Skip to content

Tag 28 - Wetter und Smalltalk

Tag 28 von 60 - es gibt, das Wetter, die Jahreszeiten, Smalltalk. Zwei Stunden.


Four weeks. The last day of this block, and it is deliberately the most practical: the weather, which is what Germans actually talk about in the first thirty seconds of any encounter, and es gibt, which is one of the half-dozen most useful constructions in the language.

Nothing structurally new, except one small thing worth its own section: es gibt takes the accusative, which trips people up because the English there is feels like a description rather than an action. Es gibt **einen** Supermarkt - there is a supermarket.

And then the four-week assessment, which is the honest part of today.

Opinions, cold.

Und dann Hören, fünf Minuten. Same clip, different job, and this is the half that self-study usually skips.

Play the whole forty seconds three times, without stopping and without reading anything on this page.

  1. First pass - words. Write down every German word you catch. Three is a result. Nine is a good day.
  2. Second pass - one sentence. Write down one complete sentence, even if half of it is a guess.
  3. Third pass - check yourself. Listen again and correct what you wrote.

There is no answer key, deliberately. No transcript is printed here and you are not meant to go hunting for one. A transcript would spare you the exact thing being trained: holding unfamiliar German in your head long enough to make sense of it. The clip never changes, so the only thing that can improve between today and the last day is you.

es gibt means there is and there are - one form for both, and it never changes:

DeutschEnglish
Es gibt einen Supermarkt in der Straße.There is a supermarket in the street.
Es gibt viele Cafés in Hamburg.There are a lot of cafés in Hamburg.
Gibt es hier ein Café?Is there a café here?
Es gibt kein Problem.There is no problem.
DeutschEnglish
Wie ist das Wetter?what is the weather like
Es ist warm / kaltit is warm / cold
Es ist schön / schlechtit is nice / bad
Es regnetit is raining
Es schneitit is snowing
Die Sonne scheintthe sun is shining
Es ist windigit is windy
Es sind zwanzig Gradit is twenty degrees

Almost all of these use es as an empty subject, exactly like English it. That makes the weather the easiest topic in German - no gender, no case, no plural.

Jahreszeitim …
der Frühlingim Frühling
der Sommerim Sommer
der Herbstim Herbst
der Winterim Winter

All four masculine, all taking im - which is in dem, the dative contraction from Tag 22.

The months are all masculine too: Januar, Februar, März, April, Mai, Juni, Juli, August, September, Oktober, November, Dezember, and all take im: im Januar, im Juli.

DeutschEnglishWann
Wie ist das Wetter?what is the weather likethe opener
Es ist kalt und es regnetit is cold and it is raining
Die Sonne scheintthe sun is shining
Es sind zwanzig Gradit is twenty degreesnote: sind, not ist
Im Sommer ist es warmin summer it is warmim plus verb second
Im Winter schneit es oftin winter it often snows
Gibt es hier einen Supermarkt?is there a supermarket hereaccusative
Es gibt viele Cafés in Hamburgthere are a lot of cafés in Hamburg
Das Wetter ist heute besserthe weather is better todaycomparative
Es ist schönes Wetter, nicht wahr?nice weather, isn’t itnicht wahr, the tag question
Ich mag den Sommer lieberI prefer the summeraccusative after mögen
Hoffentlich regnet es nichthopefully it will not rainhoffentlich plus verb second

Build the sentence with es gibt and the right accusative article.

Yesterday, two days back, five days back, twelve days back. Tag 16 is the twelve-day-old one.

The first minute of a conversation between neighbours, which is almost pure weather and es gibt.

Nachbarin: Guten Morgen! Schönes Wetter heute, nicht wahr? Ravi: Guten Morgen! Ja, die Sonne scheint. Es sind ungefähr zwanzig Grad. Nachbarin: Endlich! Letzte Woche hat es jeden Tag geregnet. Ravi: Das stimmt. Ich bin fast jeden Tag zu Hause geblieben. Nachbarin: Mögen Sie den Sommer lieber als den Winter? Ravi: Ja, viel lieber. Im Winter ist es hier zu kalt für mich. Nachbarin: In Indien ist es wärmer, nicht wahr? Ravi: Viel wärmer. Im Sommer sind es manchmal vierzig Grad. Nachbarin: Vierzig! Das ist zu warm für mich. Ravi: Entschuldigung, darf ich etwas fragen? Gibt es hier einen Supermarkt? Nachbarin: Ja, es gibt einen in der Straße, gegenüber der Post. Ravi: Und ist er am Sonntag offen? Nachbarin: Nein, am Sonntag sind die Geschäfte zu. Das ist in Deutschland so. Ravi: Gut zu wissen. Danke! Nachbarin: Gern. Hoffentlich bleibt das Wetter schön. Schönen Tag noch!

endlich is finally, fast is almost, jeden Tag is every day, offen and zu are open and closed, die Geschäfte are the shops, Gut zu wissen is good to know. All free.

