---|
| Wenn ich Zeit hätte, würde ich kommen. | If I had time, I would come. |
| Wenn ich besser Deutsch könnte, wäre alles leichter. | If my German were better, everything would be easier. |
| Wenn die Wohnung billiger wäre, würde ich sie nehmen. | If the flat were cheaper, I would take it. |
| Wenn ich du wäre, würde ich anrufen. | If I were you, I would call. |
Compare that with yesterday’s real condition: Wenn ich Zeit **habe**, **rufe** ich dich an - present tense, both halves, and it means if I have time, which I might. Swap in hätte and würde and it means if I had time, which I do not.
That single swap is the whole difference between a plan and a regret, and German makes it entirely with the verb forms.
Ratschläge geben
Section titled “Ratschläge geben”| Deutsch | English |
|---|---|
| Du solltest früher anfangen. | you should start earlier |
| Sie sollten einen Termin machen. | you should make an appointment |
| An Ihrer Stelle würde ich anrufen. | in your position I would call |
| Ich würde das nicht machen. | I would not do that |
| Es wäre besser, wenn Sie schreiben. | it would be better if you wrote |
An Ihrer Stelle würde ich ... is the single most useful advice formula in German, because it gives an opinion without telling anybody what to do.
Die zwölf Bausteine
Section titled “Die zwölf Bausteine”| Deutsch | English | Wofür |
|---|---|---|
| Ich würde gern einen Termin machen | I would like to make an appointment | höflicher Wunsch |
| Könnten Sie mir bitte helfen? | could you help me, please | höfliche Bitte |
| Hätten Sie am Montag Zeit? | would you have time on Monday | die natürlichste Frage |
| Wäre das möglich? | would that be possible | nach einer Bitte |
| Ich hätte eine Frage | I have a question (softened) | vor einer Frage |
| Ich würde mich freuen | I would be glad | E-Mail, Schluss |
| Wenn ich Zeit hätte, würde ich kommen | if I had time, I would come | Hypothese |
| Wenn ich besser Deutsch könnte, wäre alles leichter | if my German were better, everything would be easier | Hypothese |
| An Ihrer Stelle würde ich anrufen | in your position I would call | Ratschlag |
| Du solltest früher anfangen | you should start earlier | Ratschlag |
| Das wäre sehr nett | that would be very kind | Dank im Voraus |
| Ich müsste erst fragen | I would have to ask first | höfliche Verzögerung |
4. Drills
Section titled “4. Drills”Formendrill
Section titled “Formendrill”Höflichkeitsdrill - eine Stufe höher
Section titled “Höflichkeitsdrill - eine Stufe höher”Take the blunt version and move it up one rung. This is the drill that matters.
Hypothesendrill
Section titled “Hypothesendrill”Both halves in the Konjunktiv.
Ratschlagdrill
Section titled “Ratschlagdrill”Give the advice three ways: with sollte, with An Ihrer Stelle, and with Es wäre besser, wenn ....
Konversionsdrill - würde oder eigene Form
Section titled “Konversionsdrill - würde oder eigene Form”Half of these need würde plus infinitive; half have their own form. Decide.
Übersetzungsdrill
Section titled “Übersetzungsdrill”5. Wiederholung
Section titled “5. Wiederholung”Yesterday, two days back, five days back, twelve days back, thirty days back. Tag 22 is the thirty-day-old one - the two-way prepositions.
6. Text und Hören
Section titled “6. Text und Hören”Two versions of the same conversation at the Bürgeramt. The content is identical. Read both aloud and listen to the difference.
Version A - alles im Indikativ
Ravi: Ich will einen Termin. Beamtin: Wann? Ravi: Am Montag. Geht das? Beamtin: Montag ist voll. Ravi: Und Dienstag? Ich habe eine Frage - muss ich die Bestätigung mitbringen? Beamtin: Ja. Ravi: Gut. Schicken Sie mir eine Bestätigung per E-Mail. Beamtin: Mache ich.
Version B - mit Konjunktiv II
Ravi: Guten Tag. Ich würde gern einen Termin machen. Beamtin: Gern. Wann hätten Sie Zeit? Ravi: Hätten Sie am Montag etwas frei? Beamtin: Montag ist leider voll. Dienstag ginge noch. Ravi: Dienstag wäre auch gut. Ich hätte noch eine Frage - müsste ich die Bestätigung mitbringen? Beamtin: Ja, die brauchen wir auf jeden Fall. Ravi: Könnten Sie mir die Terminbestätigung per E-Mail schicken? Das wäre sehr nett. Beamtin: Natürlich. Sie bekommen sie heute noch.
