Skip to content

Tag 23 - Wegbeschreibung und Imperativ

Tag 23 von 60 - der Imperativ, links und rechts, den Weg erklären. Zwei Stunden.


You have been asking Wie komme ich zum Bahnhof? since Tag 11 and understanding roughly half of the answer. Today you learn the other half - both how to give directions yourself, and more importantly how to parse them when they come back at you fast.

The grammar is the easiest of the whole course. To tell someone politely to do something, take the Sie form of the verb and put it first: Sie gehen becomes **Gehen Sie!**. That is the entire rule, and you have been using it unknowingly since Tag 07 - Sprechen Sie bitte langsam, Nehmen Sie die Straße, Rufen Sie mich an. All imperatives.

Position and movement, cold.

Und dann Hören, fünf Minuten. Same clip, different job, and this is the half that self-study usually skips.

Play the whole forty seconds three times, without stopping and without reading anything on this page.

  1. First pass - words. Write down every German word you catch. Three is a result. Nine is a good day.
  2. Second pass - one sentence. Write down one complete sentence, even if half of it is a guess.
  3. Third pass - check yourself. Listen again and correct what you wrote.

There is no answer key, deliberately. No transcript is printed here and you are not meant to go hunting for one. A transcript would spare you the exact thing being trained: holding unfamiliar German in your head long enough to make sense of it. The clip never changes, so the only thing that can improve between today and the last day is you.

Take the Sie form, move the verb to the front, keep the Sie.

AussageImperativ
Sie gehenGehen Sie!
Sie nehmenNehmen Sie!
Sie wartenWarten Sie!
Sie kommenKommen Sie!
Sie fahrenFahren Sie!
Sie sprechenSprechen Sie!

No exceptions, no vowel changes, nothing to learn. And the yes-no question has the same shape - Gehen Sie? versus Gehen Sie! - so the melody is doing the work: a question rises, an imperative falls. That is the Tag 07 melody lesson turning out to be grammar.

You will hear this constantly even if you do not use it yet. The informal imperative is the bare stem with no ending and no pronoun:

Sie-Formdu-Form
Gehen Sie!Geh!
Kommen Sie!Komm!
Warten Sie!Warte!
Nehmen Sie!Nimm!

Recognise them; keep using Sie yourself with anyone you have not been invited to address informally.

DeutschEnglish
geradeausstraight ahead
linksleft
rechtsright
nach linksto the left
nach rechtsto the right
die erste Straßethe first street
die zweite Straßethe second street
an der Ampelat the traffic light
an der Kreuzungat the junction
gegenüberopposite
bis zur Kreuzungas far as the junction
ungefähr fünf Minutenabout five minutes
DeutschEnglishWann
Gehen Sie geradeausgo straight ahead
Gehen Sie nach linksgo to the left
Nehmen Sie die erste Straße rechtstake the first street on the right
Gehen Sie bis zur Ampelgo as far as the traffic lightbis zu plus dative
An der Kreuzung linksleft at the junctionno verb needed
Fahren Sie mit dem Bus Nummer viertake the bus number four
Steigen Sie am Bahnhof ausget off at the stationaussteigen, separable
Es ist gegenüber der Postit is opposite the post office
Es sind ungefähr fünf Minutenit is about five minutes
Warten Sie bitte hierplease wait here
Ist es weit?is it far
Nein, es ist gleich hierno, it is right heregleich, right / immediately

Turn the statement into a polite instruction.

Somebody is standing in front of you asking. Give the instruction.

Yesterday, two days back, five days back, twelve days back. Tag 11 is the twelve-day-old one - the dative prepositions, which every direction on this page uses.

A full set of directions at realistic length. Read the woman’s long answer once and try to follow it without translating - then check yourself against the summary underneath.

Ravi: Entschuldigung, können Sie mir helfen? Ich suche die Post. Frau: Die Post? Ja, gern. Gehen Sie hier geradeaus, bis zur Ampel. Ravi: Bis zur Ampel, ja. Frau: An der Ampel gehen Sie nach rechts. Dann nehmen Sie die zweite Straße links. Ravi: Die zweite Straße links. Und dann? Frau: Dann sehen Sie einen Supermarkt. Die Post ist gegenüber dem Supermarkt. Ravi: Gegenüber dem Supermarkt. Ist es weit? Frau: Nein, es sind ungefähr sieben Minuten. Ravi: Und wann schließt die Post? Frau: Um sechs, glaube ich. Gehen Sie schnell! Ravi: Vielen Dank! Das war sehr nett. Frau: Gern. Alles Gute!

