Skip to content

Tag 18 - Wiederholungstag

Tag 18 von 60 - kein neuer Stoff. Alle Satzmuster auf einer Seite, zwanzig Minuten sprechen. Zwei Stunden.


Nothing new today. Third review day, and the thing worth consolidating has changed again. Tag 06 was about coverage, Tag 12 was about the collision between cases. Today it is about sentence shapes.

You now own four different word orders - plain statement, question, separable-verb bracket, modal-verb bracket - and the mistakes you make are increasingly not about words at all. They are about putting the right words in the wrong slots. So section 3 lays every pattern you have side by side, and section 4 drills one idea through all four shapes.

The clock, cold.

Und dann Hören, fünf Minuten. Same clip, different job, and this is the half that self-study usually skips.

Play the whole forty seconds three times, without stopping and without reading anything on this page.

  1. First pass - words. Write down every German word you catch. Three is a result. Nine is a good day.
  2. Second pass - one sentence. Write down one complete sentence, even if half of it is a guess.
  3. Third pass - check yourself. Listen again and correct what you wrote.

There is no answer key, deliberately. No transcript is printed here and you are not meant to go hunting for one. A transcript would spare you the exact thing being trained: holding unfamiliar German in your head long enough to make sense of it. The clip never changes, so the only thing that can improve between today and the last day is you.

Eighteen days. Here is everything, arranged by shape rather than by day.

MusterPosition 1Position 2MitteEnde
AussageIchwohnein Hamburg
Aussage, Zeit zuerstHeutearbeiteich
W-FrageWowohnenSie
Ja/Nein-FrageWohnenSiein Hamburg
Trennbares VerbIchsteheum sieben Uhrauf
ModalverbIchmussjetztgehen
Modal + trennbarIchmussum siebenaufstehen

Read the second column down. The conjugated verb is in position two in every single row except the yes-no question, where it is first. That is the one rule under all of German word order, and it has not changed since Tag 05.

Then read the last column. Whenever there is a second verb part - a prefix or an infinitive - it goes to the very end. Two verb parts, two ends of the sentence, everything else in the middle.

maskulinfemininneutral
Nominativder / eindie / einedas / ein
Akkusativden / einendie / einedas / ein
Dativdem / einemder / einerdem / einem
NominativAkkusativDativ
ichichmichmir
SieSieSieIhnen
ererihnihm
siesiesieihr
esesesihm
wirwirunsuns
könnenmüssenwollendürfensollenmöchten
ich / erkannmusswilldarfsollmöchte
Sie / wirkönnenmüssenwollendürfensollenmöchten

muss nicht = keine Pflicht. darf nicht = verboten.

AuslöserFall
SubjektNominativ
direktes ObjektAkkusativ
mit, bei, nach, von, zu, aus, seitDativ
helfen, danken, gehören, gefallen, schmecken, passenDativ

Four triggers, and that is the whole case system at A1.

The core drill of this review day. Same idea, run through every sentence shape you own.

Every answer about you, full sentence. Anything slow here goes on paper tonight.

5. Wiederholung - drei Wochen in 60 Sekunden

Section titled “5. Wiederholung - drei Wochen in 60 Sekunden”

Three timed rounds. Nothing starts until you press the button.

The longest dialogue of the course so far, built only from eighteen days of material, and the first one in which Ravi runs the whole exchange himself.

Anna: Hallo Ravi! Wie geht es Ihnen? Ravi: Danke, gut. Und Ihnen? Haben Sie einen Moment? Anna: Ja, natürlich. Was möchten Sie? Ravi: Ich will am Samstag nach Berlin fahren. Kommen Sie mit? Anna: Nach Berlin? Wann fährt der Zug? Ravi: Um halb neun. Also acht Uhr dreißig. Anna: Das ist früh! Muss ich um sieben aufstehen? Ravi: Ja, Sie müssen früh aufstehen. Soll ich Sie abholen? Anna: Gern. Ich wohne bei meiner Familie, in der Stadt. Ravi: Gut. Ich hole Sie um acht ab. Darf ich etwas fragen? Anna: Ja? Ravi: Wie sagt man “ticket” auf Deutsch? Anna: Die Fahrkarte. Wir müssen zwei Fahrkarten kaufen. Ravi: Dann kaufe ich die Fahrkarten am Freitag. Kann man am Bahnhof bezahlen? Anna: Ja, das kann man. Aber Sie dürfen nicht im Zug kaufen. Ravi: Verstehe. Ich rufe Sie am Freitag an. Bis Samstag! Anna: Bis Samstag, Ravi!

früh is early, die Fahrkarte is the ticket, meiner Familie is my family - possessives arrive on Tag 21, so take it as free vocabulary for now.

