Tag 41 - Der Genitiv
Dieser Inhalt ist noch nicht in deiner Sprache verfügbar.
Tag 41 von 60 - der vierte Fall, und der kleinste. Zwei Stunden.
The last case. Nominativ on Tag 03, Akkusativ on Tag 08, Dativ on Tag 11, and today the Genitiv - possession, the of case.
Good news first, and it is unusually good news: the Genitiv is the case you will produce least often. Spoken German has quietly replaced most of it with von plus Dativ, which you already know. What you need today is to recognise it on every form, contract, headline and official letter you meet, and to produce it in the three or four fixed places where the von-version sounds wrong.
So today is mostly reading, with a small production core.
1. Aufwärmen - zehn Stück aus Tag 40
Section titled “1. Aufwärmen - zehn Stück aus Tag 40”The office, cold.
2. Shadowing - zehn Minuten
Section titled “2. Shadowing - zehn Minuten”Und dann Hören, fünf Minuten. Same clip, different job, and this is the half that self-study usually skips.
Play the whole forty seconds three times, without stopping and without reading anything on this page.
- First pass - words. Write down every German word you catch. Three is a result. Nine is a good day.
- Second pass - one sentence. Write down one complete sentence, even if half of it is a guess.
- Third pass - check yourself. Listen again and correct what you wrote.
There is no answer key, deliberately. No transcript is printed here and you are not meant to go hunting for one. A transcript would spare you the exact thing being trained: holding unfamiliar German in your head long enough to make sense of it. The clip never changes, so the only thing that can improve between today and the last day is you.
3. Neue Bausteine - der Genitiv
Section titled “3. Neue Bausteine - der Genitiv”Die Tabelle
Section titled “Die Tabelle”Four forms, and two of them are der.
| maskulin | neutrum | feminin | Plural | |
|---|---|---|---|---|
| Genitiv | des Mannes | des Kindes | der Frau | der Kinder |
| mit ein- | eines Mannes | eines Kindes | einer Frau | - |
| mit mein- | meines Mannes | meines Kindes | meiner Frau | meiner Kinder |
Say it as a rhythm, the way you learned the Dativ on Tag 11: des - des - der - der.
Note what is not there: no ein in the plural, as always.
Die zweite Hälfte - das Nomen bekommt ein -s
Section titled “Die zweite Hälfte - das Nomen bekommt ein -s”This is the part that makes the Genitiv visible even when the article is hidden. Masculine and neuter nouns take an ending in the Genitiv:
-son most nouns:des Vaters,des Autos,des Lehrers,des Hotels-eson one-syllable nouns and on nouns ending in s, ss, ß, z, sch, t:des Mannes,des Kindes,des Hauses,des Monats
Feminine and plural nouns take nothing at all: der Frau, der Woche, der Kinder, der Leute.
So the full picture, which is worth writing on your hand:
| Artikel | Nomen | |
|---|---|---|
| maskulin | des | + s / es |
| neutrum | des | + s / es |
| feminin | der | - |
| Plural | der | - |
Wie es aussieht
Section titled “Wie es aussieht”| Deutsch | English |
|---|---|
| das Ende der Woche | the end of the week |
| der Name des Kindes | the name of the child |
| die Farbe des Autos | the colour of the car |
| die Adresse der Firma | the address of the company |
| der Preis des Zimmers | the price of the room |
| die Nummer des Kontos | the number of the account |
| die Tochter meiner Schwester | my sister’s daughter |
| am Ende des Monats | at the end of the month |
Word order is the reverse of English: German puts the owner after the thing owned. der Name des Kindes is literally the name of-the child.
Die Genitivpräpositionen
Section titled “Die Genitivpräpositionen”Four, and the first two are the ones you will actually use:
| Deutsch | English | Beispiel |
|---|---|---|
| wegen | because of | wegen des Wetters |
| während | during | während der Woche |
| trotz | despite | trotz des Regens |
| statt | instead of | statt des Kaffees |
wegen is the high-value one: it is how you give a reason in a single phrase instead of a weil clause. Compare Tag 26 - Ich komme nicht, weil ich krank bin - with Ich komme nicht wegen der Krankheit. Both are right; the second is shorter.
Die zwölf Bausteine
Section titled “Die zwölf Bausteine”| Deutsch | English | Wann |
|---|---|---|
| am Ende der Woche | at the end of the week | fixed phrase |
| am Ende des Monats | at the end of the month | rent, salary, deadlines |
| Anfang des Jahres | at the start of the year | |
| die Adresse der Firma | the address of the company | forms |
| der Name des Kindes | the name of the child | forms |
| die Nummer des Kontos | the account number | the bank |
| wegen des Wetters | because of the weather | |
| wegen der Arbeit | because of work | the all-purpose reason |
| während der Woche | during the week | |
| trotz des Regens | despite the rain | Hamburg |
| das Auto meines Bruders | my brother’s car | |
| Ravis Adresse | Ravi’s address | names, no apostrophe |
4. Drills
Section titled “4. Drills”Substitutionsdrill - der Artikel wechselt
Section titled “Substitutionsdrill - der Artikel wechselt”Konversionsdrill - von plus Dativ wird Genitiv
Section titled “Konversionsdrill - von plus Dativ wird Genitiv”Same meaning, written form. This is the drill that builds production.
Konversionsdrill - weil wird wegen
Section titled “Konversionsdrill - weil wird wegen”Turn the clause into a phrase. The noun after wegen goes into the Genitiv.
