Zum Inhalt springen

Tag 09 - Akkusativpronomen

Dieser Inhalt ist noch nicht in deiner Sprache verfügbar.

Tag 09 von 60 - verschluckte Endungen, mich, dich, ihn, sie, uns. Zwei Stunden.


Yesterday the accusative changed the article in front of a noun. Today it changes the pronoun that replaces the noun entirely - and this is where German pays you back for yesterday’s work, because the pronouns are short, they come up constantly, and three of the eight do not change at all.

The sentence you will get the most use out of today is Ich verstehe Sie nicht. You have been saying Ich verstehe nicht since Tag 02. Adding the one word Sie turns a vague statement into a specific one, and in a real conversation that difference decides whether the other person slows down or switches to English.

The accusative, cold, before anything new lands on it.

Nine days of learning how letters sound. Today: the letters Germans do not say.

Written German is full of unstressed -e and -en endings. Spoken German swallows most of them. This is not sloppiness or dialect - it is how the standard language is pronounced, including on the news, and it is the single biggest reason a sentence you can read perfectly sounds like noise when someone says it.

GeschriebenGesprochenWas passiert
habenhab’nthe e disappears, the n attaches to the b
machenmach’nsame
kommenkomm’nsame
gehengeh’nsame
einenein’nthe whole ending collapses
habe ichhab ichthe e vanishes completely
eine Frageein’ Frag’both reduced, but never deleted in careful speech

The rule of thumb: an unstressed e between consonants gets reduced to almost nothing, and -en becomes a syllabic n. You should still write every letter. You should just stop expecting to hear them.

Say each pair aloud, first the careful form, then the real one:

SorgfältigNormal
Ich habe einen Moment.Ich hab’ ein’n Moment.
Was machen Sie?Was mach’n Sie?
Woher kommen Sie?Woher komm’n Sie?
Haben Sie Zeit?Hab’n Sie Zeit?
Wir gehen jetzt.Wir geh’n jetzt.

A pronoun replaces a noun, so it has to carry the same case the noun would have. Here is the full set beside the nominative you already know from Tag 05:

NominativAkkusativEnglish
ichmichme
dudichyou (informal)
erihnhim / it (masculine)
siesieher / it (feminine)
esesit (neuter)
wirunsus
ihreuchyou (plural informal)
sie / Siesie / Siethem / you (formal)

Three of them do not move at all: sie, es and Sie. Two change in a way you can almost guess: ich → mich, du → dich. The one genuinely new form is er → ihn, and it is the one to drill hardest, because it carries the same -n logic as yesterday’s den.

Watch what happens when a noun is replaced:

Mit NomenMit Pronomen
Ich nehme den Zug.Ich nehme ihn.
Ich brauche die Adresse.Ich brauche sie.
Ich kaufe das Buch.Ich kaufe es.
Ich verstehe die Frau nicht.Ich verstehe sie nicht.

Notice that der Zug becomes ihn, not es. German pronouns follow the grammatical gender of the noun, not whether the thing is alive. A train is a he. A street is a she. This is the thing that will feel most foreign today and it is non-negotiable - it is why the colour list in your notebook matters.

Read each one aloud twice before the drill.

DeutschEnglishWann
Ich verstehe Sie nichtI do not understand youthe most useful sentence today
Verstehen Sie mich?do you understand methe check you should run constantly
Können Sie mich verstehen?can you understand mesofter version of the same
Ich kenne ihnI know himkennen, for people and places
Ich kenne sie nichtI do not know hersame sie for her and them
Entschuldigen Sie michexcuse me (leaving)different from Entschuldigung
Wie finden Sie es?how do you like itliterally: how do you find it
Ich finde es gutI like itthe all-purpose opinion
Ich finde es zu teuerI find it too expensivebuilds on Tag 04
Rufen Sie mich ancall meanrufen, split in two
Ich hole Sie abI will pick you upabholen, same split
Darf ich Sie etwas fragen?may I ask you somethingthe polite opener

Replace the pronoun and say the whole new sentence.

Replace the underlined noun with the right pronoun. Gender decides, not meaning.

Answer in a full sentence, using a pronoun rather than repeating the noun.

Yesterday, two days back, five days back. Tag 04 is the five-day-old one, and kein is about to collide with yesterday’s keinen - which is exactly why it is scheduled today.

Two people who have met before. Count the pronouns - there are nine, and every one is in the accusative.

Anna: Guten Tag, Ravi! Kennen Sie Herrn Weber? Ravi: Nein, ich kenne ihn nicht. Darf ich Sie etwas fragen? Anna: Ja, genau. Ravi: Ich verstehe Sie manchmal nicht. Sprechen Sie bitte langsam. Anna: Natürlich. Verstehen Sie mich jetzt? Ravi: Ja, jetzt verstehe ich Sie gut. Danke! Anna: Wie finden Sie Hamburg? Ravi: Ich finde es sehr gut. Aber ich kenne die Stadt nicht. Anna: Ich hole Sie am Samstag ab. Rufen Sie mich an. Ravi: Gern. Ich rufe Sie heute Abend an.

