Tag 43 - Wohnungssuche und Mietvertrag
Tag 43 von 60 - das Exposé, die Nebenkosten, die Kaution, die Besichtigung. Zwei Stunden.
Week seven. The grammar is finished and this week is about getting things done in writing and on the phone, starting with the hardest administrative thing anyone does in Germany: finding somewhere to live.
The language problem here is specific. A German flat advert is written in abbreviations, and the words that decide whether you can afford the flat - Kaltmiete, Nebenkosten, Kaution - are not the words an English advert would use. People sign contracts they have misread. Today is the vocabulary that stops that.
Tag 22 gave you the rooms of a flat. Today is the flat as a transaction.
1. Aufwärmen - zehn Stück aus Tag 42
Section titled “1. Aufwärmen - zehn Stück aus Tag 42”The four cases, cold.
2. Shadowing - zehn Minuten
Section titled “2. Shadowing - zehn Minuten”Und dann Hören, fünf Minuten. Same clip, different job, and this is the half that self-study usually skips.
Play the whole forty seconds three times, without stopping and without reading anything on this page.
- First pass - words. Write down every German word you catch. Three is a result. Nine is a good day.
- Second pass - one sentence. Write down one complete sentence, even if half of it is a guess.
- Third pass - check yourself. Listen again and correct what you wrote.
There is no answer key, deliberately. No transcript is printed here and you are not meant to go hunting for one. A transcript would spare you the exact thing being trained: holding unfamiliar German in your head long enough to make sense of it. The clip never changes, so the only thing that can improve between today and the last day is you.
3. Neue Bausteine - zwölf Stück
Section titled “3. Neue Bausteine - zwölf Stück”Die Miete - drei Wörter, die man nicht verwechseln darf
Section titled “Die Miete - drei Wörter, die man nicht verwechseln darf”This is the single most important distinction on the page:
| Deutsch | English | Was es bedeutet |
|---|---|---|
| die Kaltmiete | base rent | the rent alone, nothing included |
| die Nebenkosten | service charges | water, rubbish, stairwell, heating, caretaker |
| die Warmmiete | total rent | Kaltmiete plus Nebenkosten - what you actually pay |
An advert almost always shows the Kaltmiete in large type, because it is the smaller number. The figure that leaves your account each month is the Warmmiete, and the gap is routinely 150 to 300 euros.
The abbreviations you will see: KM for Kaltmiete, NK for Nebenkosten, WM for Warmmiete.
Electricity and internet are usually not in the Nebenkosten. You contract those yourself, separately.
Die Wohnung
Section titled “Die Wohnung”| Deutsch | English |
|---|---|
| die Anzeige | the advert |
| das Exposé | the listing document |
| die Besichtigung | the viewing |
| der Quadratmeter | square metre |
| die Kaution | the deposit |
| der Mietvertrag | the rental contract |
| der Vermieter / die Vermieterin | the landlord |
| der Mieter / die Mieterin | the tenant |
| der Makler | the estate agent |
| die Hausverwaltung | the property management |
Die Abkürzungen
Section titled “Die Abkürzungen”A German advert is half abbreviation. These eight cover most of them:
| Kurz | Lang | English |
|---|---|---|
| 2 ZKB | 2 Zimmer, Küche, Bad | 2 rooms, kitchen, bathroom |
| qm / m2 | Quadratmeter | square metres |
| KM / NK / WM | Kaltmiete / Nebenkosten / Warmmiete | base / service / total rent |
| EBK | Einbauküche | fitted kitchen |
| OG / EG / DG | Obergeschoss / Erdgeschoss / Dachgeschoss | upper floor / ground floor / attic |
| ZH | Zentralheizung | central heating |
| NR | Nichtraucher | non-smoker |
| provisionsfrei | ohne Maklerprovision | no agent’s fee |
Was der Vermieter sehen will
Section titled “Was der Vermieter sehen will”German landlords ask for a document pack, and it is the same pack everywhere:
| Deutsch | English |
|---|---|
| die Schufa-Auskunft | credit report |
| die Gehaltsabrechnungen | payslips, usually the last three |
| der Arbeitsvertrag | employment contract |
| die Mietschuldenfreiheitsbescheinigung | confirmation of no rent arrears |
| die Kopie vom Ausweis | copy of the ID |
| die Selbstauskunft | the tenant self-disclosure form |
die Mietschuldenfreiheitsbescheinigung is thirty-four letters long and means confirmation-of-freedom-from-rent-debts. Read it right to left, the way you learned on Tag 40, and it stops being frightening: a Bescheinigung, about Freiheit, from Mietschulden.