Antwortdrill
Section titled “Antwortdrill”wessen is whose - the Genitiv question word. You will hear it rarely and read it often.
Übersetzungsdrill
Section titled “Übersetzungsdrill”Note the word order in two of those: Wegen des Wetters bleiben wir zu Hause - the phrase takes first position, so the verb comes second and the subject third. That is the Tag 05 rule, unchanged.
5. Wiederholung
Section titled “5. Wiederholung”Yesterday, two days back, five days back, twelve days back, thirty days back. Tag 11 is the thirty-day-old one - the dative prepositions.
6. Text und Hören
Section titled “6. Text und Hören”The Genitiv lives in writing, so today’s text is not a dialogue but the kind of letter that arrives in a German letterbox.
Sehr geehrter Herr Chaudhary,
wir bestätigen den Eingang Ihres Antrags vom 3. Oktober.
Die Bearbeitung des Antrags dauert in der Regel vier bis sechs Wochen. Wegen der hohen Zahl der Anträge kann es im Moment länger dauern. Wir bitten um Ihr Verständnis.
Bitte beachten Sie: Ohne die Bestätigung des Vermieters können wir den Antrag nicht bearbeiten. Diese fehlt in Ihren Unterlagen.
Sie erhalten am Ende des Monats einen neuen Termin. Bei Fragen erreichen Sie uns während der Öffnungszeiten unter der oben genannten Nummer.
Mit freundlichen Grüßen Behörde für Inneres und Sport
Count the Genitiv forms. There are seven: Ihres Antrags, des Antrags, der Zahl, der Anträge, des Vermieters, des Monats, der Öffnungszeiten. That density is normal for official German, and it is exactly why recognising the case matters more than producing it.
New words: bestätigen to confirm, der Eingang receipt or arrival, die Bearbeitung processing, in der Regel as a rule, das Verständnis understanding, beachten to note, die Unterlagen documents, erhalten to receive, erreichen to reach, die Öffnungszeiten opening hours, oben genannt named above.
Read it aloud once. Then answer three questions in German, out loud: Wie lange dauert die Bearbeitung? Was fehlt? Wann bekommt Ravi einen neuen Termin?
7. Bidirektional - die acht Sätze von Tag 39
Section titled “7. Bidirektional - die acht Sätze von Tag 39”Back the other way. The German is the prompt now; produce the English.
Notice that one of them contains a Genitiv you wrote two days ago without knowing it was one: am ersten des Monats.
8. Sprechen - zehn Minuten
Section titled “8. Sprechen - zehn Minuten”Ten minutes of reasons and deadlines, which is where the Genitiv actually earns its keep.
Du bist mein Deutschlehrer. Ich bin Lernender (Tag 41). Heute habe ichden Genitiv gelernt - des, des, der, der, und das -s am Nomen.
Stell mir fünfzehn Fragen, die eine Genitivantwort brauchen:- Wann? (am Ende des Monats, Anfang des Jahres, während der Woche)- Warum nicht? (wegen des Wetters, wegen der Arbeit, wegen der Krankheit)- Wessen? (das Auto meines Bruders, die Adresse der Firma)
Wenn ich "von dem" oder "von der" sage, akzeptiere es, aber frag dann:"Und wie schreibt man das?" - und lass mich die Genitivform bilden.
Korrigiere jedes fehlende -s am Nomen. Maximal neun Wörter pro Satz.Fang jetzt an.9. Auf Papier - Goldlist
Section titled “9. Auf Papier - Goldlist”Diktat. Ten-second loop on the shadowing audio. Six German words by hand, then correct in a second colour.
Die Tabelle. Write the Genitiv table from memory - four columns, the article row and the noun-ending row. Then under it, eight noun pairs written out in full: des Mannes, des Kindes, des Monats, des Jahres, des Autos, des Hauses, der Frau, der Woche. The last two are the control: no ending.
Satz des Tages. Five sentences by hand, each containing one Genitiv: one with am Ende, one with wegen, one with während, one with trotz, and one possession of your own - something that actually belongs to someone in your family.
Die Umschreib-Übung. Take the letter in section 6 and rewrite three of its sentences with von plus Dativ instead of the Genitiv. Then read both versions aloud. You are listening for the difference in register: the Genitiv sounds like an office, the von-version sounds like a person.
Fehlerliste. Week-six page. Every wrong item, German only. A missing noun ending gets the whole pair written out twice.
Genus-Farben. Nine new nouns from the letter. Blue: der Eingang, der Vermieter, der Antrag. Red: die Bearbeitung, die Zahl, die Bestätigung, die Unterlagen, die Öffnungszeiten. Green: das Verständnis.
Goldlist 9 - erste Destillation.
Day 41, minus 14 is day 27, so this is the first distillation of Goldlist page 9 - written two weeks ago and untouched since.
-
Find Goldlist 9. Twenty-five items, handwritten, fourteen days old.
-
Cover the English. Read the German aloud, one item at a time. Three seconds each.
-
Cross out everything you knew without hesitation and with the right article. Roughly a third usually goes, and it is still faintly startling that it does.
-
Copy the survivors onto a fresh page, headed Goldlist 9 - erste Destillation, numbered. Expect sixteen or seventeen.
-
Write in your calendar, 14 days from today: Goldlist 9 zweite Destillation - that is Tag 55.
Weiter: Tag 42 - Wiederholungstag - sechste Woche fertig. Alle vier Fälle in einer Tabelle, die Woche in Zahlen, und die acht Sätze von Tag 40 zurück.