Two small new words slipped in - manchmal sometimes, natürlich of course, gern gladly, heute Abend this evening. Take them as free vocabulary; nothing in today’s drills depends on them.

Read it aloud twice, both parts, with the swallowed endings from section 2: Kenn'n Sie, Versteh'n Sie mich jetzt, Ich ruf' Sie heut' Abend an. Then cover Ravi’s lines and produce them from Anna’s cues.

Und dann Hören, fünf Minuten. Same clip, different job, and this is the half that self-study usually skips.

Play the whole forty seconds three times, without stopping and without reading anything on this page.

  1. First pass - words. Write down every German word you catch. Three is a result. Nine is a good day.
  2. Second pass - one sentence. Write down one complete sentence, even if half of it is a guess.
  3. Third pass - check yourself. Listen again and correct what you wrote.

There is no answer key, deliberately. No transcript is printed here and you are not meant to go hunting for one. A transcript would spare you the exact thing being trained: holding unfamiliar German in your head long enough to make sense of it. The clip never changes, so the only thing that can improve between today and the last day is you.

The eight sentences you translated into German on Tag 07, coming back the other way. Do not look them up first. The gap between your English and the model English is the lesson - and this direction is harder than it looks, because recognising a German sentence and producing a natural English one are different skills.

Today the AI plays someone you have met once before, so pronouns are unavoidable. Stand up.

Du bist Anna, eine Bekannte aus Hamburg. Wir haben uns einmal getroffen.
Ich bin Anfänger (Tag 9, A1). Heute übe ich die Akkusativpronomen:
mich, Sie, ihn, sie, es, uns.
Sprich langsam, maximal sieben Wörter pro Satz. Stelle mir oft Fragen wie
"Kennen Sie ...?", "Verstehen Sie mich?", "Wie finden Sie ...?", damit ich
mit einem Pronomen antworten muss. Sprich über: Hamburg, den Bahnhof,
den Kaffee, das Buch, die Stadt, Herrn Weber, Frau Schmidt.
Wenn ich das falsche Pronomen benutze - zum Beispiel "es" für "der Zug" -
wiederhole meinen Satz einfach richtig, ohne Erklärung, und mach weiter.
Korrigiere nichts anderes. Fang jetzt an und begrüße mich.

Diktat. Ten-second loop on the shadowing audio. Write six German words by hand without pausing, then correct them in a second colour. Today, circle any ending you wrote that you could not actually hear.

Satz des Tages. Write out by hand, from memory, four sentences you would say to someone whose German you cannot follow: that you do not understand them, that you are learning German, asking them to speak slowly, and asking them to repeat. Four lines. Check against sections 3 and the Tag 07 page.

Die Pronomen-Tabelle. Copy the eight-row nominative/accusative table from section 3 by hand, once, with ihn in a different colour. Add it to the Akkusativ page you started yesterday - the two belong together and both get a third column on Tag 11.

Fehlerliste. Week-two page. Every item the drills marked wrong today, written correctly, in German only. Any wrong pronoun gets written twice.

Genus-Farben. No new nouns today - today was pronouns. Instead, go down your existing colour list and say the right accusative pronoun for each noun out loud: blue nouns take ihn, red nouns take sie, green nouns take es. That one pass is worth more than adding new words.

Goldlist 3.

Third Goldlist page of the course. Goldlist 1 went in on Tag 03 and comes up for distillation on Tag 17; Goldlist 2 went in on Tag 06 and comes up on Tag 20. You do not open either of them today.

Same strict shape as before:

  1. Open a fresh double page and write today’s date at the top, plus Goldlist and the number 3. You will need that date in fourteen days and you will not remember it otherwise.

  2. Write twenty-five items by hand, German on the left, English on the right, numbered. Take them from Tag 07, Tag 08 and today: the ones you failed, the ones you ticked nervously, and a few you are confident about so the list is not all pain. Nothing that is already on Goldlist 1 or 2.

  3. Say each item aloud once as you write it. Once. The writing is slow enough to do the work.

  4. Read the whole list aloud once when it is finished, slowly, top to bottom, without stopping.

  5. Close the notebook and walk away. No testing, no rereading tonight, no photograph, no app.

  6. Write in your calendar, 14 days from today: Goldlist 3 distillieren - that is Tag 23.

Steps five and six are the entire method. The claim is that a share of what you write and say once, unhurried, settles on its own, and that testing it early interferes with the settling. On Tag 23 you will read this page once, cross out what stayed, and copy the rest onto a new page. Roughly a third usually stays without any review at all.


Weiter: Tag 10 - Ich möchte - die letzten Konsonanten, Essen und Trinken, Mengen, und der letzte Aussprachetag.