Tag 51 - Relativsätze
Dieser Inhalt ist noch nicht in deiner Sprache verfügbar.
Tag 51 von 60 - der Mann, der angerufen hat. Zwei Stunden.
Relative clauses have a reputation, and it is undeserved. The whole thing rests on two facts you already own:
- The relative pronoun is the definite article.
der,die,das,den,dem- the same table you drew from memory on Tag 42. There are exactly three exceptions. - The verb goes to the end, exactly as after
weil,dassandwenn.
What is new is only this: you have to pick the pronoun by asking two questions instead of one. Today is that, drilled until it is reflexive.
1. Aufwärmen - zehn Stück aus Tag 50
Section titled “1. Aufwärmen - zehn Stück aus Tag 50”The subordinate clauses, cold.
2. Shadowing - zehn Minuten
Section titled “2. Shadowing - zehn Minuten”Und dann Hören, fünf Minuten. Same clip, different job, and this is the half that self-study usually skips.
Play the whole forty seconds three times, without stopping and without reading anything on this page.
- First pass - words. Write down every German word you catch. Three is a result. Nine is a good day.
- Second pass - one sentence. Write down one complete sentence, even if half of it is a guess.
- Third pass - check yourself. Listen again and correct what you wrote.
There is no answer key, deliberately. No transcript is printed here and you are not meant to go hunting for one. A transcript would spare you the exact thing being trained: holding unfamiliar German in your head long enough to make sense of it. The clip never changes, so the only thing that can improve between today and the last day is you.
3. Neue Bausteine - der Relativsatz
Section titled “3. Neue Bausteine - der Relativsatz”Die Tabelle - fast der bestimmte Artikel
Section titled “Die Tabelle - fast der bestimmte Artikel”| maskulin | neutrum | feminin | Plural | |
|---|---|---|---|---|
| Nominativ | der | das | die | die |
| Akkusativ | den | das | die | die |
| Dativ | dem | dem | der | denen |
| Genitiv | dessen | dessen | deren | deren |
Compare that with the article table from Tag 42. It is identical except for three forms: denen in the dative plural, and dessen / deren in the genitive. Everything else you already know cold.
At A2 you will use the top two rows almost exclusively. Learn denen because it comes up; recognise dessen and deren and leave them alone for now.
Die zwei Fragen
Section titled “Die zwei Fragen”Picking the pronoun takes two questions, in this order:
1. What is it referring to? That gives you gender and number - masculine, neuter, feminine or plural.
2. What job does it do inside the relative clause? That gives you the case.
Worked three times:
| Satz | Bezug | Rolle im Relativsatz | Pronomen |
|---|---|---|---|
| Der Mann, der angerufen hat, … | der Mann, masculine | subject - he called | der (Nominativ) |
| Der Mann, den ich gesehen habe, … | der Mann, masculine | object - I saw him | den (Akkusativ) |
| Der Mann, dem ich geholfen habe, … | der Mann, masculine | dative - I helped him | dem (Dativ) |
Same man, three different pronouns, and the only thing that changed is what he does inside the clause. That is the whole lesson.
Mit Präposition
Section titled “Mit Präposition”When the relative pronoun follows a preposition, the preposition decides the case - exactly as it always has:
| Deutsch | English |
|---|---|
| die Firma, bei der ich arbeite | the company I work for |
| der Mann, mit dem ich gesprochen habe | the man I spoke to |
| der Arzt, zu dem ich gehe | the doctor I go to |
| die Leute, mit denen ich arbeite | the people I work with |
| das Formular, auf dem die Nummer steht | the form the number is on |
Note the German order: preposition first, pronoun second. German cannot do the English thing of leaving the preposition dangling at the end - the man I spoke to has to become der Mann, **mit dem** ich gesprochen habe.
was und wo
Section titled “was und wo”Two shortcuts that save you a pronoun decision:
| Deutsch | English | Wofür |
|---|---|---|
| Das ist das Beste, was ich machen kann. | that is the best I can do | after alles, nichts, etwas, das Beste |
| Alles, was ich brauche, ist ein Termin. | all I need is an appointment | |
| Er kam zu spät, was mich geärgert hat. | he came late, which annoyed me | referring to the whole clause |
| die Stadt, wo ich wohne | the city where I live | places |
| das Büro, wo ich arbeite | the office where I work | places |
wo is the easy way out for places: die Stadt, **in der** ich wohne is the fuller form and die Stadt, **wo** ich wohne means the same thing and is entirely normal spoken German.
