Production, not recognition
No multiple choice anywhere. Multiple choice lets you coast on recognising the right answer, which is a much weaker memory than pulling it out of nothing. Everything here is typed, written by hand, or said aloud.
Dieser Inhalt ist noch nicht in deiner Sprache verfügbar.
Selbststudium Deutsch - von den ersten Wörtern bis B1. Ein Tag, eine Seite, zwei Stunden.
One day, one page, two hours. A hundred and twenty of them runs from the first words of German to B1 - the level of the integration course, the usual language requirement for naturalisation, and the point at which an employer treats German as a working language rather than a project.
This page is the method. The course itself is in four modules, and the map is further down.
Every page is a full session: warm up, sounds, new material, drills, scheduled review, listening, translation, speaking, and a block to copy into a paper notebook. The work is typed or spoken, never clicked from a list, because recognising an answer is not the same as producing one.
Aufwärmen, 5 min. Ten items from yesterday, typed cold.
Aussprache und Hören, 15 min. Days 1 to 10 cover the sounds - vowels, umlauts, diphthongs, the consonants that trip up English speakers - and after day 10 the slot becomes shadowing. Every page has its own forty-second clip of real German: ten minutes shadowing it half a second behind, then five minutes listening to it cold and writing down what you caught. There is no transcript on any page, deliberately.
Neue Bausteine, 20 min. Twelve new chunks, each with exactly one unknown element, recalled three times at widening gaps inside the page.
Drills, 25 min. Four drill types borrowed from the old Foreign Service method: substitution, conversion, response, translation. Roughly sixty prompts.
Wiederholung, 20 min. The scheduled review - yesterday, two days back, five days back, and later twelve and thirty.
Text und Hören, 12 min. A short dialogue built only from chunks I already know, read while listening, then heard again without the text.
Bidirektional, 8 min. Eight sentences translated one way today and back the other way two days later, then compared against the model. The gap between my version and the model is the actual lesson.
Sprechen, 10 min. A ready-made roleplay prompt to paste into a voice AI, tuned to the day’s grammar.
Auf Papier, 10 min. Dictation by hand, five sentences about my real day, and the errors the drills caught. Every third day, a Goldlist page.
Production, not recognition
No multiple choice anywhere. Multiple choice lets you coast on recognising the right answer, which is a much weaker memory than pulling it out of nothing. Everything here is typed, written by hand, or said aloud.
Chunks, never bare words
A word learned alone has to be assembled into a sentence under time pressure later. A chunk arrives with its grammar attached. Every item here is a usable fragment of speech.
Spacing built into the calendar
Graduated interval recall works on a fixed, known curve, so it can be baked into which page re-drills what. No app required, and no data about me stored anywhere.
Paper does a different job
Handwriting appears to recruit motor, visual and spatial systems that typing bypasses, which suits encoding new forms - spelling, umlauts, noun gender. Typing is better for volume. Both are used, for different jobs.
Never miss twice. One day off is noise. Two is how streaks die.
Produce from memory on paper. Copying German off the screen into the notebook feels productive and teaches nearly nothing. Written blind, then checked.
Say every answer out loud, even the typed ones. Silent German does not become spoken German.
Speak badly on purpose. The ten minutes with a voice AI are for making errors at speed, not for composing perfect sentences.
Sunday is review only. Every sixth day adds no new material.
A hundred and twenty days, one continuous day count, split by level. The first sixty are built - A1 and A2 are complete.
A1 - Start German
Tag 01 bis 28. Built. From nothing to your first real conversations: the sounds, greetings, sein and haben, the three genders, the present tense, the Akkusativ and Dativ, the Modalverben, the Perfekt, and asking for what you need. Closes with an A1 self-assessment.
A2 - Deeper German
Tag 29 bis 60. Complete. Living an actual German life: the Präteritum, the whole adjective ending system, the du form, the doctor and the bank and the Amt, the flat hunt, the telephone, the application and the interview, then relative clauses and the Konjunktiv II.
B1 - On Your Own
Tag 61 bis 120. Planned, syllabus published. The level that counts: the Passiv, the Plusquamperfekt, the past Konjunktiv II, Nominalisierung, indirekte Rede, and nine themes from work and health to climate and politics - plus the Goethe B1 exam, all four parts.
B2 and beyond
Not planned yet, and deliberately so. B2 is not a harder version of B1; it is reading and arguing about things you do not already know, and that needs a different kind of page from these. The honest route from B1 is a classroom and a job, not another sixty drill pages.
The situations and the drill types come from United States government courses that are in the public domain: the Foreign Service Institute’s German Basic Course, Programmed Introduction and German FAST, and the Defense Language Institute’s German Headstart. All the audio comes from the same place, for the same reason.
Each day’s clip is a forty-second byte range of whole audio frames copied straight out of the original tape - nothing re-encoded, nothing re-recorded, so what you hear is the recording as it was made. Every clip is credited to its source file and offset. Two honest consequences: the German is studio German from the middle of the twentieth century, read slowly and clearly, which is excellent for shadowing and nothing like a radio presenter; and because the clips are cut mechanically rather than hand-picked, a few of them catch the original course’s English narration. That is a property of the source, not a mistake - and if a clip is mostly English, any other day’s clip will do.
Every German sentence on these pages is written for this site, not copied - they are about Hamburg, an MBA, and the work I actually do. Word ordering leans on the Leipzig Wortschatz frequency data, which is CC-BY licensed.
Three kinds of copyrighted material sit on my desk while I write and appear nowhere on the site. Grammars - Hammer’s German Grammar, EasyDeutsch - are used privately to check that my explanations are correct. Course books - the Netzwerk neu series - are used to check that my coverage has no holes; their texts and exercises are not reproduced. Exam material is the delicate one: the Goethe and telc exam formats are published facts and I describe them, but no practice item from any Prüfungstraining book is reproduced, and the Goethe Wortlisten are used only as a checklist against my own coverage, never as content.