Nothing in Version A is grammatically wrong. Every sentence is correct German, and the appointment gets made. But read it aloud and listen: it is a series of demands, and the official answers in single words.
In Version B the same eight exchanges carry würde, hätte, müsste, könnte and wäre - and notice what happens on the other side of the counter. She says Gern, she offers an alternative, she explains, and she promises it for today. That is not politeness being rewarded with politeness as a moral matter; it is that Version B sounds like a conversation and Version A sounds like a transaction.
ginge is the Konjunktiv of gehen - would be possible - and auf jeden Fall means in any case.
Read Version B four times. It is the single most reusable page of dialogue in the whole course.
7. Bidirektional
Section titled “7. Bidirektional”Into German today. On Tag 54 you will translate these back the other way.
8. Sprechen - zehn Minuten
Section titled “8. Sprechen - zehn Minuten”The same requests, twice, one rung apart. Stand up.
Du bist mein Deutschlehrer. Ich bin Lernender (Tag 52). Heute habe ichden Konjunktiv II gelernt: würde, könnte, hätte, wäre.
ERSTER TEIL - fünf Minuten, die Höflichkeitsleiter.
Gib mir zwölf Situationen, in denen ich etwas BRAUCHE: einen Termin,Hilfe mit einem Formular, eine Wiederholung am Telefon, eineTerminbestätigung per E-Mail, mehr Zeit, einen Rückruf.
Ich sage es ZWEIMAL: einmal direkt, einmal höflich mit Konjunktiv. Dusagst nur, welche Version ein Deutscher am Schalter benutzen würde.
ZWEITER TEIL - fünf Minuten, Hypothesen und Ratschläge.
Stell mir sechs Fragen mit "Was würden Sie machen, wenn ...?" - und ichmuss mit zwei Konjunktiven antworten.
Dann erzähl mir drei Probleme, und ich gebe dir einen Ratschlag, jeweilsmit "An Ihrer Stelle würde ich ..." oder "Sie sollten ...".
Korrigiere nur zwei Dinge: ein fehlender Umlaut, und würde bei haben,sein oder können.9. Auf Papier - Goldlist
Section titled “9. Auf Papier - Goldlist”Diktat. Ten-second loop on the shadowing audio. Six German words by hand, then correct in a second colour.
Die vier Tabellen. Write hätte, wäre, könnte and würde out by hand in all six persons. Twenty-four forms. Then next to each, write its Präteritum form from Tag 29 - hatte, war, konnte, wurde - and mark the umlaut in a second colour. That is the whole of today’s morphology on one page.
Die Höflichkeitsleiter, von Hand. Copy the five-rung table from section 3, then build your own ladder for a different request - asking for a callback, or for more time, or for a document. Five rungs, by hand.
Version B, von Hand. Copy the Konjunktiv version of the Bürgeramt dialogue out by hand, all eight exchanges. It is the most directly reusable German on this page and handwriting is how it sticks.
Fünf Hypothesen über dich. By hand, in German, five real sentences in the pattern Wenn ich ..., würde ich ... - about your German, your work, your flat, Hamburg, the next year. Both halves in the Konjunktiv, and check both.
Fehlerliste. Week-eight page. Every wrong item, and in particular every place you used würde with haben, sein or können.
Genus-Farben. No new nouns. One pass down the list inside a polite request: Könnten Sie mir den Bus zeigen?, Hätten Sie eine Wohnung frei?. Six is enough.
Goldlist 8 - zweite Destillation.
Day 52, minus 28 is day 24, so this is the second and final distillation of Goldlist page 8 - written on Tag 24 and distilled once on Tag 38.
-
Find Goldlist 8 and its first distillation. Around 17 items.
-
Read them aloud, covering the English. Three seconds each.
-
Cross out everything you knew cleanly, with the right article.
-
Copy the survivors onto a fresh page under Goldlist 8 - zweite Destillation. Expect eight to twelve.
-
Page 8 is closed. Survivors onto the Problemliste at the back.
-
Nothing to diarise.
Weiter: Tag 53 - Verben mit Präpositionen - warten auf, denken an, sich freuen auf. Keine Regeln, nur eine Liste - und die acht Sätze von Tag 51 zurück.