Skip to content

Tag 16 - Modalverben II

Tag 16 von 60 - wollen, dürfen, sollen, und der Unterschied zwischen muss nicht und darf nicht. Zwei Stunden.


Yesterday gave you two modal verbs and the bracket. Today gives you the other four, and after this page the whole family is yours - which matters because almost everything polite, cautious or negotiable in German goes through a modal verb.

One of today’s four is a genuine trap and it is worth naming before you start. müssen nicht and dürfen nicht are not the same thing. English uses must not for the second meaning, which puts the word must in a sentence that has nothing to do with obligation, and that habit carries straight into German and inverts your meaning. By the end of section 3 you should be able to say which of those two belongs on a no-smoking sign.

Yesterday’s two modals, cold.

Und dann Hören, fünf Minuten. Same clip, different job, and this is the half that self-study usually skips.

Play the whole forty seconds three times, without stopping and without reading anything on this page.

  1. First pass - words. Write down every German word you catch. Three is a result. Nine is a good day.
  2. Second pass - one sentence. Write down one complete sentence, even if half of it is a guess.
  3. Third pass - check yourself. Listen again and correct what you wrote.

There is no answer key, deliberately. No transcript is printed here and you are not meant to go hunting for one. A transcript would spare you the exact thing being trained: holding unfamiliar German in your head long enough to make sense of it. The clip never changes, so the only thing that can improve between today and the last day is you.

Personwollendürfensollenmöchten
ichwilldarfsollmöchte
duwillstdarfstsollstmöchtest
er / sie / eswilldarfsollmöchte
wirwollendürfensollenmöchten
ihrwolltdürftsolltmöchtet
sie / Siewollendürfensollenmöchten

Same pattern as yesterday, every time: ich and er/sie/es identical and endingless, vowel changed in the singular except for sollen, which does not change at all.

VerbBedeutungBeispiel
wollento want (blunt)Ich will nach Berlin fahren.
möchtenwould like (polite)Ich möchte nach Berlin fahren.
dürfento be allowed toDarf ich hier parken?
sollenshould / to be supposed toSoll ich Sie abholen?

Both mean want, and the difference is social rather than grammatical. möchten is the polite, softened form - it is literally the subjunctive of mögen, which is why it looks odd. wollen is direct.

SituationNimm
im Café, im Geschäft, mit Fremdenmöchten
über eigene Pläne, mit Freundenwollen
Ich will einen Kaffee zum Kellnernicht - klingt grob

Use möchten as your default with strangers for the rest of your life, exactly as you learned on Tag 10. Use wollen when you are talking about your own plans to someone you know: Ich will Deutsch lernen is completely normal and Ich möchte Deutsch lernen is slightly more tentative.

The trap, with the table that resolves it:

DeutschEnglishBedeutung
Ich muss gehen.I have to go.obligation
Ich muss nicht gehen.I do not have to go.no obligation - I may stay
Ich darf gehen.I am allowed to go.permission
Ich darf nicht gehen.I must not go.prohibition

sollen is weaker than English should. Its core meaning is am I supposed to, does someone expect me to, and its single most useful shape is the offer:

DeutschEnglish
Soll ich Sie abholen?Shall I pick you up?
Soll ich helfen?Shall I help?
Was soll ich machen?What am I supposed to do?
Ich soll um acht da sein.I am supposed to be there at eight.

Soll ich ...? is how you offer to do something in German, and it is far more common than any construction with möchten. Learn it as the offering word.

DeutschEnglishWann
Ich will Deutsch lernenI want to learn Germanwollen, about your own plan
Ich will nach Berlin fahrenI want to go to Berlin
Was wollen Sie machen?what do you want to do
Darf ich hier parken?may I park hereasking permission
Darf ich rein?may I come inrein is short for herein
Hier darf man nicht rauchensmoking is not allowed hereprohibition
Sie dürfen hier nicht parkenyou are not allowed to park here
Soll ich Sie abholen?shall I pick you upthe offer
Soll ich helfen?shall I help
Was soll ich machen?what am I supposed to do
Ich soll um acht da seinI am supposed to be there at eightda sein, to be there
Ich muss nicht arbeitenI do not have to workno obligation

The core drill of the day. Pick the right modal from all six. Read the English carefully - several of these are the trap.

also is so, therefore and raus is out - both free, both very common.

