Skip to content

Tag 36 - Wiederholungstag

Tag 36 von 60 - kein neuer Stoff. Alle Endungen auf einer Seite. Zwei Stunden.


Nothing new today. Sixth review day, and the last one that will be about grammar - because from tomorrow the course stops adding structures and starts adding the vocabulary you need to deal with institutions.

So this page is the grammar inventory. Everything you own, in tables, on one page, with nothing explained. If you can rebuild these five tables from memory you have the structural half of German at A1 and A2, and the remaining twenty-four days are words.

The du form, cold.

Und dann Hören, fünf Minuten. Same clip, different job, and this is the half that self-study usually skips.

Play the whole forty seconds three times, without stopping and without reading anything on this page.

  1. First pass - words. Write down every German word you catch. Three is a result. Nine is a good day.
  2. Second pass - one sentence. Write down one complete sentence, even if half of it is a guess.
  3. Third pass - check yourself. Listen again and correct what you wrote.

There is no answer key, deliberately. No transcript is printed here and you are not meant to go hunting for one. A transcript would spare you the exact thing being trained: holding unfamiliar German in your head long enough to make sense of it. The clip never changes, so the only thing that can improve between today and the last day is you.

Five weeks. Everything structural, in five tables.

maskulinfemininneutralPlural
Nominativder / eindie / einedas / eindie
Akkusativden / einendie / einedas / eindie
Dativdem / einemder / einerdem / einemden + n

kein, mein, dein, sein, ihr, unser and Ihr all take the ein endings exactly.

NominativAkkusativDativReflexiv
ichichmichmirmich
dududichdirdich
ererihnihmsich
siesiesieihrsich
esesesihmsich
wirwirunsunsuns
SieSieSieIhnensich
nach dernach einohne Artikel
mask Nom-e-er-er
mask Akk-en-en-en
mask Dat-en-en-em
fem Nom/Akk-e-e-e
fem Dat-en-en-er
neut Nom/Akk-e-es-es
neut Dat-en-en-em
Plural Nom/Akk-en-en-e
Plural Dat-en-en-en

One sentence for the whole column set: whoever can carry the gender, does. Strong article, weak adjective. No article, strong adjective.

ichduer/sie/esSie/wir
regelmäßig-e-st-t-en
seinbinbististsind
habenhabehasthathaben
könnenkannkannstkannkönnen
müssenmussmusstmussmüssen
wollenwillwillstwillwollen
dürfendarfdarfstdarfdürfen
sollensollsollstsollsollen
möchtenmöchtemöchtestmöchtemöchten
ZeitFormFür welche Verben
PräsensStamm + Endungalle
Perfekthaben/sein + Partizip IIalle außer den folgenden
Präteritumwar, hatte, konnte, musste, wollte, durfte, solltenur sein, haben, Modalverben

And the word order, which is not a table but one line: conjugated verb second, everything else in the middle, the other verb part last - except in a weil, dass or ob clause, where everything goes to the end.

Each phrase needs a decision from a different table. Say the whole thing aloud first.

Pick the right past tense for each verb.

5. Wiederholung - fünf Wochen in 60 Sekunden

Section titled “5. Wiederholung - fünf Wochen in 60 Sekunden”

Five timed rounds. Nothing starts until you press the button.

Five weeks in one conversation, and the first one that runs entirely in du after the first three lines.

Thomas: Hallo Ravi! Wie geht es dir? Ravi: Danke, gut. Und dir? Wie war dein Wochenende? Thomas: Anstrengend. Ich musste arbeiten. Und du? Ravi: Ich war zu Hause. Ich hatte einen langen Kurs am Samstag. Thomas: Am Samstag? Das ist hart. Wie lange war der Kurs? Ravi: Von neun bis fünf. Danach bin ich mit dem Bus nach Hause gefahren. Thomas: Und am Sonntag? Ravi: Am Sonntag habe ich gekocht und ein gutes Buch gelesen. Ich fühle mich jetzt besser. Thomas: Das klingt gut. Hast du am Freitag Zeit? Wir treffen uns im kleinen Café am Hafen. Ravi: Am Freitag kann ich. Wann treffen wir uns? Thomas: Um halb sieben. Kommt mein neuer Kollege auch mit - kennst du ihn? Ravi: Nein. Wie sieht er aus? Thomas: Groß, dunkle Haare, sehr freundlich. Er interessiert sich auch für Technik. Ravi: Dann freue ich mich. Ruf mich an, wenn sich etwas ändert. Thomas: Mache ich. Bis Freitag!

anstrengend is tiring, hart is hard, sich ändern is to change. All free.

