Skip to content

Tag 08 - Der Akkusativ

Tag 08 von 60 - das deutsche R, der Akkusativ, den und einen, die Verben mit Objekt. Zwei Stunden.


Week one worked because every sentence had a fixed shape you could swallow whole. Today that stops, and it stops with the single most important piece of grammar in beginner German: the case system. You have already been using it without knowing - on Tag 04 you learned Einen Kaffee, bitte and nobody explained why it was not Ein Kaffee. Today you find out.

The idea is simple even though the endings are not. German marks what a noun is doing in the sentence by changing the word in front of it. The thing doing the action keeps its dictionary article - that is the Nominativ, everything you have had so far. The thing having the action done to it switches to the Akkusativ.

And here is the piece of luck that makes today survivable: only the masculine changes. Feminine, neuter and plural look exactly the same as they did yesterday. One gender out of three, one ending to learn. That is the whole of the accusative.

Yesterday’s questions, cold, before any new grammar lands on top of them.

The last genuinely new sound, and the one that most obviously marks a foreigner. English r is made with the tongue curled back in the middle of the mouth. German r is made at the back of the throat, in the same place as the ach-Laut from Tag 03 - and in many positions it is barely a consonant at all.

Three positions, three behaviours:

PositionWas passiertBeispiel
am Wortanfangback-of-throat r, clearly audiblerot, Reise, richtig
nach einem Konsonantensame back r, lighterdrei, brauchen, groß
am Wortende oder vor einem Konsonantenbecomes a vowel, like a short uhder, Bier, Uhr, arbeiten

That third row is the one that transforms your accent. der does not end in an r sound at all - a German says something close to dea. Bier is Bia. Uhr is Ooa. If you pronounce the r in der Zug the way you would in English, it is the single loudest thing in the sentence.

Say each pair aloud. Left column has a real r, right column has the vowel-r:

Echtes RVokal-R
rotder
richtigBier
ReiseUhr
dreiTür
brauchtWasser
grünVater

Every German sentence with an object has two nouns doing two different jobs:

RolleFrageFall
wer oder was tut esWer?Nominativ
wen oder was trifft esWen? oder Was?Akkusativ

Take Ich trinke den Kaffee. Who drinks? Ich - nominative. What is drunk? den Kaffee - accusative. The coffee is not doing anything; it is being done to.

This is the whole of today’s grammar in six cells:

GenusNominativAkkusativ
maskulinder Kaffeeden Kaffee
feminindie Milchdie Milch
neutraldas Wasserdas Wasser

And the same for the indefinite article:

GenusNominativAkkusativ
maskulinein Kaffeeeinen Kaffee
feminineine Frageeine Frage
neutralein Problemein Problem

Two things you already know suddenly make sense:

  • Einen Kaffee, bitte from Tag 04. You were ordering a coffee - the coffee is the thing being ordered, so it is accusative, so masculine ein grew an -en. You have been using the accusative correctly since day four.
  • Ich mache einen MBA from Tag 05. Same reason. der MBA is masculine, and you are doing it, so einen.

Not every verb takes an object. Ich wohne is complete; Ich trinke is not - you have to say what. Today’s verbs all need one:

VerbBeispiel
trinkenIch trinke einen Kaffee.
essenIch esse ein Brot.
nehmenIch nehme den Zug.
brauchenIch brauche die Adresse.
kaufenIch kaufe das Buch.
suchenIch suche den Bahnhof.

Note essen and nehmen change their vowel in the du and er/sie/es forms - du isst, er isst, du nimmst, er nimmt. You only need the ich and Sie forms today.

Read each one aloud twice before the drill.

DeutschEnglishWann
Ich trinke einen KaffeeI am drinking a coffeemasculine, so einen
Ich nehme den ZugI am taking the trainder Zug becomes den Zug
Ich suche den BahnhofI am looking for the stationthe question you will actually ask
Ich brauche die AdresseI need the addressfeminine, nothing changes
Ich kaufe das BuchI am buying the bookneuter, nothing changes
Ich esse ein BrotI am eating a bread rollneuter, so plain ein
Haben Sie einen Moment?do you have a momentder Moment, so einen
Ich habe keinen HungerI am not hungryliterally: I have no hunger
Ich möchte einen TeeI would like a teamöchte is the polite want
Nehmen Sie die Straßetake the streetdirections, feminine
Ich verstehe das Wort nichtI do not understand the wordneuter object, nicht at the end
Können Sie das wiederholen?can you repeat thatthe other rescue sentence

Replace the word in brackets and say the whole new sentence. Watch the article - it may have to change.

Turn the nominative into the accusative. You are given the dictionary form; put it after Ich suche.