Read it aloud twice, both parts. Then cover Ravi’s lines and produce them; then cover Anna’s and produce hers. Her side has three questions and two warnings in it, which is harder.

The eight sentences you translated into German on Tag 16, coming back the other way. Do not look them up first.

Two blocks of ten with a break between them.

Erster Block - ein Plan.

Du bist Anna, eine Bekannte aus Hamburg. Ich bin Anfänger (Tag 18, A1).
Wir planen zehn Minuten lang einen Ausflug für Samstag.
Sprich langsam, maximal acht Wörter pro Satz. Frag mich mindestens nach:
der Uhrzeit, dem Treffpunkt, wer die Fahrkarten kauft, wann wir
zurückkommen, und ob ich dich abholen soll.
Nenne Uhrzeiten immer zuerst mit halb oder Viertel. Wenn ich das Präfix
eines trennbaren Verbs vergesse oder den Infinitiv nicht ans Satzende
stelle, wiederhole meinen Satz einfach richtig, ohne Erklärung.
Fang jetzt an.

Zweiter Block - du bist dran.

Jetzt tauschen wir. Du bist neu in Hamburg und ich wohne hier.
Stelle mir keine Fragen - ich frage dich. Antworte kurz, langsam,
maximal acht Wörter pro Satz.
Antworte als eine Person aus Spanien, die seit drei Wochen in Hamburg
ist, bei einer Familie wohnt, von zehn bis sechs arbeitet und mit der
Bahn zur Arbeit fährt. Wenn ich zwei Minuten lang nichts frage, sage
nur: Haben Sie eine Frage?

Diktat. Ten-second loop on the shadowing audio. Write eight German words by hand without pausing, then correct in a second colour.

Satz des Tages. Write by hand, from memory, the fifteen-sentence version of yourself from section 4’s Antwortdrill. Fifteen lines. Compare with the twelve-line version you wrote on Tag 12 and notice which three are new - that is a fortnight made visible.

Die Fehlerliste von Woche zwei. Promised on Tag 12 and due today. Take out the week-two error page, read it once slowly, and mark every item you now get right without thinking. Do not rewrite it, do not drill it. Whatever is still wrong moves onto the week-three page. Then compare: is the week-two page shorter than the week-one page was at the same age? If the cases are still on it, that is where week four’s spare minutes go.

Alle Tabellen, aus dem Kopf. Draw all four by hand without looking: the four sentence patterns, the three cases, the three pronoun columns, the six modal verbs. Then check each against section 3 in a second colour. Doing them from memory is the whole exercise - copying teaches nothing.

Fehlerliste. Week-three page. Everything the drills marked wrong today. Then draw a line under it and start a fresh page for week four - the week-three page comes back on Tag 24.

Genus-Farben. No new nouns. Go down the full list and say each one with all three articles plus its pronoun: der Bus, den Bus, dem Bus, ihn. One pass, out loud, whole list.

Goldlist 6.

Sixth Goldlist page. The schedule: Goldlist 1 (Tag 03) was distilled yesterday and comes round again on Tag 31. Goldlist 2 (Tag 06) distils on Tag 20, in two days. Goldlist 3 (Tag 09) on Tag 23, Goldlist 4 (Tag 12) on Tag 26, Goldlist 5 (Tag 15) on Tag 29.

  1. Fresh double page, today’s date, plus Goldlist and the number 6.

  2. Twenty-five items by hand, German left, English right, numbered. Take them from Tag 16 and Tag 17 - the modal verbs and the clock. Nothing already on Goldlists 1 to 5.

  3. Say each item aloud once as you write it. Once.

  4. Read the whole list aloud once when finished, slowly, without stopping.

  5. Close the notebook and walk away.

  6. Write in your calendar, 14 days from today: Goldlist 6 distillieren - that is Tag 32.


Weiter: Tag 19 - Perfekt I - die Vergangenheit mit haben, das Partizip II, und endlich über gestern sprechen.