Read it aloud twice, both parts. Then do the thirty-six-day test: cover both sides and reconstruct the whole conversation from the situation alone - two colleagues on a Monday arranging to meet on Friday. Ninety seconds, no stopping.

Into German today - a five-week consolidation set. On Tag 38 you will translate these back the other way.

Two blocks of ten with a break.

Erster Block - fünf Wochen, alles gemischt.

Du bist Thomas, ein Kollege in meinem Alter in Hamburg. Wir duzen uns.
Ich bin Lernender (Tag 36).
Zehn Minuten normales Gespräch, komplett in der du-Form. Deck dabei ab:
mein Wochenende (Vergangenheit), meine Wohnung (Adjektive), meine
Familie, einen Termin für diese Woche, wie ich mich fühle, und wofür ich
mich interessiere.
Sprich langsam, maximal zehn Wörter pro Satz. Korrigiere nur, indem du
meinen Satz richtig wiederholst, und nur bei Fehlern im Fall, beim
Hilfsverb, oder wenn ich aus Gewohnheit "Sie" sage. Fang jetzt an.

Zweiter Block - du bist dran.

Jetzt tauschen wir. Du bist neu in Hamburg, ich wohne hier. Wir duzen
uns. Stelle mir keine Fragen - ich frage dich. Antworte kurz, maximal
zehn Wörter pro Satz.
Du kommst aus Polen, bist seit drei Wochen hier, wohnst in einer kleinen
Wohnung mit zwei Zimmern, hast einen Bruder, arbeitest von zehn bis
sechs, fährst mit der Bahn, warst am Wochenende in Berlin, interessierst
dich für Musik, und du hattest letzte Woche eine Prüfung.
Wenn ich zwei Minuten lang nichts frage, sage nur: Hast du eine Frage?

Diktat. Ten-second loop on the shadowing audio. Write eight German words by hand without pausing, then correct in a second colour.

Satz des Tages. Write by hand, from memory, the twenty-sentence self-portrait from section 4 - in the du form where the question would be informal. Twenty lines.

Alle fünf Tabellen, aus dem Kopf. The real work of today. Draw all five from section 3 by hand without looking: the articles, the pronouns, the adjective endings, the verb forms, and the tenses. Then check each against the page in a second colour.

Doing this from memory is the whole exercise. If one of the five will not come, that is the table to put on the wall for the next week - and it will almost certainly be the adjective endings, which are four days old.

Fehlerliste. Week-six page, started yesterday. Everything from today.

Genus-Farben. No new nouns. One full pass down the list: each noun with all three articles, its pronoun, and now one adjective in front of it in the nominative: der gute Bus, die kleine Bahn, das neue Auto.

Goldlist 12.

Twelfth page - today is divisible by three.

  1. Fresh double page, today’s date, plus Goldlist and the number 12.

  2. Twenty-five items by hand, German left, English right, numbered. Take them from Tag 34 and Tag 35 - the reflexive verbs with their pronouns, and the du forms. Write reflexive verbs with sich and du forms with du, because the pronoun is the part worth learning.

  3. Say each item aloud once as you write it. Once.

  4. Read the whole list aloud once when finished, slowly, without stopping.

  5. Close the notebook and walk away.

  6. Write in your calendar, 14 days from today: Goldlist 12 distillieren - that is Tag 50.


Weiter: Tag 37 - Beim Arzt - der Körper, die Schmerzen, und das Gespräch, das man im ersten Jahr garantiert führt.