Answer in a full sentence, as yourself.

Three sources, as the schedule says: yesterday, two days back, and five days back. Tag 03 is the fragile one today, and it is the one today’s grammar sits directly on top of - if the genders have gone, the accusative cannot work.

A café, and this time Ravi is ordering rather than introducing himself. Every object in the dialogue is in the accusative - find all seven before you read it aloud.

Kellner: Guten Tag! Was möchten Sie? Ravi: Guten Tag. Ich möchte einen Kaffee, bitte. Kellner: Einen Kaffee. Möchten Sie auch ein Brot? Ravi: Nein danke, ich habe keinen Hunger. Was kostet der Kaffee? Kellner: Drei Euro. Ravi: Gut. Entschuldigung, ich suche den Bahnhof. Haben Sie einen Moment? Kellner: Ja, genau. Nehmen Sie die Straße und dann den Bus. Ravi: Wie bitte? Ich verstehe das Wort nicht. Können Sie das wiederholen? Kellner: Nehmen Sie die Straße, dann den Bus. Ravi: Danke! Ich nehme den Bus.

The seven objects: einen Kaffee, einen Kaffee, ein Brot, keinen Hunger, den Bahnhof, einen Moment, die Straße, den Bus, das Wort, den Bus. More than seven, in fact - which is the point. Almost every sentence that does anything has one.

Read it aloud twice, both parts, with the melody from Tag 07: rising on Möchten Sie auch ein Brot?, falling everywhere else. Then cover Ravi’s lines and produce them from the waiter’s cues.

Und dann Hören, fünf Minuten. Same clip, different job, and this is the half that self-study usually skips.

Play the whole forty seconds three times, without stopping and without reading anything on this page.

  1. First pass - words. Write down every German word you catch. Three is a result. Nine is a good day.
  2. Second pass - one sentence. Write down one complete sentence, even if half of it is a guess.
  3. Third pass - check yourself. Listen again and correct what you wrote.

There is no answer key, deliberately. No transcript is printed here and you are not meant to go hunting for one. A transcript would spare you the exact thing being trained: holding unfamiliar German in your head long enough to make sense of it. The clip never changes, so the only thing that can improve between today and the last day is you.

Into German today. On Tag 10 you will translate these back the other way, so do them properly now, out loud, before you type.

A café roleplay, which is the situation today’s grammar was built for. Stand up.

Du bist Kellner oder Kellnerin in einem Café in Hamburg. Ich bin Anfänger
(Tag 8, A1). Heute übe ich den Akkusativ.
Sprich langsam, maximal sechs Wörter pro Satz, und nur mit diesen Wörtern:
Guten Tag, Was möchten Sie, Möchten Sie auch, Ja genau, Nein danke,
Das kostet, Euro, Entschuldigung, Nehmen Sie, die Straße, der Bus,
Kaffee, Tee, Wasser, Milch, Brot, Zeit, Hunger, Moment, Bahnhof.
Frag mich mindestens fünfmal, was ich möchte oder was ich nehme, damit ich
den Akkusativ üben muss. Wenn ich "ein Kaffee" statt "einen Kaffee" sage,
wiederhole meinen Satz einfach richtig, ohne Erklärung, und mach weiter.
Korrigiere nichts anderes.
Fang jetzt an und begrüße mich.

Diktat. Set a ten-second loop on the shadowing audio and let it run. Write down any six German words by hand without pausing, then check and correct them in a second colour. Today, mark every r you wrote and decide whether it is a real r or a vowel-r.

Satz des Tages. Write out by hand, from memory, a six-line café order: greet, order a coffee, decline the bread because you are not hungry, ask what it costs, ask for the station, and thank them. Then check it against section 6 and mark every difference.

Die Akkusativ-Tabelle. Copy the six-cell table from section 3 by hand, twice, with the masculine row in a different colour from the other two. You are drawing attention to the only part that moves. Keep this page - it gets a dative column added to it on Tag 11.

Fehlerliste. The week-two page you started on Tag 06. Every item the drills marked wrong today, written correctly, in German only. Any wrong article gets written twice, not once.

Genus-Farben. Six new nouns today: der Bus, der Moment, der Hunger, der Tee all blue; die Adresse red; das Brot, das Buch, das Wort green. Four masculines in one day is not an accident - they are there because masculines are the only ones the accusative touches.

Goldlist. Not today. Goldlist 2 from Tag 06 is sitting in the notebook with a date on it - leave it completely alone until Tag 20. The next Goldlist page is Tag 09, tomorrow.


Weiter: Tag 09 - Akkusativpronomen - die Vokallänge, mich, dich, ihn, sie und uns, und der Rückweg ins Englische für die Sätze von Tag 07.