Tag 34 - Reflexive Verben
Tag 34 von 60 - ich freue mich, sich treffen, sich fühlen, sich beeilen. Zwei Stunden.
Yesterday ended with Ich freue mich - I am looking forward to it - handed over as an unexplained block. Today it is the lesson, and it opens a family of verbs that German treats quite differently from English.
A reflexive verb carries a pronoun that points back at the subject: Ich freue **mich**, literally I gladden myself. English has a few of these - I hurt myself, behave yourself - but German has many more, and crucially the German list does not match the English one. sich freuen, sich fühlen, sich treffen, sich beeilen are all reflexive in German and none of them is in English.
So this is not a hard rule; it is a list you learn with the verb. The grammar itself takes five minutes.
1. Aufwärmen - zehn Stück aus Tag 33
Section titled “1. Aufwärmen - zehn Stück aus Tag 33”Adjectives without an article, cold.
2. Shadowing - zehn Minuten
Section titled “2. Shadowing - zehn Minuten”Und dann Hören, fünf Minuten. Same clip, different job, and this is the half that self-study usually skips.
Play the whole forty seconds three times, without stopping and without reading anything on this page.
- First pass - words. Write down every German word you catch. Three is a result. Nine is a good day.
- Second pass - one sentence. Write down one complete sentence, even if half of it is a guess.
- Third pass - check yourself. Listen again and correct what you wrote.
There is no answer key, deliberately. No transcript is printed here and you are not meant to go hunting for one. A transcript would spare you the exact thing being trained: holding unfamiliar German in your head long enough to make sense of it. The clip never changes, so the only thing that can improve between today and the last day is you.
3. Neue Bausteine - zwölf Stück
Section titled “3. Neue Bausteine - zwölf Stück”Die Reflexivpronomen
Section titled “Die Reflexivpronomen”| Person | Reflexivpronomen |
|---|---|
| ich | mich |
| du | dich |
| er / sie / es | sich |
| wir | uns |
| ihr | euch |
| sie / Sie | sich |
Four of the six are the accusative pronouns you already have from Tag 09 - mich, dich, uns, euch. The only new form is sich, which covers himself, herself, itself, themselves and yourself formal.
That means Sie and sich sit in the same sentence constantly: Freuen Sie sich? - do you look forward to it. Two different words that sound related and are not.
Wo das Pronomen steht
Section titled “Wo das Pronomen steht”Straight after the conjugated verb - which means it moves when the verb moves:
| Satztyp | Beispiel |
|---|---|
| Aussage | Ich freue mich. |
| Aussage, etwas anderes zuerst | Heute freue ich mich. |
| Ja/Nein-Frage | Freuen Sie sich? |
| W-Frage | Wie fühlen Sie sich? |
| Modalverb | Ich muss mich beeilen. |
| Perfekt | Ich habe mich gefreut. |
Die Verben, die du brauchst
Section titled “Die Verben, die du brauchst”| Verb | English | Beispiel |
|---|---|---|
| sich freuen | to look forward / be glad | Ich freue mich. |
| sich freuen auf | to look forward to | Ich freue mich auf das Wochenende. |
| sich fühlen | to feel | Ich fühle mich nicht gut. |
| sich treffen | to meet | Wir treffen uns um acht. |
| sich beeilen | to hurry | Ich muss mich beeilen. |
| sich setzen | to sit down | Setzen Sie sich, bitte. |
| sich vorstellen | to introduce oneself | Darf ich mich vorstellen? |
| sich anmelden | to register | Ich muss mich anmelden. |
| sich entschuldigen | to apologise | Ich möchte mich entschuldigen. |
| sich interessieren für | to be interested in | Ich interessiere mich für Technik. |
The last two columns matter: several of these come with a fixed preposition - sich freuen auf, sich interessieren für - and the preposition is part of the verb. Those get a full day on Tag 53.
Die zwölf Bausteine
Section titled “Die zwölf Bausteine”| Deutsch | English | Wann |
|---|---|---|
| Ich freue mich | I am glad / looking forward to it | accepting an invitation |
| Ich freue mich auf das Wochenende | I am looking forward to the weekend | auf plus accusative |
| Wie fühlen Sie sich? | how are you feeling | at the doctor’s |
| Ich fühle mich nicht gut | I do not feel well | |
| Wir treffen uns um acht | we are meeting at eight | uns for wir |
| Wo treffen wir uns? | where are we meeting | |
| Ich muss mich beeilen | I have to hurry | modal, pronoun stays early |
| Setzen Sie sich, bitte | please sit down | imperative plus sich |
| Darf ich mich vorstellen? | may I introduce myself | the formal opener |
| Ich muss mich anmelden | I have to register | the Tag 40 sentence |
| Ich möchte mich entschuldigen | I would like to apologise | more formal than Entschuldigung |
| Ich interessiere mich für Technik | I am interested in technology | für plus accusative |
4. Drills
Section titled “4. Drills”Substitutionsdrill
Section titled “Substitutionsdrill”Konversionsdrill - das Pronomen einsetzen
Section titled “Konversionsdrill - das Pronomen einsetzen”Supply the right reflexive pronoun.