Die zwölf Bausteine
Section titled “Die zwölf Bausteine”| Deutsch | English | Fall |
|---|---|---|
| Der Mann, der angerufen hat, war von der Verwaltung | the man who called was from the management | Nom |
| Die Wohnung, die ich gesehen habe, ist zu teuer | the flat I saw is too expensive | Akk |
| Das Formular, das ich brauche, ist online | the form I need is online | Akk |
| Die Leute, die hier arbeiten, sind freundlich | the people who work here are friendly | Nom Pl |
| Der Termin, den ich habe, ist am Montag | the appointment I have is on Monday | Akk |
| Der Kollege, dem ich geholfen habe, heißt Jonas | the colleague I helped is called Jonas | Dat |
| Die Firma, bei der ich arbeite, ist in Hamburg | the company I work for is in Hamburg | Dat mit Präposition |
| Ist das die Frau, mit der Sie gesprochen haben? | is that the woman you spoke to | Dat mit Präposition |
| Das ist der Arzt, zu dem ich gehe | that is the doctor I go to | Dat mit Präposition |
| Die Stadt, wo ich wohne, ist Hamburg | the city where I live is Hamburg | wo |
| Alles, was ich brauche, ist ein Termin | all I need is an appointment | was |
| Das ist das Beste, was ich machen kann | that is the best I can do | was |
4. Drills
Section titled “4. Drills”Der Pronomendrill
Section titled “Der Pronomendrill”Gender from the noun, case from the role. Give the pronoun only.
Verbindungsdrill - zwei Sätze werden einer
Section titled “Verbindungsdrill - zwei Sätze werden einer”Join them with a relative clause. The second sentence goes inside the first.
Substitutionsdrill - derselbe Satz, anderer Fall
Section titled “Substitutionsdrill - derselbe Satz, anderer Fall”Antwortdrill
Section titled “Antwortdrill”Answer with a relative clause. Full sentences, out loud.
Übersetzungsdrill
Section titled “Übersetzungsdrill”5. Wiederholung
Section titled “5. Wiederholung”Yesterday, two days back, five days back, twelve days back, thirty days back. Tag 21 is the thirty-day-old one - the possessive articles.
6. Text und Hören
Section titled “6. Text und Hören”A voicemail and a reply, and relative clauses are how both of them stay short.
Anrufbeantworter, Dienstag 9.12 Uhr
Guten Tag, Herr Chaudhary. Hier ist Weber von der Nordenergie GmbH - wir haben letzte Woche das Gespräch geführt.
Ich habe gute Nachrichten. Die Stelle, über die wir gesprochen haben, können wir Ihnen anbieten. Der Vertrag, den ich Ihnen schicke, ist unbefristet, Vollzeit, mit sechs Monaten Probezeit.
Der Kollege, der Ihre Einarbeitung macht, heißt Jonas Prieß. Er ist der Projektleiter, dem Sie direkt berichten.
Rufen Sie mich bitte zurück, wenn Sie den Vertrag gelesen haben. Alles, was wir brauchen, ist Ihre Unterschrift und ein Starttermin. Auf Wiederhören.
Deine Antwort, per E-Mail, vier Zeilen
Betreff: Vertrag - Rückmeldung und Starttermin
Sehr geehrte Frau Weber,
vielen Dank für Ihren Anruf und für das Angebot. Ich habe den Vertrag, den Sie mir geschickt haben, gelesen und ich nehme die Stelle gern an.
Als Starttermin schlage ich den ersten Januar vor. Wenn das für Sie passt, unterschreibe ich noch diese Woche.
