Tag 44 - Telefonieren und buchstabieren
Tag 44 von 60 - der Anruf, das Buchstabieralphabet, und die Rettungssätze. Zwei Stunden.
The telephone is the hardest thing in a foreign language, and everybody knows it. No face, no lips to read, no gestures, compressed audio, and an impatient stranger. People who can hold a conversation in a café freeze completely on the phone.
It is also unavoidable. Yesterday’s flat advert said Besichtigung: Samstag - and to get on that list you call.
So today is built differently from every other page. The vocabulary is small; the rescue sentences are the point, plus the one genuinely mechanical skill German has for the telephone: the spelling alphabet.
1. Aufwärmen - zehn Stück aus Tag 43
Section titled “1. Aufwärmen - zehn Stück aus Tag 43”The flat hunt, cold.
2. Shadowing - zehn Minuten
Section titled “2. Shadowing - zehn Minuten”Und dann Hören, fünf Minuten. Same clip, different job, and this is the half that self-study usually skips.
Play the whole forty seconds three times, without stopping and without reading anything on this page.
- First pass - words. Write down every German word you catch. Three is a result. Nine is a good day.
- Second pass - one sentence. Write down one complete sentence, even if half of it is a guess.
- Third pass - check yourself. Listen again and correct what you wrote.
There is no answer key, deliberately. No transcript is printed here and you are not meant to go hunting for one. A transcript would spare you the exact thing being trained: holding unfamiliar German in your head long enough to make sense of it. The clip never changes, so the only thing that can improve between today and the last day is you.
3. Neue Bausteine - zwölf Stück
Section titled “3. Neue Bausteine - zwölf Stück”Wie Deutsche sich am Telefon melden
Section titled “Wie Deutsche sich am Telefon melden”This catches out every newcomer. A German does not say hello when answering. They say their surname, and nothing else:
Chaudhary.
Müller, guten Tag.
Hausverwaltung Nordstadt, Schneider, guten Tag.
So the first sound you hear on a German call is an unfamiliar surname at speed, which is exactly the hardest thing to catch. That is normal and it is not your failure.
And you answer the same way. Not Hallo - your surname. On a mobile it is slightly softer: Chaudhary, hallo? is fine.
Der Anruf
Section titled “Der Anruf”| Deutsch | English |
|---|---|
| anrufen | to call |
| zurückrufen | to call back |
| der Anruf | the call |
| die Nummer | the number |
| die Vorwahl | the area code |
| die Durchwahl | the direct extension |
| besetzt | engaged |
| der Anrufbeantworter | the answering machine |
| die Nachricht | the message |
| die Verbindung | the connection |
| verbinden | to put through |
| Auf Wiederhören | goodbye, on the phone |
Das Buchstabieralphabet
Section titled “Das Buchstabieralphabet”Germans spell names on the phone with a fixed list of words - A wie Anton - exactly as English uses A for Alpha. You need this for your own name and address, every time.
| A wie Anton | H wie Heinrich | O wie Otto | V wie Viktor |
| B wie Berta | I wie Ida | P wie Paula | W wie Wilhelm |
| C wie Cäsar | J wie Julius | Q wie Quelle | X wie Xanthippe |
| D wie Dora | K wie Kaufmann | R wie Richard | Y wie Ypsilon |
| E wie Emil | L wie Ludwig | S wie Samuel | Z wie Zacharias |
| F wie Friedrich | M wie Martha | T wie Theodor | Ä wie Ärger |
| G wie Gustav | N wie Nordpol | U wie Ulrich | Ö wie Ökonom |
| Ü wie Übermut |
So Chaudhary goes out like this, and it is worth learning as one unbroken sequence:
C wie Cäsar, H wie Heinrich, A wie Anton, U wie Ulrich, D wie Dora, H wie Heinrich, A wie Anton, R wie Richard, Y wie Ypsilon.
Say it ten times today. Not five - ten. It is the single most frequently needed piece of German in an immigrant’s first year, and it has to come out without thinking while someone types.