The piece of real information in there is worth more than the vocabulary: shops in Germany are closed on Sundays. That is the kind of thing a language course rarely tells you and which reshapes a week.

Read it aloud twice, both parts. Then cover Ravi’s lines and have the conversation about your actual weather, your actual preference, and something you actually need to find.

Into German today. On Tag 30 you will translate these back the other way - which is in the next block.

The first minute of a conversation, run five times. Stand up.

Du bist eine Nachbarin in Hamburg. Ich bin Anfänger (Tag 28, A1).
Heute übe ich Smalltalk, das Wetter und es gibt.
Wir treffen uns FÜNF MAL kurz - jedes Mal ein neuer Tag mit anderem
Wetter. Fang jedes Mal mit dem Wetter an und benutze "nicht wahr?".
Dann frag mich eine normale Smalltalk-Frage: Wie geht es Ihnen? Was
machen Sie heute? Mögen Sie den Sommer? Waren Sie am Wochenende weg?
Ich frage dich jedes Mal, ob es hier etwas gibt - einen Supermarkt,
eine Apotheke, ein Café, einen Bahnhof, eine Post. Antworte mit "Es gibt"
und einer kurzen Wegbeschreibung.
Sprich langsam, maximal neun Wörter pro Satz. Fang jetzt an.

Diktat. Ten-second loop on the shadowing audio. Write six German words by hand without pausing, then correct in a second colour.

Satz des Tages. Write out by hand, from memory, a weather conversation of eight lines - four from you and four from a neighbour - about today’s actual weather. Then write three es gibt questions for three things you genuinely need to find where you live.

Fehlerliste. Week-five page. Every item the drills marked wrong today, in German only.

Genus-Farben. Nine new nouns. Blue: der Frühling, der Sommer, der Herbst, der Winter, der Grad. Red: die Sonne, die Jahreszeit, die Apotheke. Green: das Geschäft.

Then add the fifth and last reliable gender rule to the top of the page: JAHRESZEITEN UND MONATE SIND MASKULIN. With the four you already have - days and times of day masculine, -in feminine, -ung feminine, compounds take the last part - that is five rules covering a large share of the nouns you will meet.

Goldlist. Not today. Goldlist 9 went in yesterday. Goldlist 5 from Tag 15 comes up for distillation tomorrow.

Twenty-eight days. Everything, in one table.

WocheTageThemaBausteine
101-07Laute, Begrüßung, sein und haben, der/die/das, Präsens, Fragen72
208-14Akkusativ, Dativ, Pronomen, bestellen, trennbare Verben72
315-21Modalverben, Uhrzeit, Perfekt mit haben und sein, Possessivartikel72
422-28Wechselpräpositionen, Imperativ, gern und lieber, weil und dass, Wetter72
Gesamt288
  1. Sich vorstellen und ein Gespräch beginnen - greet correctly for the time of day, say who you are, where you are from, what you do, how long you have been here, and ask the same back.

  2. Etwas bestellen und bezahlen - a full café or restaurant visit from sitting down to leaving, including zusammen oder getrennt and the change.

  3. Nach dem Weg fragen und ihn verstehen - ask, and follow a four-step answer, and repeat each step back to confirm it.

  4. Einen Termin machen - name a day, name a time, understand a time said back at you in both the halb and the 24-hour form, and confirm it.

  5. Über die Vergangenheit sprechen - what you did yesterday and at the weekend, with both helper verbs.

  6. Über deine Familie und deine Wohnung sprechen - who they are, where they are, how many rooms, what is where.

  7. Sagen, was du willst, musst, darfst und kannst - all six modal verbs, and the difference between not having to and not being allowed to.

  8. Eine Meinung sagen und begründen - what you think, what you prefer, and why, with weil and dass.

  9. Smalltalk machen - the weather, the seasons, and whether there is a supermarket nearby.

Four questions. Answer them honestly, because they decide what the next block should contain.

Frage
1. Can you run a ten-minute conversation about yourself without reaching for English?ja / nein
2. Can you ask fifteen different questions in ten minutes?ja / nein
3. Do the dative articles come out right without thinking?ja / nein
4. Can you tell a story about yesterday with the right helper verb each time?ja / nein

Vier Wochen sind fertig. Zurück zur Übersicht - und weiter mit Tag 29, wo die fünfte Woche mit dem Präteritum anfängt.