Zum Inhalt springen

Tag 05 - Verben im Präsens

Dieser Inhalt ist noch nicht in deiner Sprache verfügbar.

Tag 05 von 60 - die Wortbetonung, die Endungen im Präsens, die Pronomen, und das Verb an zweiter Stelle. Zwei Stunden.


Until today you have been using verbs as whole chunks: ich heiße, ich wohne, Haben Sie Zeit?. Today the chunk comes apart. Five regular verbs, six endings, nine pronouns, and suddenly you can build sentences that were never on a list.

The second half of the day is one rule, and it is the rule that makes German sound German: the conjugated verb is the second element of the sentence. Not the second word - the second element. Put anything you like in front of it, and the subject moves behind it. English does not do this, so it has to be drilled rather than understood.

The sounds block is about stress. German puts the weight on the stem of the word, and in a simple word that means the first syllable. Get that wrong and you can be fully correct and still hard to follow.

Cold, before anything else. haben, kein and the prices from yesterday.

Every German word has one syllable that carries the weight. The rule for almost everything you will meet this month:

German stresses the stem, and in a simple word the stem is the first syllable.

WortBetontWarum
wohnenWOH-nensimple word, first syllable
kommenKOM-mensimple word, first syllable
lernenLER-nensimple word, first syllable
arbeitenAR-bei-tenstill the first syllable
BahnhofBAHN-hofcompound: the first part wins
verstehenver-STE-henver- is an unstressed prefix, so the stem takes it
Entschuldigungent-SCHUL-di-gungent- is unstressed, the stem is schuld
Studentstu-DENTborrowed word, stress at the end
studierenstu-DIE-renverbs in -ieren stress the ie

Two groups break the first-syllable habit, and both break it for the same reason: the first syllable is not the stem. Unstressed prefixes (be-, ge-, ver-, ent-, er-) never take the stress, and borrowed words keep something close to their original pattern.

The -en ending gets swallowed. In writing, wohnen has a clear e in the second syllable. In speech, that e almost disappears and the ending collapses onto the n: WOHN-n, KOMM-m, LERN-n. This is why wir haben so often sounds like a single squeezed hahm and why spoken German sounds faster than it is. Nothing is missing - the weight simply all sits at the front and the ending is thrown away.

Say each of these three times, hitting the first syllable hard and letting the ending go: wohnen, kommen, lernen, machen, arbeiten, haben, sprechen.

Read each one aloud twice before the drill. Notice how many of them are the same three verbs with a different ending.

DeutschEnglishWann
Ich wohne in HamburgI live in Hamburgnow with the ending visible
Ich komme aus IndienI come from Indiaorigin, the everyday version
Ich arbeite in HamburgI work in Hamburgarbeiten needs a helper e
Ich lerne DeutschI am learning GermanGerman has one present tense, not two
Er kommt aus Berlinhe comes from Berlinthird person, -t
Sie wohnt in Münchenshe lives in Munichshe, small s
Wir lernen zusammenwe learn togetherwir takes the plain infinitive ending
Ich studiere an der TUHHI study at the TUHHstudieren, stress on the ie
Was machen Sie?what do you dojob, or right now
Ich mache einen MBAI am doing an MBAder MBA, so einen
Er arbeitet nichthe does not worknicht goes after the verb
Sie sprechen schnellyou speak fastsay this to anyone, often

Die Endungen. Take the infinitive, cut off the -en, and you have the stem. Then hang six endings on it. This is the whole regular present tense:

PersonEndungwohnenkommenlernenmachenarbeiten
ich-ewohnekommelernemachearbeite
du-stwohnstkommstlernstmachstarbeitest
er / sie / es-twohntkommtlerntmachtarbeitet
wir-enwohnenkommenlernenmachenarbeiten
ihr-twohntkommtlerntmachtarbeitet
sie / Sie-enwohnenkommenlernenmachenarbeiten

Three things fall out of that table. The wir, sie and Sie forms are identical to the infinitive, so half the work is already done. The er and ihr forms are identical to each other, and context tells them apart. And German has one present tense: ich lerne covers both I learn and I am learning, so stop looking for the second one.

arbeiten takes an extra e. A stem ending in t or d cannot have -st or -t glued straight on - arbeitst is unpronounceable. So an e is inserted: du arbeitest, er arbeitet, ihr arbeitet. The same happens with finden and warten later. It is a pronunciation fix, not a new rule to memorise.

Die Pronomen. Nine of them, but only seven shapes:

DeutschEnglishAnmerkung
ichIsmall i, always
duyouone person you know
erhe
sieshesmall s
esit
wirwe
ihryoumore than one person you know
sietheysmall s again
Sieyou (formal)capital S, always, singular or plural

sie is doing three jobs: she, they and, with a capital, you. The verb ending sorts it out - sie wohnt can only be she lives, sie wohnen can only be they live or you live.

