Tag 47 - Das Vorstellungsgespräch
Dieser Inhalt ist noch nicht in deiner Sprache verfügbar.
Tag 47 von 60 - erzählen Sie etwas über sich, Stärken und Schwächen, und die eigenen Fragen. Zwei Stunden.
Yesterday’s letter got you into the room. Today is the room.
A German interview is more predictable than an English one, which is good news for someone working at A2. There are about eight questions, they come in a recognisable order, and the first one is always the same. If you have prepared four minutes of structured German, you have prepared most of the interview.
What you cannot prepare is the moment you do not understand a question. So one of today’s twelve Bausteine is the sentence that handles exactly that, and it is the most important one on the page.
1. Aufwärmen - zehn Stück aus Tag 46
Section titled “1. Aufwärmen - zehn Stück aus Tag 46”The application, cold.
2. Shadowing - zehn Minuten
Section titled “2. Shadowing - zehn Minuten”Und dann Hören, fünf Minuten. Same clip, different job, and this is the half that self-study usually skips.
Play the whole forty seconds three times, without stopping and without reading anything on this page.
- First pass - words. Write down every German word you catch. Three is a result. Nine is a good day.
- Second pass - one sentence. Write down one complete sentence, even if half of it is a guess.
- Third pass - check yourself. Listen again and correct what you wrote.
There is no answer key, deliberately. No transcript is printed here and you are not meant to go hunting for one. A transcript would spare you the exact thing being trained: holding unfamiliar German in your head long enough to make sense of it. The clip never changes, so the only thing that can improve between today and the last day is you.
3. Neue Bausteine - zwölf Stück
Section titled “3. Neue Bausteine - zwölf Stück”Erzählen Sie etwas über sich - Gegenwart, Vergangenheit, Zukunft
Section titled “Erzählen Sie etwas über sich - Gegenwart, Vergangenheit, Zukunft”This is always the first question, and German interview coaching gives it a fixed three-part shape. Use it. It converts the most open question in the interview into a structure you can rehearse.
| Teil | Was | Beispiel |
|---|---|---|
| 1. Gegenwart | what you are doing now | Zurzeit mache ich einen MBA in Hamburg. |
| 2. Vergangenheit | what you did before, and what you learned | Davor habe ich vier Jahre in der Schifffahrt gearbeitet. |
| 3. Zukunft | what you want next, pointing at this job | In Zukunft möchte ich Projekte im Bereich Energie leiten. |
Three minutes, in that order, and the third part is the one that makes it an answer rather than a biography. In Zukunft möchte ich ... is the sentence that connects you to the vacancy.
Die Fragen, die garantiert kommen
Section titled “Die Fragen, die garantiert kommen”| Deutsch | English |
|---|---|
| Erzählen Sie etwas über sich. | Tell us about yourself. |
| Warum möchten Sie bei uns arbeiten? | Why do you want to work for us? |
| Warum haben Sie sich beworben? | Why did you apply? |
| Was sind Ihre Stärken? | What are your strengths? |
| Was sind Ihre Schwächen? | What are your weaknesses? |
| Wo sehen Sie sich in fünf Jahren? | Where do you see yourself in five years? |
| Wie gut ist Ihr Deutsch? | How good is your German? |
| Ab wann können Sie anfangen? | From when can you start? |
| Was ist Ihre Gehaltsvorstellung? | What is your salary expectation? |
| Haben Sie noch Fragen? | Do you have any questions? |
Stärken und Schwächen
Section titled “Stärken und Schwächen”German interviewers ask for a weakness and expect a real one. The English trick of naming a disguised strength - I work too hard - reads as evasive.
| Stärke | Schwäche |
|---|---|
| Ich arbeite gern im Team. | Ich bin manchmal zu direkt. |
| Ich bin sehr strukturiert. | Ich arbeite manchmal zu detailliert. |
| Ich bleibe auch unter Druck ruhig. | Mein Deutsch ist noch nicht perfekt. |
| Ich lerne schnell. | Ich muss lernen, früher um Hilfe zu bitten. |
And name what you are doing about it in the same breath: Mein Deutsch ist noch nicht perfekt - deshalb lerne ich jeden Tag zwei Stunden. A weakness plus a measure is a strong answer; a weakness alone is just a weakness.
