How I Run Projects

Every project I have led followed the same path, whether it was a dashboard, a new process or a system rollout: understand the problem with the people who live it, get it approved, plan it, pilot it, roll it out with training, check that it works, and hand it over so it keeps working without me.

Initiateproblem, case, approval
→
Planusers, scope, milestones
→
Build or set upand test
→
Pilotsmall first, then fix
→
Roll out and trainevery user group
→
Monitoradoption, KPIs, reporting
→
Closehandover, lessons
The same seven phases run through every project on this site.
PhaseWhat I doWhere it happened
InitiateDefine the problem in the users’ terms, show what it costs, and get the sponsor’s approval before anything is builtEach government project went ahead only with the approval of senior authorities; Pravah started with a timed walk through the process
PlanGather requirements by talking to the people who will use it, fix the scope and what is out of scope, plan milestones and a pilotGST Nirikshak: a written specification and fifteen milestones; Sankalan: template fields agreed with the users
Build or set up, and testBuild or configure in stages, matching the real workflow, and test each stage before the nextMPR Drishti: a staged pipeline tested on real reports; GST Nirikshak: 507 automated tests
PilotStart small, watch where people get stuck, fix it before scalingeOffice: one section first; Pravah: real shifts; Sankalan: the first units; MPR Drishti: a first version rebuilt to run without installation
Roll out and trainBring every user group on board, train them hands-on and give them guidance they can keepeOffice: training at the desk; Santulan: templates with a fill-in guide; GST Nirikshak: a built-in manual and a demo zone
Monitor and controlTrack adoption and results, follow up where things slip, report progress to the sponsorSankalan: flags for missing or stale updates; MPR Drishti: completeness checks; regular reports to senior authorities
Close and hand overHand over a running system, its documentation and its routine, so it survives without meEvery project was handed over to my successor or the team; Santulan was used for actual transfers two years in a row

System implementation

eOffice rollout: moving a department from paper files to an electronic file system, from 2019: plan, set-up, pilot, desk training, support and handover.

Rollout across units

Sankalan: one template and one dashboard adopted by every commissionerate, followed up and reported on, then handed over.

Process change

Pravah: a container-scanning process redesigned with the officers, piloted on real shifts and made routine: 6-7 minutes down to under one.

Planned delivery

GST Nirikshak: specification, fifteen milestones, 507 tests, a manual and a demo zone, handed over to the team in August 2024.

In government, my projects ran inside a hierarchy and without formal budgets, so the paperwork was proportionate: an approval from senior authorities, a plan, progress reports and a handover to my successor. The formal project management toolkit I learned and practised separately, and I now use it to put structure on the way I have always worked.

WhereWhat I practised
Google Project Management CertificateThe full life cycle from initiation to closing: project charters, stakeholder analysis, scope, schedules, budgets, risk management, RACI, quality, communication plans, agile and Scrum, and a capstone that pilots a new ordering system
Project RE:CHARGEA complete team project plan: charter, work breakdown structure, RACI, communication plan, Gantt chart, stakeholder matrix and risk register
Contract & SLA CopilotA gated 30/60/90-day rollout with go and no-go criteria, eleven KPIs, stop-and-fix triggers and a kill switch
Agile project managementAgile and hybrid delivery, from my MBA course in applied market and business strategy
SAP Certified Implementation ConsultantEnd-to-end business processes in SAP S/4HANA, the processes an enterprise system implementation has to support

Before go-live

A stakeholder map, the current process mapped with the people who run it, requirements in their words, a configuration that fits the real workflow, and a pilot with clear criteria for going wider.

At go-live

A training plan for every user group, short user guidance they can keep at hand, and a known first point of contact for questions.

After go-live

Adoption and performance tracked against simple KPIs, a log of risks, issues and actions, regular reporting to the sponsor, and improvements fed back into the next release.

At the end

A clean handover: documentation, a routine that works without me, and the lessons learned written down for the next project.