Tag 53 - Verben mit Präpositionen
Tag 53 von 60 - warten auf, denken an, sich freuen auf. Eine Liste, keine Regel. Zwei Stunden.
The last genuinely new thing in the course, and it has no theory at all.
Many German verbs come welded to a particular preposition. warten is always warten **auf**. denken is denken **an**. sich freuen is sich freuen **auf** or **über** depending on the timing. There is no logic that predicts which, and no rule to learn - the preposition is part of the verb and you memorise the pair.
That makes today the most mechanical page in sixty days, and the most immediately audible. Getting these wrong - ich warte für den Bus - is the single most recognisable foreign-learner error in German, because every German says the right one without thinking.
1. Aufwärmen - zehn Stück aus Tag 52
Section titled “1. Aufwärmen - zehn Stück aus Tag 52”The Konjunktiv, cold.
2. Shadowing - zehn Minuten
Section titled “2. Shadowing - zehn Minuten”Und dann Hören, fünf Minuten. Same clip, different job, and this is the half that self-study usually skips.
Play the whole forty seconds three times, without stopping and without reading anything on this page.
- First pass - words. Write down every German word you catch. Three is a result. Nine is a good day.
- Second pass - one sentence. Write down one complete sentence, even if half of it is a guess.
- Third pass - check yourself. Listen again and correct what you wrote.
There is no answer key, deliberately. No transcript is printed here and you are not meant to go hunting for one. A transcript would spare you the exact thing being trained: holding unfamiliar German in your head long enough to make sense of it. The clip never changes, so the only thing that can improve between today and the last day is you.
3. Neue Bausteine - die Liste
Section titled “3. Neue Bausteine - die Liste”Nach Präposition sortiert
Section titled “Nach Präposition sortiert”Learn each one as verb plus preposition, out loud, as one word.
auf + Akkusativ - the biggest group
| Deutsch | English |
|---|---|
| warten auf | to wait for |
| sich freuen auf | to look forward to |
| sich vorbereiten auf | to prepare for |
| achten auf | to pay attention to |
| antworten auf | to answer |
| aufpassen auf | to keep an eye on |
an + Akkusativ
| Deutsch | English |
|---|---|
| denken an | to think of |
| sich erinnern an | to remember |
| glauben an | to believe in |
| schreiben an | to write to |
über + Akkusativ
| Deutsch | English |
|---|---|
| sprechen über | to talk about |
| sich freuen über | to be glad about |
| sich ärgern über | to be annoyed about |
| nachdenken über | to think over |
| sich beschweren über | to complain about |
für + Akkusativ
| Deutsch | English |
|---|---|
| sich interessieren für | to be interested in |
| sich bedanken für | to thank for |
| sorgen für | to see to |
um + Akkusativ
| Deutsch | English |
|---|---|
| sich bewerben um | to apply for |
| bitten um | to ask for |
| sich kümmern um | to take care of |
mit + Dativ
| Deutsch | English |
|---|---|
| sprechen mit | to speak to |
| telefonieren mit | to speak on the phone to |
| anfangen mit | to start with |
| rechnen mit | to count on, to expect |
| sich treffen mit | to meet |
| zufrieden sein mit | to be satisfied with |
von + Dativ
| Deutsch | English |
|---|---|
| abhängen von | to depend on |
| erzählen von | to tell about |
| träumen von | to dream of |
nach + Dativ
| Deutsch | English |
|---|---|
| fragen nach | to ask after |
| suchen nach | to search for |
| riechen nach | to smell of |
zu + Dativ
| Deutsch | English |
|---|---|
| gehören zu | to belong to |
| passen zu | to go with, to suit |
| einladen zu | to invite to |
darauf, daran, darüber - wenn kein Nomen folgt
Section titled “darauf, daran, darüber - wenn kein Nomen folgt”When the thing is already known, German does not repeat it. Instead it welds da- onto the front of the preposition - dar- if the preposition starts with a vowel:
| Volle Form | Kurzform |
|---|---|
| Ich warte auf den Bus. | Ich warte darauf. |
| Ich freue mich auf das Wochenende. | Ich freue mich darauf. |
| Ich denke an den Termin. | Ich denke daran. |
| Wir sprechen über die Wohnung. | Wir sprechen darüber. |
| Ich kümmere mich um das Formular. | Ich kümmere mich darum. |
| Das hängt vom Wetter ab. | Das hängt davon ab. |
| Ich rechne mit einer Antwort. | Ich rechne damit. |
So: auf becomes darauf, an becomes daran, über becomes darüber, um becomes darum, von becomes davon, mit becomes damit, für becomes dafür, nach becomes danach.
