Tag 01 - Erste Wörter
Dieser Inhalt ist noch nicht in deiner Sprache verfügbar.
Tag 01 von 60 - Aussprache, Begrüßung, sich vorstellen. Zwei Stunden.
Today is the smallest possible day: how German vowels actually sound, six greetings, and enough to say who you are and where you live. It will feel too easy. That is intended - the first week exists to get the sounds right before bad habits set, and to make day forty possible.
1. Aussprache - die fünf Vokale
Section titled “1. Aussprache - die fünf Vokale”German vowels are pure. English speakers slide one vowel into another without noticing: the English “o” in go is really “oh-u”. German does not do that. The mouth holds one position for the whole vowel.
Each vowel comes in a long and a short version. The rule of thumb that covers most cases:
| Signal | Length | Beispiel |
|---|---|---|
| Vowel followed by h | long | Bahnhof, ihm, wohnen |
| Vowel doubled | long | Tee, Saal, Boot |
| Vowel before one consonant | usually long | Tag, gut, Name |
| Vowel before two or more consonants | short | Mann, kommt, ist |
Say these pairs aloud, three times each. The difference is length, not quality:
| Lang | Kurz |
|---|---|
| Tag | Tasche |
| wen | wenn |
| ihn | in |
| Ofen | offen |
| Mut | Mutter |
2. Neue Bausteine - zwölf Stück
Section titled “2. Neue Bausteine - zwölf Stück”Read each one aloud twice before you start the drill. The English is only there to point at the meaning; you are learning the German, not the pair.
| Deutsch | English | Wann |
|---|---|---|
| Guten Morgen | good morning | until about 11:00 |
| Guten Tag | hello | the safe daytime greeting |
| Guten Abend | good evening | from about 18:00 |
| Hallo | hi | informal, any time |
| Tschüss | bye | informal |
| Auf Wiedersehen | goodbye | formal, and on the phone |
| Ich heiße Ravi | my name is Ravi | literally: I am called |
| Wie heißen Sie? | what is your name | formal |
| Ich bin aus Indien | I am from India | origin, country |
| Ich wohne in Hamburg | I live in Hamburg | where you live now |
| Ja, genau | yes, exactly | very common in conversation |
| Nein, danke | no, thank you |
3. Drills
Section titled “3. Drills”Four kinds, borrowed from the old Foreign Service method. They are mechanical on purpose: the point is speed and automaticity, not thought.
Substitutionsdrill
Section titled “Substitutionsdrill”Replace the word in brackets and say the whole new sentence.
Konversionsdrill
Section titled “Konversionsdrill”Give the matching pair: the greeting for the time of day, or the question that fits the answer.
Antwortdrill
Section titled “Antwortdrill”Answer as yourself, in a full sentence.
Übersetzungsdrill
Section titled “Übersetzungsdrill”4. Sofortwiederholung
Section titled “4. Sofortwiederholung”There is nothing from yesterday to review, so today’s repetition happens inside the session instead. Shuffle this and run it twice - once now, once at the very end of your two hours.
5. Text und Hören
Section titled “5. Text und Hören”Every line uses only what you learned today.
A: Guten Tag! Wie heißen Sie? B: Hallo! Ich heiße Ravi. A: Ich heiße Anna. Ich wohne in Hamburg. B: Ich wohne in Hamburg. Ich bin aus Indien. A: Auf Wiedersehen! B: Tschüss!
Read it aloud twice, both parts. Then cover the text and say B’s lines from memory.
Und dann Hören, fünf Minuten. Same clip, different job, and this is the half that self-study usually skips.
Play the whole forty seconds three times, without stopping and without reading anything on this page.
- First pass - words. Write down every German word you catch. Three is a result. Nine is a good day.
- Second pass - one sentence. Write down one complete sentence, even if half of it is a guess.
- Third pass - check yourself. Listen again and correct what you wrote.
There is no answer key, deliberately. No transcript is printed here and you are not meant to go hunting for one. A transcript would spare you the exact thing being trained: holding unfamiliar German in your head long enough to make sense of it. The clip never changes, so the only thing that can improve between today and the last day is you.
6. Bidirektional
Section titled “6. Bidirektional”Translate into German. Then compare - and read the difference between your line and the model out loud. On Tag 03 you will translate these back the other way, so do them properly now.
7. Sprechen - zehn Minuten
Section titled “7. Sprechen - zehn Minuten”Paste this into a voice AI and actually speak. Ten minutes, out loud, standing up.
Du bist eine freundliche Person in einem Café in Hamburg. Ich bin absoluterAnfänger (Tag 1, A1). Sprich sehr langsam und nur mit diesen Wörtern:Guten Morgen, Guten Tag, Guten Abend, Hallo, Tschüss, Auf Wiedersehen,Ich heiße, Wie heißen Sie, Ich bin aus, Ich wohne in, Ja genau, Nein danke.Stelle mir nur zwei Fragen: wie ich heiße und wo ich wohne. Maximal fünfWörter pro Satz. Wenn ich einen Fehler mache, wiederhole den Satz einfachrichtig, ohne Erklärung. Fang jetzt an und begrüße mich.8. Auf Papier
Section titled “8. Auf Papier”Diktat. Play the shadowing audio again. Write down any five German words you hear, by hand, without pausing. You will get some wrong - that is fine, the point is ear to hand.
Satz des Tages. Write these three by hand, from memory, then check them against section 2:
- Your name.
- Where you are from.
- Where you live.
Then write them a second time as one connected sentence using und.
Fehlerliste. Start a page in your notebook called Fehler. Write down every item the drills marked wrong today, in German, correctly. Do not write the English.
Genus-Farben. Nothing to do today - the first nouns arrive on Tag 03, and from then on every noun goes in your notebook in colour: der blue, die red, das green.
Goldlist. Not today either. The first Goldlist page is Tag 03.
Weiter: Tag 02 - sein und Fragen - die Umlaute, das Verb sein, und die Fragewörter wie, wo, was.