Three extras you will need:
| Deutsch | English |
|---|---|
| mit Doppel-L | with a double L |
| mit scharfem S / Eszett | with ß |
| groß geschrieben / klein geschrieben | upper case / lower case |
Die Rettungssätze
Section titled “Die Rettungssätze”The real content of this page. Four sentences, and the point is that they must be faster than your embarrassment:
| Deutsch | English |
|---|---|
| Können Sie das bitte wiederholen? | can you repeat that, please |
| Können Sie bitte langsamer sprechen? | can you speak more slowly, please |
| Ich verstehe Sie nicht gut, die Verbindung ist schlecht. | I cannot hear you well, the connection is bad |
| Können Sie das bitte buchstabieren? | can you spell that, please |
die Verbindung ist schlecht is the most useful of the four and it is worth noticing why: it moves the problem from your German to the telephone line. It is polite, it is usually at least half true, and it buys you a slower repetition without either side losing face.
Die zwölf Bausteine
Section titled “Die zwölf Bausteine”| Deutsch | English | Wann |
|---|---|---|
| Guten Tag, hier spricht Ravi Chaudhary | hello, this is Ravi Chaudhary speaking | opening |
| Ich rufe wegen der Wohnung an | I am calling about the flat | wegen + Genitiv, Tag 41 |
| Kann ich bitte Frau Schneider sprechen? | may I speak to Frau Schneider | |
| Können Sie das bitte wiederholen? | can you repeat that, please | rescue |
| Können Sie bitte langsamer sprechen? | can you speak more slowly, please | rescue |
| Die Verbindung ist schlecht | the connection is bad | rescue |
| Können Sie das bitte buchstabieren? | can you spell that, please | rescue |
| Wie ist Ihre Telefonnummer? | what is your telephone number | |
| Kann sie mich zurückrufen? | can she call me back | |
| Ich rufe später noch einmal an | I will call again later | |
| Vielen Dank für Ihre Hilfe | thank you for your help | closing |
| Auf Wiederhören | goodbye | closing, on the phone only |
4. Drills
Section titled “4. Drills”Buchstabierdrill
Section titled “Buchstabierdrill”Spell each one out loud with the full X wie ... names. No shortcuts, no letter names on their own. This is a mouth drill, not a memory drill.
Substitutionsdrill
Section titled “Substitutionsdrill”Herrn, not Herr, after sprechen - Herr is one of the few German nouns that takes an -n in every case except the nominative.
Konversionsdrill - die trennbaren Verben am Telefon
Section titled “Konversionsdrill - die trennbaren Verben am Telefon”anrufen and zurückrufen both split, as on Tag 14.
Antwortdrill - am Telefon
Section titled “Antwortdrill - am Telefon”Übersetzungsdrill
Section titled “Übersetzungsdrill”5. Wiederholung
Section titled “5. Wiederholung”Yesterday, two days back, five days back, twelve days back, thirty days back. Tag 14 is the thirty-day-old one - the separable verbs, which is no accident today.
6. Text und Hören
Section titled “6. Text und Hören”The call that gets you onto the viewing list. Note how short it is - a German call of this kind runs about ninety seconds, and the whole thing is four pieces of information.
Schneider: Hausverwaltung Nordstadt, Schneider, guten Tag. Ravi: Guten Tag, hier spricht Ravi Chaudhary. Ich rufe wegen der Wohnung in Eimsbüttel an. Schneider: Die 2-Zimmer-Wohnung? Die ist noch frei. Ravi: Sehr gut. Kann ich die Wohnung besichtigen? Schneider: Die Besichtigung ist am Samstag um vierzehn Uhr. Sammelbesichtigung. Ravi: Entschuldigung, können Sie das bitte wiederholen? Die Verbindung ist schlecht. Schneider: Samstag, vierzehn Uhr. Also zwei Uhr nachmittags. Ravi: Samstag um vierzehn Uhr. Danke. Soll ich die Unterlagen mitbringen? Schneider: Ja, bitte vollständig. Schufa, drei Gehaltsabrechnungen, Ausweis. Ravi: Habe ich alles dabei. Wie war Ihr Name, bitte? Schneider: Schneider. S wie Samuel, C wie Cäsar, H wie Heinrich, N wie Nordpol, E, I, D, E, R. Ravi: Danke. Und darf ich meinen Namen buchstabieren? Chaudhary - C wie Cäsar, H wie Heinrich, A wie Anton, U wie Ulrich, D wie Dora, H wie Heinrich, A wie Anton, R wie Richard, Y wie Ypsilon. Schneider: Habe ich. Dann bis Samstag, Herr Chaudhary. Ravi: Vielen Dank für Ihre Hilfe. Auf Wiederhören. Schneider: Auf Wiederhören.
