Skip to content

Tag 13 - Dativpronomen

Tag 13 von 60 - mir, dir, ihm, ihr, Ihnen, und die Verben mit Dativ. Zwei Stunden.


Yesterday’s table had a dative pronoun column you were told to ignore. Today it is the lesson, and it closes the case system for A1 - after this page there is no new case form to learn, only practice.

The reason this day matters more than it looks: a small group of very common German verbs take their object in the dative rather than the accusative, and there is no way to predict which from the meaning. Ich sehe **ihn** but Ich helfe **ihm**. Both are I [verb] him in English. Germans do not hear these as the same shape at all, and getting them wrong is the mistake that most reliably marks a sentence as foreign even when every word is right.

And one sentence you have used thirty times finally comes apart: Wie geht es Ihnen? It is not how are you. Literally it is how goes it to you - es is the subject, Ihnen is dative, and you have been producing a dative pronoun since Tag 02.

Review day, so this is two weeks mixed, cold.

Und dann Hören, fünf Minuten. Same clip, different job, and this is the half that self-study usually skips.

Play the whole forty seconds three times, without stopping and without reading anything on this page.

  1. First pass - words. Write down every German word you catch. Three is a result. Nine is a good day.
  2. Second pass - one sentence. Write down one complete sentence, even if half of it is a guess.
  3. Third pass - check yourself. Listen again and correct what you wrote.

There is no answer key, deliberately. No transcript is printed here and you are not meant to go hunting for one. A transcript would spare you the exact thing being trained: holding unfamiliar German in your head long enough to make sense of it. The clip never changes, so the only thing that can improve between today and the last day is you.

The third and last pronoun column:

NominativAkkusativDativEnglish dative
ichmichmirto me
dudichdirto you
erihnihmto him
siesieihrto her
esesihmto it
wirunsunsto us
ihreucheuchto you
sie / Siesie / Sieihnen / Ihnento them / to you

Three of them are new and worth drilling on their own: mir, ihm, ihr. Three you already have for free, because they are identical to the accusative: uns, euch, and - the useful one - Ihnen.

A short list, and it covers almost everything you need at A1. These verbs take their object in the dative, always:

VerbEnglishBeispiel
helfento helpKönnen Sie mir helfen?
dankento thankIch danke Ihnen.
antwortento answerIch antworte ihm.
gehörento belong toDas gehört mir.
passento suit / fitDas passt mir gut.
gefallento pleaseHamburg gefällt mir.
schmeckento tasteDer Kaffee schmeckt mir.

Können Sie mir helfen? is the most useful sentence on this page and probably the most useful sentence of week two. Learn it before anything else.

These two work backwards compared to English, and this is the part that needs real attention.

In English I like Hamburg makes I the subject. In German the thing being liked is the subject and the person doing the liking goes in the dative:

EnglishDeutschWörtlich
I like HamburgHamburg gefällt mirHamburg pleases to-me
I like the coffeeDer Kaffee schmeckt mirthe coffee tastes to-me
Do you like it?Gefällt es Ihnen?does it please to-you
He likes the cityDie Stadt gefällt ihmthe city pleases to-him

Two consequences you have to watch:

  • The verb agrees with the thing, not the person. Hamburg gefällt mir but Die Städte gefallen mir.
  • schmecken is only for food and drink. gefallen is for everything else.

You already have a way around all of this from Tag 09 - Ich finde es gut - and it is completely correct German. Keep using it. But Gefällt es Ihnen? is what a German will actually ask you, so you need to recognise it even on the days you cannot produce it.

DeutschEnglishWann
Können Sie mir helfen?can you help methe sentence of the day
Ich helfe Ihnen gernI am glad to help youthe answer to it
Ich danke Ihnenthank you (formal, full)more formal than danke
Das gehört mirthat belongs to me
Das passt mir gutthat suits me finefor arranging a time
Wie gefällt es Ihnen?how do you like itthe question you will be asked
Hamburg gefällt mirI like Hamburgthe thing is the subject
Es gefällt mir sehrI like it very much
Der Kaffee schmeckt mirI like the coffeefood and drink only
Können Sie mir das zeigen?can you show me thatdative person, accusative thing
Geben Sie mir bitte die Rechnungplease give me the billsame shape
Es tut mir leidI am sorryfixed phrase, dative inside

Replace the pronoun and say the whole sentence.