Das Verb steht an zweiter Stelle. The rule that shapes every German statement. The conjugated verb sits in slot two, and slot one can hold anything you want to foreground. If you put something other than the subject in slot one, the subject does not disappear - it moves behind the verb.

  1. Start from the plain order, subject first:

    Ich lerne heute Deutsch. - subject in slot 1, verb in slot 2.

  2. Decide to foreground the time instead. Move heute to the front - and move nothing else:

    Heute lerne ich Deutsch. - heute is slot 1, lerne is still slot 2, and ich has slid in behind it.

  3. The wrong version, which is the one your English brain will produce for the next month:

    Heute ich lerne Deutsch. - this has the verb in slot 3. It is always wrong.

Laid out as slots, with the place phrase counting as one single element:

12Rest
Icharbeiteheute in Hamburg
Heutearbeiteich in Hamburg
In Hamburgarbeiteich heute

Note that in Hamburg is two words but one element, which is why the verb still counts as second. The test is not words, it is blocks of meaning.

Four kinds, borrowed from the old Foreign Service method. Mechanical on purpose: speed and automaticity, not thought.

Replace the word in brackets and say the whole new sentence.

Conjugate. You get a pronoun and an infinitive, you give back the pronoun with the correct form. Fast, without looking at the table.

Answer as yourself, in a full sentence.

The scheduled review: Tag 04 first, then Tag 03, with today’s verbs mixed in. Sixty seconds, as many as you can, and run it twice - once now and once before you close the page.

Every line uses only what you have had by today.

A: Guten Tag! Wie geht es Ihnen? B: Danke, gut. Und Ihnen? A: Gut, danke. Wo wohnen Sie? B: Ich wohne in Hamburg. Ich komme aus Indien. A: Und was machen Sie? B: Ich mache einen MBA. Ich studiere an der TUHH. A: Sehr gut. Sie lernen auch Deutsch? B: Ja, genau. Ich lerne Deutsch. Sie sprechen schnell!

Read it aloud twice, both parts. Then cover the text and say B’s lines from memory - they are all about you, so there is no excuse.

Und dann Hören, fünf Minuten. Same clip, different job, and this is the half that self-study usually skips.

Play the whole forty seconds three times, without stopping and without reading anything on this page.

  1. First pass - words. Write down every German word you catch. Three is a result. Nine is a good day.
  2. Second pass - one sentence. Write down one complete sentence, even if half of it is a guess.
  3. Third pass - check yourself. Listen again and correct what you wrote.

There is no answer key, deliberately. No transcript is printed here and you are not meant to go hunting for one. A transcript would spare you the exact thing being trained: holding unfamiliar German in your head long enough to make sense of it. The clip never changes, so the only thing that can improve between today and the last day is you.

These are the eight sentences you turned into German on Tag 02, coming back the other way. Read each German line, then write the English without looking at Tag 02. Then compare - the gap between your English and the model is the part you did not really own two days ago.

Paste this into a voice AI and actually speak. Ten minutes, out loud, standing up.

Du bist eine freundliche Person an einem Bahnhof in Hamburg. Ich bin
Anfänger (Tag 2, A1). Sprich sehr langsam und nur mit diesen Wörtern:
Guten Tag, Hallo, Tschüss, Auf Wiedersehen, Entschuldigung, Wie geht es
Ihnen, Danke gut, Und Ihnen, Ich bin müde, Ich bin Student, Sind Sie aus
Deutschland, Wo ist der Bahnhof, Was ist das, Das ist ein Café, Sprechen
Sie Englisch, Ich verstehe nicht, Ich heiße, Ich wohne in, Ich bin aus,
Ja genau, Nein danke.
Stelle mir drei Fragen: wie es mir geht, woher ich komme, und ob ich
Student bin. Benutze nur die Formen von sein: bin, bist, ist, sind, seid.
Maximal sechs Wörter pro Satz. Wenn ich einen Fehler mache, wiederhole den
Satz einfach richtig, ohne Erklärung. Fang jetzt an und begrüße mich.

Diktat. Play the shadowing audio again. Write down any five German words you hear, by hand, without pausing. Then mark every umlaut you wrote, and any you think you heard but could not place.

Satz des Tages. Write the six forms of sein by hand, in order, without looking: ich, du, er, wir, ihr, Sie. Then write three sentences by hand, from memory:

  1. That you are tired.
  2. That you are a student and you are from India.
  3. A question asking a stranger where the station is.

Check them against section 3 only after all three are on paper.

Fehlerliste. Add today’s wrong answers to the Fehler page in your notebook, in German, correctly, no English. If a mistake was an umlaut, circle the umlaut.

Genus-Farben. Still nothing to do - the first nouns arrive tomorrow. Get three coloured pens ready today: blue for der, red for die, green for das.

Goldlist. Starts tomorrow. Today, just put a dated heading on a fresh double page of your notebook and leave it empty.


Weiter: Tag 06 - Wiederholungstag - kein neuer Stoff, ein längerer Dialog, und zwanzig Minuten sprechen.