die Sammelbesichtigung is a group viewing - everyone at once, which is the norm in Hamburg. vollständig is complete, from yesterday’s advert.
Read it aloud twice, both parts. Then read it a third time holding your phone to your ear with the other hand covering your eyes, so you cannot see the page. The point is not the text; it is doing this with no visual support.
7. Bidirektional
Section titled “7. Bidirektional”Into German today. On Tag 46 you will translate these back the other way.
8. Sprechen - zehn Minuten
Section titled “8. Sprechen - zehn Minuten”Three calls, and the model is instructed to be hard to hear. Stand up, and hold your phone to your ear even if the audio is coming from the laptop.
Du bist am Telefon. Ich bin Lernender (Tag 44). Wir machen DREI kurzeAnrufe, jeder maximal zwei Minuten.
ANRUF 1 - Hausverwaltung. Du meldest dich nur mit dem Namen "Schneider".Ich frage nach der Wohnung und einem Besichtigungstermin. Nenne einenTermin im 24-Stunden-Format.
ANRUF 2 - Arztpraxis. Du gibst mir einen Termin und buchstabierst MIReinen Namen, den ich zurückbuchstabieren muss.
ANRUF 3 - jemand hat sich verwählt und will zu "Frau Berger". Ich musssagen, dass hier niemand mit dem Namen wohnt.
Wichtig: sprich schnell und undeutlich, so wie am Telefon. Wenn ich"Können Sie das bitte wiederholen" oder "langsamer" sage, wiederholeEINMAL langsam - dann wieder normal schnell.
Verlange bei jedem Anruf, dass ich meinen Namen buchstabiere.9. Auf Papier - Goldlist
Section titled “9. Auf Papier - Goldlist”Diktat. Ten-second loop on the shadowing audio, at the quiet volume from section 2. Six German words by hand, then correct in a second colour.
Das Buchstabieralphabet, aus dem Kopf. Write the whole list by hand - all twenty-six letters with their names, plus the three umlauts. Then check it. The ones that will be missing are Q, X and Y, which is fine, because the one you must never hesitate on is Y wie Ypsilon, and it is the last letter of your surname.
Die Namen-Übung. Write out, in full X wie ... form, by hand: your surname, your first name, your street, and the name of your city. Four lines, and together they are about ninety per cent of everything you will ever have to spell in Germany. Then say all four aloud twice, timed - under twenty seconds each.
Satz des Tages. The four rescue sentences, by hand, from memory. Then write underneath, in German, the three-line opening of a call: who you are, why you are calling, what you want.
Fehlerliste. Week-seven page. Every wrong item from today. Add the names you could not spell.
Genus-Farben. Eight new nouns. Blue: der Anruf, der Anrufbeantworter. Red: die Vorwahl, die Durchwahl, die Nachricht, die Verbindung, die Telefonnummer. Green: das Telefon.
Goldlist 10 - erste Destillation.
Day 44, minus 14 is day 30, so this is the first distillation of Goldlist page 10 - written two weeks ago on a review day.
-
Find Goldlist 10. Twenty-five items, fourteen days old, untouched.
-
Cover the English. Read the German aloud, one at a time, three seconds each.
-
Cross out every item you knew without hesitation and with the right article.
-
Copy the survivors onto a fresh page headed Goldlist 10 - erste Destillation, numbered. Expect sixteen or seventeen.
-
Write in your calendar, 14 days from today: Goldlist 10 zweite Destillation - that is Tag 58.
Weiter: Tag 45 - E-Mail und Brief - Sehr geehrte Damen und Herren, die Anrede, der Betreff, und die acht Sätze von Tag 43 zurück.