Skip to content

Tag 35 - Die du-Form

Tag 35 von 60 - duzen und siezen, die du-Konjugation, und wer den Wechsel anbietet. Zwei Stunden.


Thirty-four days of Sie, which was the right decision - with strangers, officials, shopkeepers and anyone older, Sie is correct and you can live in Germany for years using nothing else.

But you cannot understand Germany with nothing else, because a large part of daily life runs on du: colleagues of your own age, fellow students, anyone at a sports club, friends of friends, almost everyone under about thirty, and - immediately and without discussion - children.

So today has two halves. The grammar of du, which is small, and the social rule for when to use it, which is the part that actually matters and which no conjugation table will tell you.

Reflexive verbs, cold.

Und dann Hören, fünf Minuten. Same clip, different job, and this is the half that self-study usually skips.

Play the whole forty seconds three times, without stopping and without reading anything on this page.

  1. First pass - words. Write down every German word you catch. Three is a result. Nine is a good day.
  2. Second pass - one sentence. Write down one complete sentence, even if half of it is a guess.
  3. Third pass - check yourself. Listen again and correct what you wrote.

There is no answer key, deliberately. No transcript is printed here and you are not meant to go hunting for one. A transcript would spare you the exact thing being trained: holding unfamiliar German in your head long enough to make sense of it. The clip never changes, so the only thing that can improve between today and the last day is you.

The social rule first, because it decides whether the grammar is any use.

Immer duImmer SieEs kommt darauf an
KinderFremde auf der StraßeKollegen
FamilieBehörden und ÄmterNachbarn
FreundeÄrzte, Lehrer, ChefsLeute im Kurs
KommilitonenVerkäufer, KellnerFreunde von Freunden
im Sportvereinältere Menschen

The ending is -st:

Verbdu-Form
wohnendu wohnst
kommendu kommst
lernendu lernst
machendu machst
arbeitendu arbeitest

arbeiten takes an extra e for the same reason the participle did on Tag 19 - the stem ends in t and arbeitst is unsayable.

The ones you will use most are the ones that change:

Verbdu-FormWas passiert
seindu bistcompletely irregular
habendu hastloses the b
fahrendu fährsta becomes ä
nehmendu nimmste becomes i
sprechendu sprichste becomes i
essendu isste becomes i
lesendu lieste becomes ie
sehendu siehste becomes ie

These are the same vowel changes as the er/sie/es forms you learned to recognise on Tag 12 - er fährt, er nimmt. The du and er forms change together, which halves the work: if you know er spricht, then du sprichst follows.

Verbdu-Form
könnendu kannst
müssendu musst
wollendu willst
dürfendu darfst
sollendu sollst
möchtendu möchtest

Bare stem, no ending, no pronoun:

Sie-Formdu-Form
Kommen Sie!Komm!
Gehen Sie!Geh!
Warten Sie!Warte!
Nehmen Sie!Nimm!
Sprechen Sie!Sprich!
Fahren Sie!Fahr!
Setzen Sie sich!Setz dich!

Verbs with an e → i change keep it: Nimm!, Sprich!. Verbs with an a → ä change lose it: Fahr!, not Fähr.

FallForm
Nominativdu
Akkusativdich
Dativdir
Possessivdein / deine

All three you have met - dich on Tag 09, dir on Tag 13, dein on Tag 21 - in tables you were told to recognise rather than use. Today they go live.

DeutschEnglishWann
Wollen wir uns duzen?shall we use duthe offer
Gern! Ich bin Ravigladly, I am Ravithe acceptance
Wie heißt du?what is your namedu version of Tag 01
Woher kommst du?where do you come from
Wo wohnst du?where do you live
Was machst du?what do you do
Hast du Zeit?do you have timedu hast
Kannst du mir helfen?can you help medu kannst plus dative
Wie geht es dir?how are youdir, not Ihnen
Komm mit!come alongdu imperative
Ich rufe dich anI will call youdich
Das ist dein Buchthat is your bookdein

The core drill. Rebuild each sentence informally.

The social drill, and the more important of the two.

Yesterday, two days back, five days back, twelve days back, thirty days back. Tag 05 is the thirty-day-old one - the present tense, which the du form now extends.

The switch happening in real time, which is the thing to recognise.

