Skip to content

Tag 17 - Die Uhrzeit

Tag 17 von 60 - die Uhr, die Wochentage, Termine machen. Zwei Stunden.


Two weeks of saying um acht and um neun without ever learning the clock properly. Today it arrives, and it contains the single most expensive misunderstanding available to an English speaker learning German.

halb drei does not mean half past three. It means half past two. German counts halfway to the coming hour, not half past the one that has gone. Get this wrong and you arrive an hour late to things, which is a different category of mistake from a wrong article.

Everything else today is straightforward, and by the end of it you can make an appointment - which, with the modal verbs from the last two days, is the first genuinely transactional conversation you can hold end to end.

The other four modals, cold.

Und dann Hören, fünf Minuten. Same clip, different job, and this is the half that self-study usually skips.

Play the whole forty seconds three times, without stopping and without reading anything on this page.

  1. First pass - words. Write down every German word you catch. Three is a result. Nine is a good day.
  2. Second pass - one sentence. Write down one complete sentence, even if half of it is a guess.
  3. Third pass - check yourself. Listen again and correct what you wrote.

There is no answer key, deliberately. No transcript is printed here and you are not meant to go hunting for one. A transcript would spare you the exact thing being trained: holding unfamiliar German in your head long enough to make sense of it. The clip never changes, so the only thing that can improve between today and the last day is you.

Two questions, both completely normal:

  • Wie spät ist es? - literally how late is it
  • Wie viel Uhr ist es? - what time is it

And the answer always starts Es ist ....

UhrzeitDeutsch
1:00Es ist ein Uhr.
2:00Es ist zwei Uhr.
3:15Es ist Viertel nach drei.
3:30Es ist halb vier.
3:45Es ist Viertel vor vier.
3:05Es ist fünf nach drei.
3:55Es ist fünf vor vier.

Note ein Uhr, not eins Uhr - the number loses its -s in front of Uhr.

This is the part to burn in.

DeutschWörtlichEnglisch
halb zweihalfway to twohalf past one, 1:30
halb dreihalfway to threehalf past two, 2:30
halb vierhalfway to fourhalf past three, 3:30
halb achthalfway to eighthalf past seven, 7:30

Timetables, appointments and anything official use the 24-hour clock, read straight off:

GeschriebenGesprochen
14:30vierzehn Uhr dreißig
09:15neun Uhr fünfzehn
20:45zwanzig Uhr fünfundvierzig
18:00achtzehn Uhr

This is the easier system and the one you should use for anything that matters. Der Zug fährt um vierzehn Uhr dreißig cannot be misread.

All masculine, all am when you say on:

Tagam …
Montagam Montag
Dienstagam Dienstag
Mittwocham Mittwoch
Donnerstagam Donnerstag
Freitagam Freitag
Samstagam Samstag
Sonntagam Sonntag

Mittwoch is literally mid-week and does not end in -tag, which is the only irregularity.

PräpositionWofürBeispiel
uma clock timeum acht Uhr
ama dayam Montag
von … bisfrom … tovon neun bis fünf
abfrom (onwards)ab Montag
DeutschEnglishWann
Wie spät ist es?what time is it
Es ist halb achtit is half past seventhe trap
Es ist Viertel nach dreiit is quarter past three
Es ist Viertel vor vierit is quarter to four
Der Zug fährt um vierzehn Uhrthe train leaves at two pmofficial time
Wann haben Sie Zeit?when do you have time
Am Montag um zehn Uhron Monday at tenam for the day, um for the time
Ich arbeite von neun bis fünfI work from nine to five
Passt Ihnen Dienstag?does Tuesday suit youfrom Tag 13
Ich möchte einen TerminI would like an appointmentder Termin
Haben Sie am Freitag Zeit?do you have time on Friday
Bis Montag!see you Mondaythe sign-off

Say the time in German. The first six use halb, nach and vor; the last four use the official clock.

Yesterday, two days back, five days back, twelve days back. Tag 05 is the twelve-day-old one.

Booking an appointment by phone, which is the hardest real-world German task you can now attempt - no face, no gestures, and numbers flying past.