Yesterday, two days back, five days back, twelve days back. Tag 04 is the twelve-day-old one.

A first day at a language school, which is where dürfen and sollen actually come up.

Lehrerin: Guten Tag! Sie sind neu, ja? Wie heißen Sie? Ravi: Ich heiße Ravi. Darf ich rein? Lehrerin: Ja, natürlich. Kommen Sie. Ravi: Was soll ich machen? Lehrerin: Sie können hier sitzen. Der Kurs fängt um neun an. Ravi: Darf ich hier essen? Lehrerin: Nein, hier darf man nicht essen. Aber trinken dürfen Sie. Ravi: Gut. Und muss ich jeden Tag kommen? Lehrerin: Nein, Sie müssen nicht jeden Tag kommen. Aber Sie sollen viel üben. Ravi: Ich will Deutsch lernen. Ich will gut sprechen. Lehrerin: Dann müssen Sie laut sprechen. Soll ich Ihnen das Buch zeigen? Ravi: Ja, bitte. Können Sie mir helfen? Lehrerin: Gern.

jeden Tag is every day, üben is to practise, laut is loud, sitzen is to sit. All free.

Notice Aber trinken dürfen Sie - the infinitive has moved to the front for emphasis, which is allowed and which you do not need to produce. Recognise it and move on.

Read it aloud twice, both parts. Then cover Ravi’s lines and produce them from the teacher’s cues.

Into German today. On Tag 18 you will translate these back the other way.

Asking permission in an unfamiliar building, which is almost pure dürfen and sollen. Stand up.

Du arbeitest am Empfang in einer Sprachschule in Hamburg. Ich bin
Anfänger (Tag 16, A1) und heute mein erster Tag. Ich übe dürfen, sollen,
wollen und müssen.
Ich frage dich, was ich darf und was ich machen soll. Antworte kurz und
langsam, maximal acht Wörter pro Satz, und benutze dabei: Sie dürfen,
Sie dürfen nicht, Sie müssen, Sie müssen nicht, Sie sollen, Sie können.
Frag mich auch: Was wollen Sie lernen? Was wollen Sie machen? Sollen
wir um neun anfangen?
Wenn ich "muss nicht" sage, wo "darf nicht" richtig wäre, wiederhole
meinen Satz einfach richtig, ohne Erklärung, und mach weiter.
Fang jetzt an und begrüße mich.

Diktat. Ten-second loop on the shadowing audio. Write six German words by hand without pausing, then correct in a second colour.

Satz des Tages. Write out by hand, from memory, six questions you would ask on a first day somewhere: may I come in, what am I supposed to do, may I eat here, do I have to come every day, shall I wait, can you help me. Six lines. Check against section 6.

Die Modalverben-Tabelle. The most useful page you will draw this week. One table, six columns, by hand:

könnenmüssenwollendürfensollenmöchten
ichkannmusswilldarfsollmöchte
Siekönnenmüssenwollendürfensollenmöchten
erkannmusswilldarfsollmöchte

Then write underneath, in a different colour and in capitals: MUSS NICHT = KEINE PFLICHT. DARF NICHT = VERBOTEN. That one line is the single highest-value sentence in your notebook this week.

Fehlerliste. Week-three page. Every item the drills marked wrong today, in German only. Every muss nicht / darf nicht confusion gets written twice.

Genus-Farben. One new noun: red die Lehrerin. Worth noting that -in on the end of a job title makes it feminine and is always die - der Lehrer and die Lehrerin, der Student and die Studentin. That is a second reliable gender rule; add it under the days-of-the-week one.

Goldlist. Not today. Goldlist 5 went in yesterday. The next page is Tag 18 - and Goldlist 1 from Tag 03 comes up for distillation tomorrow, so leave tonight free for it.


Weiter: Tag 17 - Die Uhrzeit - die Uhr, die Wochentage, Termine machen, und die erste Goldlist-Destillation.