Zum Inhalt springen

B1 - On Your Own

Dieser Inhalt ist noch nicht in deiner Sprache verfügbar.

B1 - Auf eigenen Füßen. Tag 61 bis Tag 120. Neun Wochen.


The level that counts.

B1 is where German stops being something you are learning and becomes something you have. It is the level of the Integrationskurs, the usual language requirement for naturalisation, and the point at which an employer treats your German as a working language rather than a project.

It is also the first level where the grammar is no longer the hard part. A2 finished the structures a speaker needs; B1 adds the structures a reader and writer needs - the passive, the past subjunctive, nominalisation - and then spends most of its time on something else entirely: having opinions about things, in German, at length.

Worth stating before the table, because B1 is where self-study courses quietly overpromise.

  1. A1 plus A2 is roughly 180 to 200 hours of study from zero, for most learners, in most settings.

  2. B1 is roughly 350 to 400 hours in total - so another 150 to 200 hours on top.

  3. This course is 120 days at two hours, which is 240 hours, of which 120 are these sixty B1 pages.

  4. That is short of the range, and the gap is closed by exactly two things that are not pages: hours of German audio, and hours of talking to people. Every week below has both built into it, and they are not optional extras - they are where the missing hours live.

Each week keeps the same nine-block page as A1 and A2, and the three timed schedules run on unbroken - review at N-1, N-2, N-5, N-12 and N-30, the bidirectional chain at N to N+2, and the Goldlist cycle keyed to the day number.

Woche 10 - Tag 61 bis 67

Das Passiv. Präsens, Präteritum and Perfekt passive, the passive with modal verbs, werden against sein (Vorgangs- and Zustandspassiv), and the man construction that German often prefers to either.

Thema: Arbeit und Beruf - the workplace, meetings, processes, instructions.

Woche 11 - Tag 68 bis 74

Das Plusquamperfekt, and the conjunctions that need it: nachdem, bevor, sobald, seitdem, während, bis. Sequencing two past events correctly, which A2 could only do with dann.

Thema: Ausbildung und Studium - qualifications, recognition of foreign degrees, applications.

Woche 12 - Tag 75 bis 81

Purpose and concession. damit and um ... zu and the rule for choosing between them, so dass, falls, sofern, obwohl against trotzdem against trotz.

Thema: Gesundheit - the body in detail, prevention, insurance, a specialist appointment.

Woche 13 - Tag 82 bis 88

Konjunktiv II in the past. hätte gemacht, wäre gegangen, hätte machen können - unreal conditions about things that are already over, regrets, reproaches, and the politest refusals German has.

Thema: Umwelt und Klima - the single most common B1 exam topic, and unavoidable in Germany.

Woche 14 - Tag 89 bis 95

Nominalisierung and Verbalisierung - turning weil es regnet into wegen des Regens and back, which is the one skill that separates B1 writing from A2 writing. Plus the genitive prepositions (aufgrund, innerhalb, außerhalb, während, trotz) and the n-Deklination.

Thema: Medien und Internet - news, platforms, privacy, screen time.

Woche 15 - Tag 96 bis 102

Two-part connectors - je ... desto, entweder ... oder, weder ... noch, sowohl ... als auch, nicht nur ... sondern auch - and Partizip I and II used as adjectives (die steigenden Preise, die renovierte Wohnung).

Thema: Wohnen und Zusammenleben - neighbours, the Hausordnung, shared flats, conflict.

Woche 16 - Tag 103 bis 109

Reported speech. indirekte Rede with and without dass, Konjunktiv I to recognise rather than produce, the subjective modal verbs (Er soll krank sein, Das muss teuer gewesen sein), and the Nomen-Verb-Verbindungen that German news runs on - eine Entscheidung treffen, in Frage kommen, zur Verfügung stehen.

Thema: Politik, Gesellschaft und Ehrenamt - how Germany is governed, volunteering, and having an opinion about both.

Woche 17 - Tag 110 bis 116

Wortbildung - the prefixes and suffixes that let you guess a word you have never seen (-ung, -keit, -heit, -bar, -los, un-, ver-, be-, ent-) - plus a second pass at verbs with fixed prepositions, and a Redemittel bank for each of the four exam parts.

Thema: Geld, Konsum und Reisen - contracts, cancellations, complaints, bookings.

Woche 18 - Tag 117 bis 120

Four close-out days. A full mock of Lesen und Hören under exam conditions, a full mock of Schreiben und Sprechen, the B1 self-assessment against the descriptors, and a last page that reads back the story written on Tag 55 and sets the plan for what comes after the course.

Three exams matter in Germany and they test the same level in slightly different shapes. The formats are published by the examining bodies; what follows is a description of them, not material from them.

PrüfungWofürBesonderheit
Goethe-Zertifikat B1the general-purpose proof, recognised everywherethe four parts can be taken and passed separately, which is unusually forgiving
telc Deutsch B1equally recognised, common at adult education centresone sitting, slightly different task types
DTZ - Deutsch-Test für Zuwandererthe test at the end of the Integrationskursscored across B1 and A2, so it reports which level you actually reached

All three are built from four parts - Lesen, Hören, Schreiben, Sprechen - and the last two are where self-taught candidates lose marks, because both are judged on things a drill page cannot rehearse: whether your letter has the right register, and whether you can plan something out loud with a stranger.

Weeks 17 and 18 are built around exactly those two.


Zurück: A2 - Deeper German - Tag 29 bis 60, der Alltag auf Deutsch. Oder zur Methode - die neun Blöcke und die drei Zeitpläne.