The route, in four steps: straight to the traffic light, right, second street on the left, opposite the supermarket. If you got those four from the German without going through English, your listening has moved a long way in three weeks.

The thing Ravi does right, and which you should copy whenever anyone gives you directions: he repeats each step back. Bis zur Ampel, ja. Die zweite Straße links. It buys thinking time, it confirms you heard correctly, and it makes the other person slow down naturally without you having to ask.

der Supermarkt, schließen to close, glaube ich I think, schnell fast, Alles Gute all the best. All free.

Read it aloud twice, both parts. Then cover the woman’s lines and give the directions yourself from the four-step summary.

Into German today. On Tag 25 you will translate these back the other way.

Both directions, literally. Stand up.

Du bist eine Person auf der Straße in Hamburg. Ich bin Anfänger
(Tag 23, A1). Heute übe ich den Imperativ und die Wegbeschreibung.
Erster Teil: Ich frage dich dreimal nach dem Weg - zur Post, zum Bahnhof,
zum Supermarkt. Gib mir jedes Mal eine Wegbeschreibung mit MINDESTENS
drei Schritten und benutze dabei: geradeaus, nach links, nach rechts,
bis zur Ampel, an der Kreuzung, die erste oder zweite Straße, gegenüber.
Sprich langsam, aber mach die Beschreibung wirklich dreischrittig.
Zweiter Teil: Dann fragst DU mich nach dem Weg, dreimal, und ich erkläre
es dir. Frag nach: dem Bahnhof, der Uni, einem Café.
Wenn ich einen Imperativ falsch bilde - "Sie gehen geradeaus" statt
"Gehen Sie geradeaus" - wiederhole meinen Satz einfach richtig, ohne
Erklärung. Fang jetzt an.

Diktat. Ten-second loop on the shadowing audio. Write six German words by hand without pausing, then correct in a second colour.

Satz des Tages. Write out by hand, from memory, the route from your front door to the nearest station or bus stop, in German, in five imperative steps as if you were telling a stranger. Five lines, every one starting with a verb. Then walk it in your head and check the steps are in the right order - this is the one Satz des Tages with a factual right answer.

Die Richtungs-Karte. Draw a simple street map by hand: a straight road, a traffic light, two side streets, a supermarket and a post office. Then write the four-step route from section 6 alongside it in German. Keep it - on Tag 27 you will use the same map to give directions under time pressure.

Fehlerliste. Week-four page. Every item the drills marked wrong today, in German only. Every imperative with the verb in the wrong place gets written twice.

Genus-Farben. Five new nouns: red die Ampel, die Kreuzung, die Post, die Minute; blue der Supermarkt. Note die Post is feminine and so is die Ampel - both are things you will ask about, so they are worth being sure of.

Goldlist 3 - Destillation.

Fourteen days ago, on Tag 09, you wrote twenty-five items and closed the notebook. Today you open it.

  1. Read the page once, aloud, slowly. No testing, no covering, no scoring.

  2. Cross out everything you know - known meaning the German came back without effort as you read it.

  3. Count what is left and write the number at the bottom.

  4. Copy the survivors onto a fresh page, renumbered, headed Goldlist 3 - Destillation 1 with today’s date. By hand, each one said aloud once.

  5. Close the notebook and walk away.

  6. Write in your calendar, 14 days from today: Goldlist 3 - zweite Destillation - that is Tag 37.

Third distillation, third number. Write all three side by side somewhere: Tag 17, Tag 20, Tag 23. If the survival rate is steady at around two thirds crossed out, the method is stable and you can stop checking. If it is climbing, your lists are getting easier - make the next one harder.


Weiter: Tag 24 - Wiederholungstag - kein neuer Stoff, vier Wochen in einer Tabelle, zwanzig Minuten sprechen, und Goldlist 8.