Turn the accusative pronoun into the dative one, or the other way round. This is the collision drill.

Yesterday, two days back, five days back. Tag 08 is the five-day-old one, which puts the accusative next to today’s dative on purpose.

Lost at the station, which is where Können Sie mir helfen? earns its place.

Ravi: Entschuldigung, können Sie mir helfen? Mann: Ja, natürlich. Was suchen Sie? Ravi: Ich suche den Zug nach Berlin. Können Sie mir das zeigen? Mann: Gern. Gleis vier. Der Zug fährt um zehn Uhr. Ravi: Wie bitte? Noch einmal, bitte. Mann: Gleis vier. Um zehn Uhr. Ravi: Danke, ich danke Ihnen! Gefällt es Ihnen hier in Hamburg? Mann: Ja, sehr. Und Ihnen? Ravi: Es gefällt mir auch sehr. Ich bin seit einem Monat hier. Mann: Und schmeckt Ihnen der Kaffee am Bahnhof? Ravi: Nein! Der Kaffee schmeckt mir nicht. Mann: Mir auch nicht. Gute Reise!

das Gleis is the platform, um zehn Uhr is at ten o’clock - a first glance at times, which get their own day on Tag 17 - and Gute Reise is have a good journey. Mir auch nicht is worth stealing: me neither, built from nothing but a dative pronoun.

Read it aloud twice, both parts, with the reduced endings and the vowel-r. Then cover Ravi’s lines and produce them from the man’s cues.

The eight sentences you translated into German on Tag 11, coming back the other way. Do not look them up first.

Asking for help, over and over, until it stops needing thought. Stand up.

Du bist eine hilfsbereite Person am Bahnhof in Hamburg. Ich bin Anfänger
(Tag 13, A1). Heute übe ich die Dativpronomen mir, Ihnen, ihm, ihr und
die Verben helfen, danken, gefallen, schmecken, gehören.
Sprich langsam, maximal sieben Wörter pro Satz. Frag mich mehrmals:
Wie gefällt es Ihnen in Hamburg? Schmeckt Ihnen der Kaffee? Gehört das
Ihnen? Kann ich Ihnen helfen? Passt Ihnen zehn Uhr?
Wenn ich "mich" statt "mir" sage, oder "ihn" statt "ihm", wiederhole
meinen Satz einfach richtig, ohne Erklärung, und mach weiter. Korrigiere
nichts anderes. Fang jetzt an.

Diktat. Ten-second loop on the shadowing audio. Write six German words by hand without pausing, then correct in a second colour.

Satz des Tages. Write out by hand, from memory, six sentences you would need if you were lost: ask for help, say what you are looking for, ask them to show you, ask them to repeat, thank them formally, and apologise for your German. Six lines. Check against section 3.

Die Pronomen-Tabelle, dritte Spalte. Take the pronoun table you drew on Tag 09 and add the dative column, so one page now carries all three. Put mir, ihm and ihr in a different colour - those are the three new forms and they are the only ones worth the ink.

Der ihm-ihr-Durchgang. Go down your whole colour list and say each noun with its dative pronoun: blue takes ihm, red takes ihr, green takes ihm. Then write out by hand just the red ones with ihr, because feminine dative is the form that will decay first.

Fehlerliste. Week-three page, started yesterday. Every item the drills marked wrong today, in German only, correct form. Any mir/mich confusion gets written twice.

Genus-Farben. Two new nouns, both green: das Gleis and das Auto. If you assumed a railway platform would be der, that is exactly what the colour list is for - there is no reasoning available, only the list.

Goldlist. Not today. Goldlist 4 went in yesterday with its date. The next page is Tag 15.


Weiter: Tag 14 - Trennbare Verben - die Verben, die auseinanderbrechen, der Tagesablauf, und der Abschluss von Woche zwei.