Have the whole pack as one PDF before the first viewing. The flat goes to whoever hands it over first, and that is not an exaggeration.
Die zwölf Bausteine
Section titled “Die zwölf Bausteine”| Deutsch | English | Wann |
|---|---|---|
| Ich suche eine Wohnung | I am looking for a flat | |
| Ist die Wohnung noch frei? | is the flat still available | the first question, always |
| Ich interessiere mich für die Wohnung | I am interested in the flat | reflexive, Tag 34 |
| Kann ich die Wohnung besichtigen? | can I view the flat | |
| Wie hoch sind die Nebenkosten? | how high are the service charges | |
| Wie hoch ist die Kaution? | how high is the deposit | |
| Ist die Küche vorhanden? | is there a kitchen | vorhanden, present / included |
| Ab wann ist die Wohnung frei? | from when is the flat available | |
| Wie lange ist die Kündigungsfrist? | how long is the notice period | usually three months |
| Ich habe alle Unterlagen dabei | I have all the documents with me | the sentence that wins flats |
| Wann bekomme ich Bescheid? | when will I hear back | der Bescheid, the decision |
| Ich würde den Vertrag gern unterschreiben | I would be glad to sign the contract |
4. Drills
Section titled “4. Drills”Substitutionsdrill
Section titled “Substitutionsdrill”Rechendrill - Kalt plus Neben ist Warm
Section titled “Rechendrill - Kalt plus Neben ist Warm”Say the sum out loud, in German, as a full sentence: Die Warmmiete ist ... Euro. Numbers in German, not in English.
Abkürzungsdrill
Section titled “Abkürzungsdrill”Read the abbreviation out in full German, then say what it means.
Antwortdrill - bei der Besichtigung
Section titled “Antwortdrill - bei der Besichtigung”Übersetzungsdrill
Section titled “Übersetzungsdrill”Note in der Nähe der Uni in there - a Genitiv, one day old, already useful.
5. Wiederholung
Section titled “5. Wiederholung”Yesterday, two days back, five days back, twelve days back, thirty days back. Tag 13 is the thirty-day-old one - the dative pronouns.
6. Text und Hören
Section titled “6. Text und Hören”Not a dialogue today. An advert, written the way they are actually written, and reading one correctly is the skill.
Schöne 2-Zimmer-Wohnung in Hamburg-Eimsbüttel, 58 qm, 2. OG
Helle, ruhige Altbauwohnung mit Balkon in beliebter Lage. Die Wohnung liegt im zweiten Obergeschoss ohne Aufzug. Zwei Zimmer, Küche, Bad mit Fenster und Wanne. Holzdielen, hohe Decken, Zentralheizung. Keine EBK vorhanden.
KM 940 EUR · NK 180 EUR · WM 1.120 EUR · Kaution 2.820 EUR (3 Monatsmieten kalt)
Bezugsfrei ab 01.01. Unbefristeter Mietvertrag, Kündigungsfrist 3 Monate. Provisionsfrei - direkt von der Hausverwaltung.
Bitte bringen Sie zur Besichtigung mit: Schufa-Auskunft, die letzten drei Gehaltsabrechnungen, Kopie vom Ausweis und die ausgefüllte Selbstauskunft. Ohne vollständige Unterlagen ist leider keine Berücksichtigung möglich.
Besichtigung: Samstag, 14.00 Uhr. Keine Haustiere. Nichtraucherwohnung.
Now answer these out loud, in German, before reading on: Wie viele Schlafzimmer hat die Wohnung? Was kostet sie wirklich pro Monat? Wie viel Geld braucht man am Anfang? Was fehlt in der Küche? Was muss man mitbringen?