Ich kümmere mich darum. - I will take care of it - is the single most useful sentence on this page. It is what you say at work when something becomes yours.
But only for things, not for people. With people, German uses a normal pronoun after the preposition:
| Sache | Person |
|---|---|
| Ich warte darauf. | Ich warte auf ihn. |
| Ich denke daran. | Ich denke an sie. |
| Wir sprechen darüber. | Wir sprechen über ihn. |
worauf, woran, worüber - die Frage
Section titled “worauf, woran, worüber - die Frage”The question works the same way, with wo- or wor-:
| Frage | Antwort |
|---|---|
| Worauf wartest du? | Auf den Bus. |
| Woran denkst du? | An den Termin. |
| Worüber sprechen Sie? | Über die Wohnung. |
| Worum geht es? | Um die Wohnung. |
| Wovon hängt das ab? | Vom Wetter. |
| Womit rechnen Sie? | Mit einer Antwort. |
And again, people get a different question word - wen or wem after the preposition:
| Sache | Person |
|---|---|
| Worauf wartest du? | Auf wen wartest du? |
| Woran denkst du? | An wen denkst du? |
| Mit wem haben Sie gesprochen? | - (always a person, so always wem) |
Worum geht es? - what is it about? - is the other sentence to take away from this page. It is how you ask what a phone call, an email or a meeting is actually concerned with.
Die zwölf Bausteine
Section titled “Die zwölf Bausteine”| Deutsch | English |
|---|---|
| Ich warte auf den Bus | I am waiting for the bus |
| Ich freue mich auf das Wochenende | I am looking forward to the weekend |
| Ich denke oft an meine Familie | I often think of my family |
| Ich erinnere mich an den Termin | I remember the appointment |
| Wir sprechen über die Wohnung | we are talking about the flat |
| Ich ärgere mich über den Lärm | I am annoyed about the noise |
| Ich interessiere mich für die Stelle | I am interested in the position |
| Ich bedanke mich für Ihre Hilfe | thank you for your help |
| Ich rechne mit einer Antwort | I am expecting a reply |
| Das hängt vom Wetter ab | that depends on the weather |
| Ich kümmere mich darum | I will take care of it |
| Worum geht es? | what is it about |
4. Drills
Section titled “4. Drills”Der Präpositionsdrill
Section titled “Der Präpositionsdrill”Name the preposition only. Fast, out loud, no sentences. Then do the whole block a second time.
Kasusdrill
Section titled “Kasusdrill”Preposition plus the right case. The accusative ones are the trap.
Der darauf-Drill
Section titled “Der darauf-Drill”Replace the noun with the short form.
Der worauf-Drill
Section titled “Der worauf-Drill”Ask the question that the answer needs.
Antwortdrill
Section titled “Antwortdrill”Full sentences, out loud, your own facts where possible.
Übersetzungsdrill
Section titled “Übersetzungsdrill”Note the second-to-last one: Ich erinnere mich daran, dass .... When the thing you remember is a whole clause, the da- form goes in first and the dass clause follows it. Same with Ich freue mich darauf, dass Sie kommen and Ich warte darauf, dass er anruft.
5. Wiederholung
Section titled “5. Wiederholung”Yesterday, two days back, five days back, twelve days back, thirty days back. Tag 23 is the thirty-day-old one - directions and the imperative.
6. Text und Hören
Section titled “6. Text und Hören”The first day at work, which is almost entirely made of these pairs.
Jonas: Guten Morgen. Ich bin Jonas - ich kümmere mich um Ihre Einarbeitung. Ravi: Guten Morgen. Ich freue mich auf die Arbeit. Jonas: Gut. Wir fangen mit dem Laptop an, dann mit den Zugängen. Ravi: Worum geht es im ersten Projekt? Jonas: Um einen Windpark in Schleswig-Holstein. Wir warten noch auf die Genehmigung. Ravi: Wovon hängt die ab? Jonas: Von der Behörde. Wir rechnen im Februar damit. Ravi: Und nehmen alle am Projekt teil? Jonas: Vier Leute. Sie arbeiten mit mir und mit Frau Kaya zusammen. Ravi: Mit wem spreche ich, wenn es ein technisches Problem gibt? Jonas: Mit mir. Oder mit der IT - aber fragen Sie zuerst nach mir. Ravi: Und wenn Sie nicht da sind? Jonas: Dann kümmert sich Frau Kaya darum. Denken Sie bitte daran, dass sie dienstags im Homeoffice ist. Ravi: Daran denke ich. Noch eine Frage - worüber sprechen wir in der Montagsrunde? Jonas: Über den Status, kurz. Jeder zwei Minuten. Bereiten Sie sich nicht groß darauf vor. Ravi: Gut. Ich bedanke mich für die Einführung. Jonas: Gern. Und noch was: Ärgern Sie sich nicht über die Formulare. An die gewöhnt man sich.
