Skip to content

Tag 19 - Perfekt I

Tag 19 von 60 - das Perfekt mit haben, das Partizip II, über gestern sprechen. Zwei Stunden.


Eighteen days in the present tense. Today you get the past, and it unlocks the single most common question in any real conversation: Was haben Sie am Wochenende gemacht? Until you can answer that, every exchange stays stuck in what is happening right now.

German has two past tenses and at A1 you need only one. The Perfekt is what Germans actually say when speaking - Ich habe gearbeitet - and the other one, the Präteritum, belongs mostly to writing. So today’s rule covers almost all spoken past tense in German, which is an unusually good return for one page.

And the shape will be familiar. haben goes in position two; the other verb goes to the end in a special form. That is the bracket for the third time in six days - separable prefix on Tag 14, infinitive on Tag 15, and now the Partizip II.

Review day, so this is three weeks mixed, cold.

Und dann Hören, fünf Minuten. Same clip, different job, and this is the half that self-study usually skips.

Play the whole forty seconds three times, without stopping and without reading anything on this page.

  1. First pass - words. Write down every German word you catch. Three is a result. Nine is a good day.
  2. Second pass - one sentence. Write down one complete sentence, even if half of it is a guess.
  3. Third pass - check yourself. Listen again and correct what you wrote.

There is no answer key, deliberately. No transcript is printed here and you are not meant to go hunting for one. A transcript would spare you the exact thing being trained: holding unfamiliar German in your head long enough to make sense of it. The clip never changes, so the only thing that can improve between today and the last day is you.

haben in position two, Partizip II at the end.

Position 2…alles andere…Ende
Ich habegesterngearbeitet.
Ich habeDeutschgelernt.
Was haben Sieam Wochenendegemacht?
Haben Sieschonbezahlt?

haben is conjugated normally - ich habe, Sie haben, er hat - and carries all the grammar. The participle never changes form for the person.

The pattern is three pieces: ge- + Verbstamm + -t

InfinitivStammPartizip II
machenmachgemacht
lernenlerngelernt
kaufenkaufgekauft
fragenfraggefragt
kochenkochgekocht
zeigenzeiggezeigt
wohnenwohngewohnt
spielenspielgespielt

And one adjustment: if the stem ends in -t or -d, an extra e goes in so the word is sayable.

InfinitivPartizip II
arbeitengearbeitet
wartengewartet

Three groups of verbs drop the ge- altogether. They are worth learning as groups rather than one by one.

1. Verben auf -ieren

InfinitivPartizip II
studierenstudiert
probierenprobiert
telefonierentelefoniert

2. Verben mit untrennbarem Präfix - be-, ver-, er-, ent-

InfinitivPartizip II
bezahlenbezahlt
besuchenbesucht
erzählenerzählt

These prefixes never detach - you have never said Ich zahle be - and the same stuck-on-ness means there is no room for a ge- in front.

3. Trennbare Verben nehmen das ge- in die Mitte

InfinitivPartizip II
einkaufeneingekauft
aufhörenaufgehört
abholenabgeholt
anrufenangerufen

The prefix goes first, then ge-, then the stem. Ich habe eingekauft. Note angerufen is irregular - it is on the list because you have used it since Tag 09, not because it fits today’s pattern.

DeutschEnglish
gesternyesterday
vorgesternthe day before yesterday
letzte Wochelast week
am Wochenendeat the weekend
heute Morgenthis morning
schonalready
noch nichtnot yet
DeutschEnglishWann
Was haben Sie gemacht?what did you dothe question of the day
Ich habe gearbeitetI workedstem ends in t, so -et
Ich habe Deutsch gelerntI learned German
Ich habe eingekauftI did the shoppingge- in the middle
Ich habe gekochtI cooked
Ich habe telefoniertI made a phone call-ieren, no ge-
Ich habe schon bezahltI have already paidinseparable, no ge-
Haben Sie schon gegessen?have you eaten yetirregular, learn as a block
Ich habe noch nicht gegessenI have not eaten yet
Gestern habe ich gearbeitetyesterday I workedtime first, haben second
Am Wochenende habe ich gelerntat the weekend I studied
Wie war Ihr Wochenende?how was your weekendwar is the past of ist

Give the Partizip II only. Watch for the three families with no ge-.