Thomas: Guten Tag, Herr Chaudhary. Setzen Sie sich. Ravi: Danke. Guten Tag, Herr Weber. Thomas: Sie machen den MBA an der TUHH, richtig? Wie gefällt es Ihnen? Ravi: Sehr gut. Es ist viel Arbeit, aber interessant. Thomas: Das glaube ich. Übrigens - wir sind hier alle ungefähr gleich alt. Wollen wir uns duzen? Ravi: Gern! Ich bin Ravi. Thomas: Und ich bin der Thomas. Also, Ravi - woher kommst du? Ravi: Ich komme aus Indien. Und du? Kommst du aus Hamburg? Thomas: Nein, ich bin aus München. Ich wohne seit acht Jahren hier. Ravi: Und wie gefällt dir Hamburg? Thomas: Sehr gut. Aber im Winter ist es zu dunkel. Hast du am Freitag Zeit? Ravi: Ja, am Freitag kann ich. Was machst du am Freitag? Thomas: Wir treffen uns im Café am Hafen. Komm mit! Ravi: Gern. Ruf mich an, ja? Oder schreib mir. Thomas: Mache ich. Freut mich, Ravi!

der Hafen is the harbour, schreib mir is write to me - du imperative plus dative. All free.

Read the whole thing twice and notice exactly where the register changes: Thomas makes the offer, Ravi accepts, and from that line onward nobody uses Sie again. That is how it works every time. Then cover Ravi’s lines and run it yourself - including the acceptance, which is the single most useful line on the page.

Into German today. On Tag 37 you will translate these back the other way.

The first ten minutes of this course conducted entirely in du. Stand up.

Du bist Thomas, ein Kollege in meinem Alter in Hamburg. Ich bin Lernender
(Tag 35). Heute übe ich die du-Form.
Erster Teil, zwei Minuten: Wir sprechen uns mit Sie an. Dann biete mir
das Duzen an ("Wollen wir uns duzen?") und ich nehme an.
Zweiter Teil, acht Minuten: Ab da NUR du. Stelle mir alle normalen Fragen
in der du-Form: Wie heißt du? Woher kommst du? Wo wohnst du? Was machst
du? Hast du Geschwister? Wie gefällt dir Hamburg? Was machst du am
Wochenende? Hast du am Freitag Zeit? Fährst du mit dem Bus?
Benutze auch zwei du-Imperative: Komm mit! Ruf mich an!
Wenn ich aus Gewohnheit "Sie" sage, wiederhole meine Frage einfach in der
du-Form, ohne Erklärung. Fang jetzt an.

Diktat. Ten-second loop on the shadowing audio. Write six German words by hand without pausing, then correct in a second colour.

Satz des Tages. Write out by hand, from memory, your twelve standard questions - the ones from Tag 12’s self-portrait - in the du form. Twelve lines. You have been writing the Sie versions for five weeks; writing them again informally is the fastest way to make the second set available.

Die du-Tabelle. One page by hand: the regular -st ending, the eight irregular forms, the six modal verbs, the imperative rule, and dich / dir / dein. Then write underneath in capitals:

WARTEN, BIS ES ANGEBOTEN WIRD. DANN SOFORT ANNEHMEN UND NIE ZURÜCK.

Fehlerliste. Week-five page. Every item the drills marked wrong today. Then draw a line under it and start a fresh page for week six - the week-five page comes back on Tag 42.

Genus-Farben. Two new nouns: blue der Hafen, der Verein.

Goldlist 7 - Destillation.

Fourteen days ago, on Tag 21, you wrote twenty-five items and closed the notebook.

  1. Read the page once, aloud, slowly. No testing, no covering, no scoring.

  2. Cross out everything you know.

  3. Count what is left and write the number at the bottom.

  4. Copy the survivors onto a fresh page, renumbered, headed Goldlist 7 - Destillation 1 with today’s date.

  5. Close the notebook and walk away.

  6. Write in your calendar, 14 days from today: Goldlist 7 - zweite Destillation - that is Tag 49.

Thirty-five days. What week five added:

TagThemaNeue Bausteine
29das Präteritum von sein, haben und den Modalverben12
30Wiederholungstag - Halbzeit0
31Adjektivendungen nach der, die, das12
32Adjektivendungen nach ein, kein, mein12
33Adjektive ohne Artikel, Farben, Menschen beschreiben12
34reflexive Verben12
35die du-Form, duzen und siezen12
Summe Woche 572
Gesamt360

Three hundred and sixty chunks. Week five was the densest grammar week of the course - the complete adjective system in three days, a second past tense, the reflexive verbs and a whole second register.

What you can do now that you could not on Tag 28: describe things and people rather than only naming them, say what you were and had without the clumsy Perfekt, accept an offer to switch to du and then keep up, and - quietly important - introduce yourself formally in the way a German expects at a first meeting.


Woche 5 ist fertig. Zurück zur Übersicht - Woche 6 bringt den Genitiv und die Sprache der Institutionen: Arzt, Apotheke, Bank und Anmeldung. Sie wird gebaut, sobald diese fünf Wochen einmal wirklich durchgearbeitet sind.