der Zugang is an access or login, die Genehmigung is the permit, zusammenarbeiten mit is to work together with, die Montagsrunde is the Monday round-up, die Einführung is the introduction, and sich gewöhnen an - to get used to - is one more pair for the list.
Count them: there are seventeen verb-plus-preposition pairs in those eighteen lines. That is not an artificial density. It is what German sounds like at work, and it is why this page is worth more than its lack of grammar suggests.
Read it aloud twice, both parts. Then cover Jonas’s lines and ask the questions yourself - Worum geht es?, Wovon hängt das ab?, Mit wem spreche ich?, Worüber sprechen wir?
7. Bidirektional - die acht Sätze von Tag 51
Section titled “7. Bidirektional - die acht Sätze von Tag 51”Back the other way. The German is the prompt; produce the English.
8. Sprechen - zehn Minuten
Section titled “8. Sprechen - zehn Minuten”Pure pair practice, fast. Stand up.
Du bist mein Deutschlehrer. Ich bin Lernender (Tag 53). Heute habe ichVerben mit Präpositionen gelernt.
ERSTER TEIL - vier Minuten, schnell. Sag mir ein Verb auf Deutsch, ichsage sofort die Präposition und den Fall. Dreißig Verben, kein Satz,keine Erklärung. Wenn ich falsch liege, sag nur das richtige Paar undgeh weiter.
ZWEITER TEIL - drei Minuten. Jetzt stell mir zwölf Fragen mit worauf,woran, worüber, wofür, womit, wovon und worum. Ich antworte mit einemganzen Satz über mein echtes Leben.
DRITTER TEIL - drei Minuten. Jetzt dieselben Fragen, aber ich muss mitder da-Form antworten und sie VORNE anfangen: "Darauf freue ich mich.""Daran denke ich oft."
Zwei Fragen sollen sich auf PERSONEN beziehen - dann muss ich "auf ihn","an sie" sagen und nicht die da-Form. Prüfe das.9. Auf Papier - Goldlist
Section titled “9. Auf Papier - Goldlist”Diktat. Ten-second loop on the shadowing audio. Six German words by hand, then correct in a second colour.
Die Liste, von Hand, nach Präposition. Copy the whole of section 3 out by hand, grouped by preposition exactly as it is laid out, with the case written next to each group. About thirty-five pairs.
This is dull and it is the single highest-value handwriting exercise in the course, because these are the items that no amount of listening will teach you and no rule will predict. Copy it once today, and once more on Tag 56.
Zehn eigene Sätze. By hand, in German: ten true sentences about your own life, each using a different pair. What you are waiting for, what you are looking forward to, who you think about, what you are interested in, what annoys you, what you applied for, what you are expecting, what something depends on, who you spoke to, what you will take care of.
Die da-Übung. Take five of those ten and rewrite each twice: once with da- in the normal position, once with da- at the front. Ten lines. Ich freue mich darauf and Darauf freue ich mich.
Fehlerliste. Week-eight page. Every wrong preposition from today, written as the whole pair - never the preposition alone.
Genus-Farben. No new nouns. One pass down the list with warten auf: Ich warte auf den Bus, Ich warte auf die Bahn, Ich warte auf das Formular. That drills the accusative that these pairs demand.
Goldlist 13 - erste Destillation.
Day 53, minus 14 is day 39, so this is the first distillation of Goldlist page 13.
-
Find Goldlist 13. Twenty-five items, fourteen days old.
-
Cover the English. Read the German aloud, three seconds each.
-
Cross out every item you knew without hesitation and with the right article.
-
Copy the survivors onto a fresh page headed Goldlist 13 - erste Destillation, numbered. Expect sixteen or seventeen.
-
Write in your calendar, 14 days from today: Goldlist 13 zweite Destillation - day 67, after the course ends. Diarise it.
Weiter: Tag 54 - Wiederholungstag - kein neuer Stoff, die ganze achte Woche auf einer Seite, zwanzig Minuten sprechen, und die Prozentzahl noch einmal.