Über eine kurze Bestätigung würde ich mich freuen.
Mit freundlichen Grüßen Ravi Chaudhary
anbieten is to offer, berichten is to report, annehmen is to accept, vorschlagen is to propose, die Rückmeldung is a response - and das Angebot is the offer.
Find all six relative clauses in the voicemail and all one in the reply. Then notice the rhythm: Frau Weber uses a relative clause every time she needs to identify something - the position (the one we discussed), the contract (the one I am sending), the colleague (the one who does your induction). That is what relative clauses are for. They let you name a thing precisely without starting a new sentence.
Read both aloud twice.
7. Bidirektional
Section titled “7. Bidirektional”Into German today. On Tag 53 you will translate these back the other way.
8. Sprechen - zehn Minuten
Section titled “8. Sprechen - zehn Minuten”Describe your own life in relative clauses. Stand up.
Du bist mein Deutschlehrer. Ich bin Lernender (Tag 51). Heute habe ichRelativsätze gelernt.
ERSTER TEIL - fünf Minuten. Stell mir zwölf Fragen, auf die ich miteinem Relativsatz antworten muss:- Wer ist ...? (Nominativ)- Welche/n ... nimmst du? (Akkusativ)- Wem hast du geholfen? (Dativ)- Mit wem arbeitest du? (Dativ mit Präposition)- Wo wohnst du? (wo)
Wenn ich das Relativpronomen weglasse - so wie im Englischen - sag nur"Pronomen fehlt" und lass mich den Satz wiederholen.
ZWEITER TEIL - fünf Minuten. Jetzt beschreibe ich dir fünf Menschen ausmeinem Leben, jeden in EINEM Satz mit Relativsatz: "Mein Bruder, der inIndien wohnt, ist Ingenieur."
Frag nach jedem Satz eine Nachfrage, die wieder einen Relativsatzbraucht. Maximal neun Wörter pro Frage.9. Auf Papier - Goldlist
Section titled “9. Auf Papier - Goldlist”Diktat. Ten-second loop on the shadowing audio. Six German words by hand, then correct in a second colour.
Die Relativpronomen-Tabelle. Draw all sixteen forms by hand from memory. Then, next to it, draw the definite-article table from Tag 42 and circle the three differences. Three forms is the entire new content of today, and seeing that on paper is worth more than any amount of reassurance.
Zehn Menschen und Dinge. By hand, in German: ten sentences, each describing someone or something real in your life with a relative clause. Your brother, your flat, the colleague you work with, the doctor you go to, the city you live in, the course you are doing.
Then go back and mark the case of each pronoun in the margin - Nom, Akk or Dat - and check it against the role the pronoun plays inside its own clause. That marking step is the exercise; the sentences are just the raw material.
Die Präpositions-Übung. Five sentences by hand with a preposition plus relative pronoun: mit dem, mit der, mit denen, bei der, zu dem. Preposition first, every time.
Fehlerliste. Week-eight page. Every wrong item, plus any sentence where you dropped the pronoun.
Genus-Farben. No new nouns. One pass down the list, each noun inside a relative clause: der Bus, der zu spät kommt, die Wohnung, die ich gesehen habe, das Formular, das ich brauche. Eight nouns.
Goldlist 17.
Seventeenth page - today is divisible by three.
-
Fresh double page, today’s date, plus Goldlist and the number 17.
-
Twenty-five items by hand, German left, English right, numbered. Take them from Tag 49 and Tag 50 - the
werdenforms and time words, and the six conjunctions with a full example sentence each. Write the conjunctions inside sentences, never alone:wenn ich Zeit habeteaches something,wenn = ifteaches nothing. -
Say each item aloud once as you write it. Once.
-
Read the whole list aloud once when finished, slowly, without stopping.
-
Close the notebook and walk away.
-
Write in your calendar, 14 days from today: Goldlist 17 distillieren - day 65, after the course. Diarise it.
Weiter: Tag 52 - Konjunktiv II - würde, könnte, hätte, wäre. Höflichkeit, Hypothesen, und die schwerste Seite im Kurs.