The answers, because three of them are traps:
- One bedroom. Two Zimmer means a living room and a bedroom.
- 1,120 euros a month - the Warmmiete, not the 940 in bold.
- 3,940 euros up front - the 2,820 deposit plus the first month’s 1,120. Plus a kitchen.
- The kitchen does not exist.
Keine EBK vorhanden. - Four documents, and
ohne vollständige Unterlagen ... keine Berücksichtigungmeans they will not even look at you without them.
New words: hell bright, ruhig quiet, beliebt popular, die Lage the location, der Aufzug the lift, die Wanne the bathtub, die Holzdielen floorboards, die Decke the ceiling, bezugsfrei available to move into, unbefristet open-ended, vollständig complete, die Berücksichtigung consideration, das Haustier the pet.
Read the whole advert aloud twice. Reading German adverts out loud is unglamorous and it is the thing that makes the next one take two minutes instead of twenty.
7. Bidirektional
Section titled “7. Bidirektional”Into German today. On Tag 45 you will translate these back the other way.
8. Sprechen - zehn Minuten
Section titled “8. Sprechen - zehn Minuten”A viewing, with twelve other people in the room. Stand up.
Du bist Mitarbeiter einer Hamburger Hausverwaltung. Ich bin Lernender(Tag 43) und komme zur Wohnungsbesichtigung. Es sind noch zwölf andereLeute da, also hast du wenig Zeit und bist freundlich aber knapp.
Beschreibe mir die Wohnung in drei Sätzen. Dann lass MICH fragen -antworte kurz und warte auf die nächste Frage.
Ich muss nach Nebenkosten, Kaution, Küche, Datum und Kündigungsfristfragen. Wenn ich eine davon vergesse, frag am Ende: "Haben Sie keineFragen zu den Kosten?" - und lass mich nachholen.
Am Ende sagst du "Wir melden uns." Dann muss ich noch zwei Dinge sagen:dass ich alle Unterlagen dabei habe, und wann ich Bescheid bekomme.
Maximal zehn Wörter pro Satz. Fang an.9. Auf Papier - Goldlist
Section titled “9. Auf Papier - Goldlist”Diktat. Ten-second loop on the shadowing audio. Six German words by hand without pausing, then correct in a second colour.
Die Anzeigen-Übung. The highest-value thing on this page. Find one real German flat advert - any Hamburg listing site - and copy it out by hand. All of it, abbreviations included. Then underneath, write four lines: the Warmmiete, the Kaution, the number of bedrooms, and whether there is a kitchen.
Do that once a day this week and German adverts stop being able to surprise you.
Satz des Tages. Write by hand, from memory, the five questions you must ask at a viewing: service charges, deposit, kitchen, available from when, notice period. Then the two closing sentences from the box above. Seven lines.
Fehlerliste. Week-seven page - start a fresh one today. Every item the drills marked wrong.
Genus-Farben. Fourteen new nouns. Blue: der Quadratmeter, der Mietvertrag, der Vermieter, der Mieter, der Makler, der Aufzug, der Bescheid. Red: die Anzeige, die Besichtigung, die Kaution, die Kaltmiete, die Warmmiete, die Nebenkosten, die Hausverwaltung, die Kündigungsfrist, die Lage. Green: das Exposé, das Haustier.
Goldlist 5 - zweite Destillation.
Day 43, minus 28 is day 15, so this is the second and final distillation of Goldlist page 5 - written on Tag 15 and distilled once on Tag 29.
-
Find Goldlist 5 and its first distillation. Around 17 items.
-
Read them aloud, covering the English. Three seconds each, no longer.
-
Cross out everything you knew - cleanly, without hesitation, right article.
-
Copy the survivors onto a fresh page under Goldlist 5 - zweite Destillation. Expect eight to twelve.
-
Page 5 is now closed. What survived two distillations goes on the Problemliste at the back - those items need to be built into sentences you actually say, not memorised again as words.
-
Nothing to diarise.
Weiter: Tag 44 - Telefonieren und buchstabieren - der Anruf, das deutsche Buchstabieralphabet, und wie man am Telefon nicht die Nerven verliert.