Konversionsdrill - Wortstellung
Section titled “Konversionsdrill - Wortstellung”Rebuild the sentence with the element given first, or in the tense given.
Antwortdrill
Section titled “Antwortdrill”Übersetzungsdrill
Section titled “Übersetzungsdrill”5. Wiederholung
Section titled “5. Wiederholung”Yesterday, two days back, five days back, twelve days back, thirty days back. Tag 04 is the thirty-day-old one.
6. Text und Hören
Section titled “6. Text und Hören”A first day at a new place, which is almost entirely reflexive verbs.
Frau Weber: Guten Morgen! Kommen Sie rein. Setzen Sie sich, bitte. Ravi: Danke. Darf ich mich vorstellen? Mein Name ist Ravi Chaudhary. Frau Weber: Freut mich, Herr Chaudhary. Ich bin Frau Weber. Ravi: Freut mich auch. Ich muss mich anmelden, richtig? Frau Weber: Genau. Haben Sie Ihren Ausweis dabei? Ravi: Ja, hier. Entschuldigung, ich bin ein bisschen spät. Ich musste mich beeilen. Frau Weber: Kein Problem. Wie fühlen Sie sich? Sie sehen müde aus. Ravi: Ich fühle mich gut, danke. Nur ein langer Weg. Frau Weber: Verstehe. Und wofür interessieren Sie sich? Ravi: Ich interessiere mich für Technik und für Logistik. Frau Weber: Sehr gut. Wir treffen uns dann nächste Woche noch einmal. Ravi: Gern. Wann treffen wir uns? Frau Weber: Am Dienstag um zehn. Passt Ihnen das? Ravi: Das passt mir gut. Ich freue mich.
Freut mich is the standard pleased to meet you - literally it gladdens me, with the es left out. wofür is what for, in what, and der Weg here means the journey.
Read it aloud twice, both parts. Then cover Ravi’s lines and run a first meeting of your own - it is the single most predictable conversation you will have in a new country.
7. Bidirektional - zurück ins Englische
Section titled “7. Bidirektional - zurück ins Englische”The eight sentences you translated into German on Tag 32, coming back the other way. Do not look them up first.
8. Sprechen - zehn Minuten
Section titled “8. Sprechen - zehn Minuten”A first meeting, run three times. Stand up.
Du bist Frau Weber, eine Sachbearbeiterin in einem Büro in Hamburg.Ich bin Lernender (Tag 34). Heute übe ich reflexive Verben.
Wir spielen dreimal ein erstes Treffen - drei verschiedene Büros, dreiverschiedene Gründe (anmelden, einen Kurs buchen, einen Termin machen).
Benutze jedes Mal: Setzen Sie sich bitte. Wie fühlen Sie sich? Wofürinteressieren Sie sich? Wann treffen wir uns? Freuen Sie sich auf denKurs?
Ich muss mich jedes Mal vorstellen, mich entschuldigen (ich bin zu spät),und sagen, wofür ich mich interessiere.
Sprich langsam, maximal neun Wörter pro Satz. Wenn ich dasReflexivpronomen vergesse - "Ich freue" statt "Ich freue mich" -wiederhole meinen Satz einfach richtig, ohne Erklärung. Fang jetzt an.9. Auf Papier - zweite Destillation
Section titled “9. Auf Papier - zweite Destillation”Diktat. Ten-second loop on the shadowing audio. Write six German words by hand without pausing, then correct in a second colour.
Satz des Tages. Write out by hand, from memory, a complete first meeting in eight lines - greet, introduce yourself formally, apologise for being late, say how you feel, say what you are interested in, agree a time to meet again, and say you are looking forward to it. Eight lines, every reflexive pronoun circled.
Die Reflexivliste. Write the ten verbs from section 3 by hand, always with sich in front - sich freuen, sich fühlen, sich treffen - the way a dictionary lists them. Then write the pronoun table beside it. This is a list to extend for the rest of the course: whenever you meet a new reflexive verb, it goes here.
Fehlerliste. Week-five page. Every item the drills marked wrong today, in German only. Every dropped pronoun gets the full sentence written twice.
Genus-Farben. Three new nouns: blue der Urlaub, der Weg; red die Technik, die Musik.
Goldlist 2 - zweite Destillation.
Goldlist 2 went into the notebook on Tag 06, was distilled once on Tag 20, and comes back today.
-
Find the Tag 20 page - the distillation, not the original.
-
Read it once, aloud, slowly. No testing, no covering.
-
Cross out everything you now know.
-
Copy what is left onto a fresh page, headed Goldlist 2 - Destillation 2 with today’s date.
-
Close the notebook and walk away.
-
Write in your calendar, 14 days from today: Goldlist 2 - dritte Destillation - that is Tag 48.
Weiter: Tag 35 - Die du-Form - duzen und siezen, die du-Konjugation, und wann man wechselt. Abschluss von Woche fünf.