Die eigenen Fragen
Section titled “Die eigenen Fragen”Haben Sie noch Fragen? is not politeness. Having none is read as having no interest. Four, prepared:
| Deutsch | English |
|---|---|
| Wie sieht ein typischer Arbeitstag aus? | What does a typical working day look like? |
| Wie ist das Team aufgebaut? | How is the team structured? |
| Gibt es eine Einarbeitung? | Is there an induction? |
| Wie lange ist die Probezeit? | How long is the probation period? |
| Wann kann ich mit einer Entscheidung rechnen? | When can I expect a decision? |
die Probezeit is normally six months in Germany, during which either side can end the contract with two weeks’ notice. Asking about it is completely normal and signals that you know how German employment works.
Die zwölf Bausteine
Section titled “Die zwölf Bausteine”| Deutsch | English | Wann |
|---|---|---|
| Vielen Dank für die Einladung | thank you for the invitation | the first thing you say |
| Zurzeit mache ich einen MBA in Hamburg | I am currently doing an MBA in Hamburg | Gegenwart |
| Davor habe ich vier Jahre gearbeitet | before that I worked for four years | Vergangenheit |
| In Zukunft möchte ich Projekte leiten | in future I would like to lead projects | Zukunft |
| Ich arbeite gern im Team | I like working in a team | Stärke |
| Ich bleibe auch unter Druck ruhig | I stay calm under pressure too | Stärke |
| Mein Deutsch ist noch nicht perfekt, deshalb lerne ich täglich | my German is not perfect yet, so I study daily | Schwäche plus Maßnahme |
| Entschuldigung, können Sie die Frage wiederholen? | sorry, could you repeat the question | the rescue |
| Darf ich eine Frage stellen? | may I ask a question | |
| Wie sieht ein typischer Arbeitstag aus? | what does a typical day look like | your question |
| Wie lange ist die Probezeit? | how long is the probation period | your question |
| Wann kann ich mit einer Entscheidung rechnen? | when can I expect a decision | the closing question |
4. Drills
Section titled “4. Drills”Der Drei-Teile-Drill
Section titled “Der Drei-Teile-Drill”Build the self-presentation one part at a time, then all three together. Use your own facts.
Antwortdrill - die acht Fragen
Section titled “Antwortdrill - die acht Fragen”Full sentences, out loud, your own facts. This is the core drill of the day.
Substitutionsdrill
Section titled “Substitutionsdrill”Konversionsdrill - weil und deshalb
Section titled “Konversionsdrill - weil und deshalb”Two ways to join a reason to a result, and the word order differs. weil sends the verb to the end; deshalb keeps it in second position.
Übersetzungsdrill
Section titled “Übersetzungsdrill”5. Wiederholung
Section titled “5. Wiederholung”Yesterday, two days back, five days back, twelve days back, thirty days back. Tag 17 is the thirty-day-old one - the clock, which matters today because an interview is at vierzehn Uhr and you arrive ten minutes early.
6. Text und Hören
Section titled “6. Text und Hören”The interview, compressed. Twenty-two lines, and the whole of it is answerable with what is on this page.
Frau Weber: Herr Chaudhary, kommen Sie herein. Hatten Sie eine gute Anfahrt? Ravi: Ja, danke. Und vielen Dank für die Einladung. Frau Weber: Gern. Dann fangen wir an. Erzählen Sie etwas über sich. Ravi: Zurzeit mache ich einen MBA in Hamburg. Davor habe ich vier Jahre in der Schifffahrt gearbeitet - technisch, mit Projekten und Budgets. In Zukunft möchte ich Projekte im Bereich Energie leiten. Frau Weber: Und warum bei uns? Ravi: Weil Sie international arbeiten und weil die Projekte technisch sind. Das passt zu meiner Erfahrung. Frau Weber: Was sind Ihre Stärken? Ravi: Ich arbeite gern im Team und ich bleibe auch unter Druck ruhig. Auf einem Schiff lernt man das. Frau Weber: Und Ihre Schwächen? Ravi: Mein Deutsch ist noch nicht perfekt. Deshalb lerne ich jeden Tag zwei Stunden - zurzeit A2, mein Ziel ist B1 im nächsten Jahr. Frau Weber: Das hören wir gern. Wie würden Sie mit einem Konflikt im Team umgehen? Ravi: Entschuldigung, können Sie die Frage wiederholen? Frau Weber: Was machen Sie, wenn es im Team Streit gibt? Ravi: Ich spreche zuerst mit beiden Seiten. Allein, nicht zusammen. Dann suche ich eine Lösung. Frau Weber: Gut. Ab wann könnten Sie anfangen? Ravi: Ab dem ersten Januar. Frau Weber: Und Ihre Gehaltsvorstellung? Ravi: Brutto im Jahr - ich habe eine Zahl im Kopf. Darf ich sie nennen? Frau Weber: Bitte. Ravi: [Betrag] Euro. Frau Weber: Das ist im Rahmen. Haben Sie noch Fragen? Ravi: Ja, zwei. Wie sieht ein typischer Arbeitstag aus? Und wie lange ist die Probezeit? Frau Weber: Sechs Monate, wie üblich. Und der Arbeitstag ist sehr unterschiedlich - das erkläre ich Ihnen gleich. Wann könnten Sie mit einer Entscheidung rechnen, wollten Sie noch fragen? Ravi: Genau das, ja. Frau Weber: Nächste Woche Mittwoch. Wir rufen Sie an.