Turn the present into the past.

Yesterday, two days back, five days back, twelve days back. Tag 07 is the twelve-day-old one - the questions, which you have been using every day since.

Monday morning, which in German is almost entirely past tense.

Anna: Guten Morgen, Ravi! Wie war Ihr Wochenende? Ravi: Guten Morgen! Es war gut, danke. Und Ihres? Anna: Auch gut. Was haben Sie gemacht? Ravi: Am Samstag habe ich Deutsch gelernt. Drei Stunden! Anna: Drei Stunden! Und am Sonntag? Ravi: Am Sonntag habe ich eingekauft und gekocht. Anna: Sie können kochen? Was haben Sie gekocht? Ravi: Indisch. Ich habe auch meine Familie angerufen. Anna: Schön. Haben Sie schon gefrühstückt? Ravi: Nein, ich habe noch nicht gegessen. Ich habe keine Zeit gehabt. Anna: Dann müssen Sie jetzt etwas essen. Der Kurs fängt um neun an. Ravi: Sie haben recht. Ich habe Hunger!

Ihres is yours, indisch is Indian, gefrühstückt is the participle of frühstücken, and Sie haben recht is you are right. Ich habe keine Zeit gehabt is worth noticing - haben can be its own participle, gehabt, and it is regular.

Read it aloud twice, both parts. Then cover Ravi’s lines and produce them from Anna’s cues.

Into German today. On Tag 21 you will translate these back the other way.

A Monday-morning conversation, which is the one you will have most often. Stand up.

Du bist eine Kollegin in Hamburg. Es ist Montagmorgen. Ich bin Anfänger
(Tag 19, A1). Heute übe ich das Perfekt mit haben.
Frag mich nach dem Wochenende und bohre nach: Wie war Ihr Wochenende?
Was haben Sie gemacht? Und am Sonntag? Was haben Sie gekocht? Haben Sie
schon gefrühstückt? Haben Sie Deutsch gelernt?
Erzähle auch kurz von deinem Wochenende, aber benutze nur Verben mit
haben - gearbeitet, gelernt, gekocht, eingekauft, telefoniert, besucht,
bezahlt.
Sprich langsam, maximal acht Wörter pro Satz. Wenn ich das Partizip nicht
ans Satzende stelle, wiederhole meinen Satz einfach richtig, ohne
Erklärung. Fang jetzt an.

Diktat. Ten-second loop on the shadowing audio. Write six German words by hand without pausing, then correct in a second colour.

Satz des Tages. Write out by hand, from memory, your actual weekend in six past-tense sentences. Real ones - what you really did. Six lines, every one with habe in position two and a participle at the end. Then read them aloud. This is the answer you will give on Monday and writing the real version now means you will not have to invent it under pressure later.

Die Partizip-Tabelle. Three columns by hand, five verbs in each:

ge- + tkein ge-ge- in der Mitte
gemachtbezahlteingekauft
gelerntbesuchtabgeholt
gearbeitetstudiertaufgehört
gekochttelefoniertangerufen
gewarteterzähltmitgekommen

Then write the stress test underneath in capitals: BETONUNG VORNE = GE- IN DIE MITTE. BETONUNG HINTEN = KEIN GE-.

Fehlerliste. Week-four page, started yesterday. Every item the drills marked wrong today, in German only. Every participle in the wrong position gets written twice.

Genus-Farben. Three new nouns: green das Wochenende; red die Stunde, die Woche. Note that das Wochenende is neuter even though die Woche is feminine - compound nouns take the gender of their last part, and das Ende is neuter. That is a third reliable gender rule and the most useful of the three: add it to the top of the page.

Goldlist. Not today. Goldlist 2 from Tag 06 comes up for distillation tomorrow, so leave tonight free for it.


Weiter: Tag 20 - Perfekt II - die Verben mit sein, die unregelmäßigen Partizipien, und die zweite Goldlist-Destillation.