Praxis: Praxis Doktor Weber, guten Tag. Ravi: Guten Tag. Ich möchte einen Termin, bitte. Praxis: Gern. Wann haben Sie Zeit? Ravi: Ich arbeite von neun bis fünf. Haben Sie am Freitag Zeit? Praxis: Am Freitag um halb sechs? Ravi: Wie bitte? Noch einmal, bitte. Praxis: Am Freitag um siebzehn Uhr dreißig. Ravi: Ah, siebzehn Uhr dreißig. Das passt mir gut. Praxis: Gut. Und wie heißen Sie? Ravi: Ravi Chaudhary. Soll ich etwas mitbringen? Praxis: Nur Ihre Karte. Bis Freitag! Ravi: Danke, bis Freitag!

The move in the middle is the one to copy: halb sechs was not understood, Ravi asked for a repeat, and the receptionist switched to the official 24-hour form - which was unambiguous. If you ever cannot parse a halb, ask for it again and you will usually get the digits.

die Praxis is a doctor’s practice, mitbringen is to bring along, nur is only, die Karte is the card. All free.

Read it aloud twice, both parts. Then cover Ravi’s lines and produce them from the receptionist’s cues.

The eight sentences you translated into German on Tag 15, coming back the other way. Do not look them up first.

Booking three appointments, which means hearing three times spoken at speed. Stand up.

Du arbeitest in einer Arztpraxis in Hamburg. Ich bin Anfänger (Tag 17, A1).
Heute übe ich die Uhrzeit und die Wochentage.
Ich rufe an und möchte einen Termin. Biete mir Termine an und nenne die
Zeit dabei **immer zuerst mit halb oder Viertel** - zum Beispiel "am
Dienstag um halb vier" - und erst wenn ich nachfrage, sage sie offiziell
("fünfzehn Uhr dreißig").
Mach das drei Mal mit drei verschiedenen Tagen und Zeiten. Frag mich auch:
Wann haben Sie Zeit? Von wann bis wann arbeiten Sie? Passt Ihnen das?
Sprich langsam, maximal acht Wörter pro Satz. Wenn ich eine halbe Stunde
falsch verstehe - "halb vier" als 4:30 - sage einfach die offizielle Zeit
und mach weiter. Fang jetzt an.

Diktat. Ten-second loop on the shadowing audio. Write six German words by hand without pausing, then correct in a second colour.

Satz des Tages. Write out by hand, from memory, your week: what time you get up, what time the course starts, what hours you work, which day you have time, and one appointment on a named day at a named time. Five lines, with at least two halb times in them. Check against section 3.

Die Uhr zeichnen. Draw four clock faces by hand and label them in German: 1:30, 3:15, 7:30, 8:45. Under each one write what you would say. The drawing matters because halb is a spatial idea - halfway to the next hour - and seeing the hand pointing down at the two while you write halb drei fixes it faster than any rule.

Fehlerliste. Week-three page. Every item the drills marked wrong today, in German only. Every halb error gets written twice.

Genus-Farben. Four new nouns: blue der Dienstag, der Termin; red die Uhr, die Praxis. The days continue to confirm the masculine rule.

Goldlist 1 - Destillation.

Fourteen days ago, on Tag 03, you wrote twenty-five items on a double page and closed the notebook. Today you open it for the first time.

  1. Read the page once, aloud, slowly. Top to bottom. Do not test yourself, do not cover the English, do not score anything. Just read it.

  2. Cross out everything you know. An item counts as known if the German came back without effort while you read it. Be honest but not harsh - hesitation is fine, struggle is not.

  3. Count what is left. Write the number at the bottom of the page.

  4. Copy the survivors onto a fresh page, renumbered, headed Goldlist 1 - Destillation 1 with today’s date. German left, English right, by hand, saying each one aloud once as you write it.

  5. Close the notebook and walk away again. Same rule as before.

  6. Write in your calendar, 14 days from today: Goldlist 1 - zweite Destillation - that is Tag 31.

The claim behind the method is that around a third of the list will have stayed without a single review, which means twenty-five should come down to roughly seventeen. Whatever number you get, write it down - because the number itself is the most useful piece of feedback in this whole course. If twenty survived, the items were too hard or the list was too long. If five survived, you have been reviewing it on the quiet and the experiment is spoiled. Around seventeen means the method is working exactly as advertised.


Weiter: Tag 18 - Wiederholungstag - kein neuer Stoff, drei Wochen in einer Tabelle, zwanzig Minuten sprechen, und Goldlist 6.