die Anfahrt is the journey there, umgehen mit is to deal with, der Streit is a quarrel, die Lösung is the solution, im Rahmen means within range, üblich is customary, unterschiedlich is varied.
Read it aloud twice, both parts. Then cover Ravi’s lines and answer as yourself, with your own facts.
7. Bidirektional
Section titled “7. Bidirektional”Into German today. On Tag 49 you will translate these back the other way.
8. Sprechen - zehn Minuten, und besser zwanzig
Section titled “8. Sprechen - zehn Minuten, und besser zwanzig”The interview, twice, with the second run harder. Stand up, dressed, phone away.
Du bist Frau Weber, Personalleiterin bei einem HamburgerEnergieunternehmen. Ich bin Lernender (Tag 47) und habe einVorstellungsgespräch für eine Stelle als Projektmanager.
Führe das Gespräch von Anfang bis Ende: Begrüßung, "Erzählen Sie etwasüber sich", warum wir, Stärken, Schwächen, fünf Jahre, Deutschniveau,Eintrittstermin, Gehalt, und am Ende "Haben Sie noch Fragen?".
Regeln:- Sieze mich durchgehend. Sprich normal schnell, nicht langsam.- Korrigiere NICHTS während des Gesprächs.- Stell EINE Frage mit einem Wort, das ich wahrscheinlich nicht kenne. Ich muss dann sagen, dass ich nicht verstanden habe.- Wenn ich am Ende keine eigenen Fragen stelle, sag das deutlich.
Danach: drei Sätze Feedback. Was war gut, was war unklar, und welcheAntwort würde ein deutscher Arbeitgeber als zu kurz empfinden.
Dann machen wir es NOCH EINMAL, von vorn, mit denselben Fragen.9. Auf Papier - Goldlist
Section titled “9. Auf Papier - Goldlist”Diktat. Ten-second loop on the shadowing audio. Six German words by hand, then correct in a second colour.
Die Selbstpräsentation, von Hand. Write your three-part answer to Erzählen Sie etwas über sich out in full: Gegenwart, Vergangenheit, Zukunft, two or three sentences each. Your own facts, in German, about eight lines.
Then read it aloud, timed. Aim for two to three minutes. If it runs under ninety seconds it is too thin; over four, it is a biography and the interviewer has stopped listening.
Zwei Stärken, eine Schwäche. By hand: two strengths with a one-line example each, and one real weakness with the measure you are taking about it. Four lines. The example is what makes a strength credible - Ich bleibe unter Druck ruhig means nothing on its own; Auf einem Schiff lernt man das means something.
Deine vier Fragen. Write the four questions you will ask, by hand, in German. Not three. Interviews run long and two of yours will get answered before you ask them.
Fehlerliste. Week-seven page. Every wrong item from today, plus the one word from the speaking block that you did not know.
Genus-Farben. Ten new nouns. Blue: der Druck, der Arbeitstag, der Streit, der Rahmen. Red: die Einladung, die Stärke, die Schwäche, die Probezeit, die Einarbeitung, die Entscheidung, die Lösung. Green: das Vorstellungsgespräch, das Ziel.
Goldlist 11 - erste Destillation.
Day 47, minus 14 is day 33, so this is the first distillation of Goldlist page 11.
-
Find Goldlist 11. Twenty-five items, fourteen days old, untouched since.
-
Cover the English. Read the German aloud, three seconds each.
-
Cross out every item you knew without hesitation and with the right article.
-
Copy the survivors onto a fresh page headed Goldlist 11 - erste Destillation, numbered. Expect sixteen or seventeen.
-
Write in your calendar, 14 days from today: Goldlist 11 zweite Destillation - that is Tag 61, which is past the end of the course. Diarise it anyway. The notebook outlives the sixty days, and it should.
Weiter: Tag 48 - Wiederholungstag - kein neuer Stoff, die ganze Woche Schrift und Telefon in einer Übersicht, zwanzig Minuten sprechen, und Goldlist 16.